REGIONAL COMPETITIVENESS OPERATIONAL PROGRAMME 10TH SECTORAL MONITORING COMMITTEE MEETING 27 June 2012 – Ankara Agenda For the 10th Sectoral Monitoring Committee Meeting For the Regional Competitiveness Operational Programme in Turkey (27 June 2012, 13:30) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Opening statements – by the Head of the Operating Structure, and by the Commission (HoS + EC) Approval of the Minutes of the last meeting and the agenda of the Meeting (HoS + EC) Information on the Annual Audit Activity Report for the RCOP (Audit Authority) Information on programming (OS) - 1st project package - 2nd project package - 3rd project package (OS+EIF) - 4th project package Information on implementation (OS) - Tendering and contracting - Implementation -Absorption (n+3), procurement plans and disbursement forecasts -Updated payment forecast and payment cycle for 2012 (OS+NAO) Information on technical assistance and communication activities (OS) Monitoring activities (OS) -Discussion and Endorsement of 2011 Sectoral Annual Implementation Report -Information on Monitoring Report and Monitoring Sheets Information on Accreditation of Finance and Contracts Unit in RCP CID and follow-up of conferral of management audit findings of the DG REGIO (OS+EC) Information on the revision and extension of the Operational Program for years 2012/2013 (OS +EC+ Strategic Coordinator) Indicative date for the next Sectoral Monitoring Committee (HoS + EC) AOB PROGRAMMING - 1st project package 2nd project package 3rd project package 4th project package STATE OF PLAY OF THE 1st PACKAGE of PROJECTS UNDER THE RCOP 1st Package of Project Establishment of 3 Business Incubators in Selected Regions and Development of a Network among Incubators in Turkey, KOSGEB Establishment of Innovation Centre for FoodINNOFOOD CENTER, TUBITAK Establishment of 3 Technology Development Zones, MoSIT-DG for Science and Technology Winter Tourism Corridor in Erzurum, Erzincan and Kars, Ministry of Culture and Tourism Enlargement of the European Turkish Business Centres Network to Sivas, Antakya, Batman and Van, TOBB Empowering SMEs for networking and inter-regional cooperation, Ministry of Economy Technical Assistance + Publicity, MoSIT – RCP-CID TOTAL BUDGET: 98.100.205 € 1st Package of Project TUBITAK, The Scientific and Technological Research Council of Turkey INNOFOOD MAJOR PROJECT First Submission of the Documents – 26.02.2010 Admissibility Letter – 23.04.2010 Comments from the EC – 11.10.2010 Second Submission of the Documents – 29.07.2011 Comments from the EC – 22.03.2012 Third Submission of the Documents – July 2012 STATE OF PLAY IN SECOND PROJECT PACKAGE SECOND PROJECT PACKAGE - STATE OF PLAY Name of Proposal 1- Business Development Center 2- Big partnership of small enterprises 3- Hazelnut Licensed Warehouse and Spot Exchange 4- Strengthening the Infrastructure for Furniture Production 5- Tea Research and Application Centre 6- My Bee, My Honey, My Honeycomb Location Submission Date Approval Date 26 . 10. 2010 23.11.2010 08.02.2011 03.03.2011 Van Tokat Giresun Kayseri Rize Ordu 7- Sustainable Tourism Development Mardin 8- Establishment of Cereals Exchange and Licensed Warehouse 9-Hand-“Made in Hatay” 10-Establishment of a “CuF” for Industrial Forestry Products 11- Impr. of the Shared Industrial Infr. of the Pistachio Pros.Sector 12- Increasing Competitiveness of Middle Black Sea Region (TR83) 13- Establishment of a CuF for Furniture and Mechanics Ş.Urfa 04.05.2011 Hatay Kastamonu 13.06.2011 18.04.2011 Siirt 01.03.2011 18.06.2011 Samsun 03.11.2011 Amasya 03.11.2011 SECOND PROJECT PACKAGE - STATE OF PLAY Submission Name of Proposal Location Date Approval Date 14- Regional Industrial Collaboration in Cotton Fibre Manufacturing Laboratory Diyarbakır 13.05.2011 18.07.2011 15- Samsun Metals Metrology and