OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013 Implementation of BulRIS Project BULGARIAN PORTS INFRASTRUCTURE CO. RIS Workshop Danube Commission April 11, 2011 Budapest Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia Agenda: Project Overview System Components Tracking & Tracing Voice VHF Communication System ERI Data Gateway Notices to Skippers Communication Infrastructure AIS and VHF Network Layout & Design Construction Works What next ? - Phase II and III Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Project overview - General Project duration 18 Months Start: May 2010 End: November 2011 Contracting Authority: Bulgarian Ports Infrastructure Co. Budget 5.6 Mil € Project is co-funded by EFRD - Operational Program on Transport 2007 – 2013 Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Project Overview - Project Goals To establish the required base infrastructure for RIS operation on the Bulgarian part of Danube Communication infrastructure Tracking and tracing (AIS) infrastructure Voice VHF Communication System ERI Data Gateway Notices to Skippers To apply DIRECTIVE 2005/44/EC of the European Parliament and of the Council Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Project Overview – Implementation Schedule Task 1: Inception report and planing (completed) Task 2: System design (completed) Task 3: Construction (in progress) Task 3: Software development (completed) Task 4: System installation (in progress) Task 5: System integration (Q2-Q3’2011) Task 6: Testing and training (Q3-Q4’2011) Task 7: Migration to real life operation (Q4’2011) Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - Tracking and Tracing AIS based system 8 sites Exchange of actual, safety related information between ships and shore Client – Server architecture Web interface Functions: Provision of a TTI/STI Provision of traffic management or fairway information services Web access for logistic users Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - Tracking and Tracing Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Tracking and Tracing - Additional AIS functions dGPS trough AIS network Improves the accuracy of the vessel positioning Functions: Correction of GPS positioning Compliant with international recommendations Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System components - Voice VHF Communication Network 8 sites along Bulgarian Danube Cohabitation with AIS base stations Independant system Integration and data exchange with AIS Graphic presentation of the vessels position Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - ERI Allows simplification of cross border procedures Functions: Data exchange between vessel and competent authorities Available via web application Access according to the user rights Users: Vessel parties Competent authorities Compliant with European and international standards Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - ERI Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Data Gateway National and international exchange of RIS data Functions: Provision of relevant RIS data Interface to T&T, ERI and Hull system Web based users interface Users: Governmental users Commercial users Different data access rights have to be defined Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Data Gateway Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Notices to Skippers Used for fairway information, traffic information and management as well as voyage planning Functions: Available via web service Automatic translation on 23 languages Input information for voyage planning Users: Traffic/Fairway authorities Harbour Master’s Offices/Port authority Police Shippers Skippers/Captains Inspection and customs authorities Compliant with European standards Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Notices to Skippers Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Communication Network Total of 16 sites 14 radio reley links 1 dedicated optical link 1 MAN link Interlinked togeather to form a closed network Network is invisble to outside world Hack proof Used for AIS and VHF communication Real time data replication between Ruse and Varna backup centre Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Communication Network Implementation of River Information System on the Bulgarian Part of Danube - BulRIS AIS and VHF Network - Locations Implementation of River Information System on the Bulgarian Part of Danube - BulRIS AIS and VHF Network – Radio Coverage (c) Kongsberg Seatex AS Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI of the Client Application 1/2 (c) Periskal Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI of the Client Application 2/2 Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI AIS WEB Application 1/2 (c) Periskal Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI AIS WEB Application 2/2 (c) Periskal Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Construction Works Scope of works Design Evaluation of radiation influence Obtainig building permits Site construction Exploatation permits 4 new sites Other sites are existing sites owned by Bulgarian telecom Implementation of River Information System on the Bulgarian Part of Danube - BulRIS What next? – Phase II and III Construction of the RIS Center building Conceptual design finalized Technical project – start in May 2011 Construction works – start in fall 2011 In operation – end of 2012 Upgrade and development of the services (pre-project study) Automatic water level measurement/modeling RIS portal WLAN access to RIS services Calamity abatement services ……………………………………… THANK YOU FOR YOUR KIND ATTENTION Kuzman Genov k.genov@bgports.bg