Calibration Laboratory Samsun 08.06.2011 03.11.2011 16- Natural Stone Manufacturing Marketing Support Centre Bayburt 20.04.2011 04.11.2011 17- Regional Industrial Design and Modeling Centre Gaziantep 13.05.2011 17.01.2012 18- Osmaniye Enterprise Development Center (İŞGEM) Osmaniye 05.01.2012 23.03.2012by e-mail K.Maraş 24.04.2012 14.05.2012by e-mail 20- Activation of “Specialty Foods Cluster” in “GAP Region” Ş.Urfa-İzmir 19.01.2012 15.06.2012by e-mail 21- Sorgun Enterprise Development Center (İŞGEM) Sorgun/ Yozgat 18.05.2012 22.06.2012by e-mail 22- Yeniçam Shipyard CuF Trabzon 04.05.2012 21.06.2012by e-mail and 19- Maraş Pepper Cluster Budget Total : 163.600.231 € SECOND PROJECT PACKAGE – PLANNING Submission Date Status 26.11.2011 Waiting ERA’s response Amasya 18.05.2012 Waiting ERA’s response 25- Enterprise Development Center Elazığ 28.05.2012 Waiting EC’s comments 26- Whey Powder Production Facility Trabzon 02.05.2012 Waiting EC’s comments Name of Proposal 23- Karatekin University – SETEM 24- Marble Production Common Use Facility Location Çankırı Indicative Budget : ~ 34.837.566 € SECOND PROJECT PACKAGE – PLANNING Name of Proposal 27- Aydınlar Tourism Promotion Project 28- FIKAP 29- Investment Promotion Center 30- Atatürk University – Technology Oriented Supp. Cen. 31- Apricot Valley and Green Energy Storage Facility 32- Winter Tourism Center 33- Enterprise Development Center 34- Milk Processing CuF 35- Olive oil CuF 36- Mount Pamuk Highland Tourism 37- Kommagene – Nemrut Tourism Development 38- İshakpaşa Palace Tourism Promotion Project 39- Enterpreneurship Consultancy Center 40-Increasing the Regional Competitiveness in Kars, Ağrı, Ardahan and Iğdır 41- Bafra Business Dev. Cent. Location Estimated Submission Date Siirt Giresun Yozgat Erzurum Malatya Ardahan K.Maraş Kars G.Antep Iğdır Adıyaman Ağrı Bitlis Kars, Ağrı, Ardahan, Iğdır Samsun-Bafra Indicative Budget : ~ 47.965.288 € 3rd Quarter of 2012 STATE OF PLAY IN THIRD PROJECT PACKAGE THIRD PROJECT PACKAGE - STATE OF PLAY Greater Anatolia Guarantee Facility GAGF G-43 Anatolian Venture Capital Fund New project proposals • • • • • • 32 M.€ IPA Contribution 500 m.€ Credit Volume for SMEs Under implementation EIF provided info. first results 4 Steering Com. held. Need Assess. For KGF carried out •16.3 Mil. € Budget •Contribution Agreement - 31.08.2011 •Official launch of the project – 19.01.2012 •Publication of Call for Expression of Interest for fund managers - 20.01.2012 •7 eligible applications by deadline -20.03.2012 •Evaluation of proposals – on-going •Selection of a fund manager – expected in July •Commitment to G43 VC – expected by the year-end • Establishment of Technology & Innovation oriented fund, • Extension of GAGF Results as of May 2012 • Total Volume: ~ EUR 310 million • Total Number of Loans: >3,500 • Total Number of SMEs: >3,500 Results vs Objectives • Portfolio of EUR 310m • 62% of the target EUR 500m • Number of SMEs reached surpassed the target of 2,500 by 50% Regional Breakdown of Loans* * As of end of 2011 PROGRESS IN 1ST 2ND AND 3RD PACKAGE 45 40 35 54 30 25 20 34 15 18 10 2 5 0 Operations submitted Operations approved Operations Operations under under approval stage improvement PROGRESS BY PRIORITY AXES IN 1ST 2ND AND 3RD PACKAGE Priority 1: Improvement of Business Environment (349.794.316 €) 45 40 35 42 30 25 27 20 15 10 2 5 13 0 Operations submitted Operations approved Operations Operations under approval under stage improvement PROGRESS BY PRIORITY AXES IN 1ST 2ND AND 3RD PACKAGE Priority 2: Strengthening of Enterprise Capacity and Foster Entrepreneurship (32.846.459€) STATE OF PLAY IN THE FOURTH PROJECT PACKAGE OVERVIEW of FOURTH PROJECT PACKAGE CRITERIA APPLIED FOR IDENTIFICATION OF PROJECT Alignment with objectives of the RCOP Potential regional impact of the project idea on competitiveness Originality of the project idea Maturity of the idea Province not previously covered by 1st and 2nd package projects New project idea; ie not overlapping in concept or region with 1st or second package Received Project Ideas : 107 Long Listed Project Ideas: 23 Shortlisted Projects: 12 (including 1 major project) PRIORITIZED LIST OF PROJECTS IN 4TH PACKAGE (IND. 90.000.000 € ) # Project Title Place of Implementation Applicant Measure Budgets 1.1 8.500.000 1.1 7.147.000 1.1 25.000.000 2.2 4.500.000 1 Processing and Storing of Sea Food Sinop 2 Şanlıurfa Cotton Licensed Warehouse Project Şanlıurfa 3 Samsun Logistics Center Samsun 4 Turkish Cluster Academy N/A 5 The Common Use Workshop Project Bitlis, Hakkâri, Muş, Van DAKA 1.1 4.668.645 Hatay DOĞAKA 1.3 5.471.000 Gümüşhane DOKA 1.1 6.000.000 6 7 Shoe-making Training and Design Centre and Shared-use Workshop Establishment of a Business Development Center in Gümüşhane KUZKA TOBB TOBB BSTB-OSBGM 8 Establishment of Business Incubator (İŞGEM) in Bingöl Bingöl FKA 1.1 2.158.044 9 Carpet Incubator Centre Gaziantep İKA 1.3 5.000.000 Establishment of Nanotechnology and Nonwoven R&D Centre Gaziantep İKA 1.3 5.000.000 Sivas ORAN 1.1 6.137.800 Kars SERKA 1.4 9.500.000 10 Sivas Industry Incubator Center Project (ISGEM) “Kars City with its historical identity” 12 project 11 TIMELINE FOR the 4TH PACKAGE May 12 Weeks E-mail to the ERAs 1 Receiving First Draft of OIS 2 3 Establishment of Technical Assistance Team (TAT) Kick-off Technical Meetings with ERAs with the Participation of TAT 4 Site Visits 5 Finalization of OISs 6 1 2 3 4 June 12 5 1 2 3 July 12 4 1 2 3 August 12 4 1 2 3 4 September 12 5 1 2 3 4 IMPLEMENTATION - Tendering and contracting - Implementation - Absorption (n+3), procurement plans and disbursement forecasts - Updated payment forecast and payment cycle for 2012 Tendering and Contracting Realised and Foreseen Number of Signed Contracts, component based Realised and Foreseen Contracted Budget *Until the end of 2014 foreseen budget that will contracted is 246m € Finalized Contracts Totally 7 contracts Technical Supervision assistance / FW Type of Contracts Works Number of Contracts 0 0 Budget (euros) 0 0 Supply Total (euros) 2 5 7 187.968 865.470 1.053.438 Contracts under Implementation Totally 15 contracts Type of Contracts Works Supervision Technical assistance Supply DirectGrant Total (euros) Number of Contracts 6 4 3 0 2 15 Budget (euros) 18.162.683 1.947.225 15.989.195 0 48.300.000 84.399.103 Projects coming to Implementation Totally 28 projects / 83 components Type of Components Works Supervision Technical assistance Supply Budget (euros) 2012 0 0 3 0 4.432.036 1st Q / 2013 2 3 3 2 26.822.545 2nd Q / 2013 12 15 5 3 50.592.372 3rd Q / 2013 4 0 2 7 36.717.659 0 0 4 3 14.020.403 0 0 6 9 27.975.263 18 18 23 24 61.178.075 7.405.160 4th Q / 2013 2014 Total no of components Budget (euros) 41.597.087 50.379.956 160.560.278 DISBURSEMENT FORECAST AND N+3 GAP FOR RCOP 2007-2011 PROGRAMMING PERIOD Disbursement Forecast (EU Contribution) - June * 2010 2011 27,200,000 13,855,000 2012 6,718,252 2013 51,982,388 2014 67,065,309 2015 11,153,999 2016 2,676,148 0 0 27,200,000 13,855,000 0 0 0 0 2,644,052 0 4,074,200 0 27,477,556 0 18,207,035 6,297,797 46,988,479 0 13,024,924 7,051,906 7,834,146 0 1,726,136 1,593,717 1,828,646 0 700,520 146,982 0 1,219,338 2,366,813 5,079,181 5,592,532 473,317 96,465 0 0 380,537 838,801 1,147,500 1,219,313 2,837,093 2,242,088 1,792,228 3,800,304 0 473,317 0 96,465 6,157,358 8,670,288 PRIORITY III 59,577 1,636,302 1,522,757 3,781,209 1,579,535 428,400 0 9,007,780 Measure3.1. Measure 3.2. TOTAL (per year) 59,577 1,636,302 0 0 1,165,757 357,000 3,281,409 499,800 1,079,735 499,800 0 428,400 0 0 7,222,780 1,785,000 27,259,577 16,710,640 10,607,822 60,842,778 74,237,376 12,055,716 2,772,613 204,486,522 27,259,577 43,970,217 54,578,039 115,420,817 PRIORITY I Measure 1.1. Measure 1.2. Measure 1.3. Measure 1.4. PRIORITY II Measure 2.1. Measure 2.2. TOTAL (cumulative) 2007 2008 2009 Allocated fund for RCOP 41,900,000 43,500,000 54,800,000 71,430,000 88,020,000 N+3 Expenditure Requirements (per year) 41,900,000 43,500,000 Pre-finance* 42,060,000 22,215,000 Expenditure paid and declared cumulative* N+3 Gap (differences in line 18-22) 189,658,193 201,713,909 2017 0 TOTAL 180,651,096 86,772,879 41,055,000 37,732,815 15,090,402 0 204,486,522 204,486,522 14,827,646 204,486,522 299,650,000 54,800,000 71,430,000 88,020,000 299,650,000 64,275,000 -160,000 21,125,000 75,925,000 147,355,000 235,375,000 235,375,000 235,375,000 299,650,000 299,650,000 27,419,577 22,845,217 -21,346,961 -31,934,183 -45,716,807 -33,661,091 -30,888,478 -95,163,478 -95,163,478 DISBURSEMENT FORECAST AND N+3 GAP FOR RCOP 2007-2013 PROGRAMMING PERIOD Disbursement Forecast (EU Contribution) -June 2007 PRIORITY I Measure 1.1. Measure 1.2. Measure 1.3. Measure 1.4. PRIORITY II 2008 2009 2010 2011 27,200,000 13,855,000 2012 6,718,252 2013 51,982,388 2014 67,065,309 2015 11,153,999 2016 2,676,148 0 0 27,200,000 13,855,000 0 0 0 0 2,644,052 0 4,074,200 0 27,477,556 0 18,207,035 6,297,797 46,988,479 0 13,024,924 7,051,906 7,834,146 0 1,726,136 1,593,717 1,828,646 0 700,520 146,982 2017 0 TOTAL 180,651,096 86,772,879 41,055,000 37,732,815 15,090,402 0 1,219,338 2,366,813 5,079,181 5,592,532 473,317 96,465 0 0 380,537 838,801 1,147,500 1,219,313 2,837,093 2,242,088 1,792,228 3,800,304 0 473,317 0 96,465 6,157,358 8,670,288 PRIORITY III 59,577 1,636,302 1,522,757 3,781,209 1,579,535 428,400 0 9,007,780 Measure3.1. Measure 3.2. OHTER (non approved project) 1st PP 59,577 0 1,636,302 0 1,165,757 357,000 3,281,409 499,800 1,079,735 499,800 0 428,400 0 0 7,222,780 1,785,000 0 0 17,000,000 0 30,000,000 70,000,000 55,404,165 172,404,165 0 0 0 0 10,000,000 10,000,000 5,404,165 25,404,165 0 0 0 0 20,000,000 60,000,000 50,000,000 130,000,000 Measure 2.1. Measure 2.2. 2nd PP 3rd PP TOTAL (per year) 17,000,000 27,607,822 60,842,778 104,237,376 82,055,716 27,259,577 43,970,217 71,578,039 132,420,817 236,658,193 318,713,909 Allocated fund for RCOP 41,900,000 43,500,000 54,800,000 71,430,000 88,020,000 89,016,597 91,720,588 N+3 Expenditure Requirements (per year) 41,900,000 43,500,000 54,800,000 71,430,000 Pre-finance* 42,060,000 22,215,000 Expenditure paid and declared cumulative N+3 Gap (differences in line 18-22) -160,000 21,125,000 27,419,577 22,845,217 14,827,646 17,000,000 27,259,577 16,710,640 TOTAL (cumulative) 0 58,176,778 376,890,687 376,890,687 376,890,687 376,890,687 480,387,185 88,020,000 89,016,597 91,720,588 0 480,387,185 64,275,000 75,925,000 -4,346,961 147,355,000 -14,934,183 235,375,000 324,391,597 416,112,185 480,387,185 480,387,185 1,283,193 -5,677,688 -39,221,498 -103,496,498 -103,496,498 MONTHLY EXPENDITURE FORECAST FOR 2012 EU Contr. January February March April May June July August September October November December TOTAL 0 0 0 51,311 981,840 1,297,328 822,723 595,000 17,947,566 2,385,050 1,884,076 1,642,928 27,607,822 TR Contr. 0 0 0 10,674 177,640 271,153 157,596 105,000 3,167,218 468,251 377,071 337,484 5,072,087 TOTAL 0 0 0 61,985 1,159,480 1,568,481 980,319 700,000 21,114,784 2,853,301 2,261,147 1,980,412 32,679,909 TECHNICAL ASSISTANCE ACTIVITIES - Technical Assistance Plan (2012 – 2017) - Technical Assistance on Institutional Building for the Implementation of RCOP Technical Assistance Plan (TAP) 2012-2017 Preparation of TAP was started in December 2011. Taking into account comprehensive needs identification carried out in the RCP-CID, where all the departments identified their needs for TA Taking into account training need analysis of ERA Approved by the Commision in 10 May 2012. CONTRACTS UNDER 2012 - 2017 TECHNICAL ASSISTANCE PLAN No MEASURE Expected TYPE OF Expected completion CONTRACT starting date date CONTRACTS INDICATIVE BUDGET(Euro) Total Ind. Budget EU NATIONAL 1 3.1. TA to RCP-CID (Technical Assistance and Capacity Building for Further Strengthening of RCP CID in its Operations) 2 3.1. TA to RCP-CID II Service Q4 2015 Q2 2017 1.100.000 935.000 165.000 3 3.1. Project Preparation Facility Service Q1 2014 Q4 2016 3.200.000 2.720.000 480.000 4 3.1. TA for MIS Service Q2 2015 Q2 2017 900.000 765.000 135.000 5 3.1. MIS Supply Project Supply Q1 2016 Q2 2016 6 3.1. Supply Q3 2013 Q4 2013 250.000 7 3.1. Service Q3 2012 Q4 2013 1.195.438 8 3.2. Service Q3 2015 Q1 2017 1.832.353 1.557.500 274.853 12.527.791 10.648.622 1.879.169 Supply of Equipment for RCP-CID TA to RCP-CID (FWC, Direct Financing of expenditures, etc.) TA for Publicity and Visibility Service Q2 2013 Q4 2015 3.800.000 3.230.000 570.000 TOTAL 250.000 212.500 37.500 212.500 37.500 1.016.122 179.316 Technical Assistance on Institutional Building for the Implementation of RCOP Main activities January - June 2012 Support to the hand-over process from CFCU to RCP-CID after succesfull Accreditation Process (February 2012) Support to preperation of TA Plan (2012-2017) Support to pipeline development (4th Package) Preparation of Tender Dossiers Training and capacity building Study tours to Poland and Spain Training and capacity building Capacity building to RCP-CID: Quality Assurance and Risk management training for new staff Project Development Training course (16-18 January 2012) Project Pipeline Management (20-25 February 2012) Publicity and Visibility (13 April 2012) FIDIC Training workshop (29-30 March 2012) Training of trainers (13-14 June, 20-21 June 2012) Internal workshops on budgeting, contracting, payment procedures and financial reporting Training and capacity building Capacity building to end-recipients: − Guidelines for ERAS (End-Recipients) designed and under revision − First training for national ERAs (first package) delivered: 28 May to 01 June 2012 Study tour to Poland and Spain Study Tour for FCD to Poland prepared and delivered 14 – 18 May 2012 Study Tour for Programming Department to Spain prepared and delivered 21 – 25 May 2012 Main activities planned for July to December 2012 Revision of RCP-CID manual, systems and tools Support to preparation of Technical Documents within the new TA Plan (2012-2017) Preparation of Tender Dossiers Organization of one Study tour and internships Support to pipeline development to Programming Department Support to FCD Training and capacity building for RCP-CID staff and ERAs FOLLOW-UP OF CONFERRAL OF MANAGEMENT AUDIT FINDINGS OF THE DG REGIO Conferral of Management Audit Findings of the DG REGIO AREA: Formal establishment of accountability, responsibility, delegated responsibility and any necessary related authority for all tasks and positions throughout the organisation. SUMMARY FINDING A smooth hand-over of all tendering and contracting files should be safeguarded between the Ministry of Science, Industry and Technology and Central Finance and Contracts Unit upon the conferral of the tendering, contracting and financial management functions. According to the first addendum (December 2010) of the initial Cooperation Agreement, there were specific provisions arranging in detail the handover of the public procurement documents according to the status of the tenders/contracts managed by CFCU. However, in a second addendum (May 2011), it is stated that following the accreditation and conferral of management powers, all the contractual responsibilities should be undertaken by the Ministry of Science, Industry and Technology. This uncertainty put into question the effective functioning of the management and control system concerning tendering, contracting and financial management. RECOMMENDATION /FOLLOW UP ACTIONS Specific provisions arranging in detail the transition of the tendering, contracting and financial management files should be laid down in an agreement between the two institutions. CURRENT STATUS Regarding the transfer of tendering and contracting files, a meeting was held on 8th of March 2012 between CFCU and MoSIT. It is concluded in the meeting that all tender or contract files at different phases will be transferred to the MoSIT. It has been agreed on that files at the tendering phase will be transferred to the MoSIT at the end of the relevant stage (shortlisting, evaluation, contracting or signature), and files at implementation phase will be directly transferred to the MoSIT after realization of payment requests if any made at the end of the meeting. Before transfer of files, CFCU will send an addendum to EUD for tenders under evaluation or contracts under implementation. To conclude, the procedure agreed by the both sides regarding transition of the tendering, contracting and financial management files sent by the CFCU with an official letter with the date of 12th of March 2012. In addition, to maintain smooth transition, close cooperation was achieved and workshops were carried out with CFCU and EUD during the transition period which enabled the experience sharing and know-how transfer between institutions. Conferral of Management Audit Findings of the DG REGIO AREA: Internal audit including handling of audit reports and recommendations SUMMARY FINDING The set up and functioning of the internal audit function in the Ministry of Science, Industry and Technology has weakened since the initial conferral of management decision and is considered as an important weakness in the current management and control system. No IPA related, internal audit activity was carried out, nor planned, in 2011. The requirement of Commission Regulation (EC) No 718/2007 Article 28(2)(k): The operating structure shall be responsible for managing and implementing the programme or programmes concerned in accordance with the principle of sound financial management. For those purposes, it shall carry out a number of functions that include: ensuring internal audit of its different constituting bodies; in the current situation it is not fulfilled. RECOMMENDATION /FOLLOW UP ACTIONS Recruitment and retainment of qualified internal auditors should be given the highest priority. Internal audit training programmes, in accordance with international internal audit standards should be implemented and further intensified. IPA related internal audit work should be regularly performed. Relevant follow-up information should be provided to the Commission concerning - recruitment - training - audit work carried out. A detailed audit plan for 2012 including the follow-up of previous internal audit findings should be submitted to the Commission. CURRENT STATUS It will be subject to recruit at least 2 internal auditors until the end of 2012. In addition 1 of Internal Auditors of the Ministry has been nominated for the purpose of dealing with the operations of the RCP-CID. Training strategy document for EU funded projects will be prepared and submitted to the RCP-CID to ensure that the trainings proposed within the scope of this strategy would be provided with sources of the TA Project. “The Tendering Documents Preparation Activities” of the Regional Competitiveness Operational Program and Implementation Department was audited in terms of system and compliance between 17/08/2011-08/02/2012. The 2012 Internal Audit Program was sent to the Commission. It is planned in the 2012 Internal Audit Plan to carry out an audit on “Reporting Irregularities” and to implement follow up. Conferral of Management Audit Findings of the DG REGIO AREA: Security procedures (IT) and Evaluation SUMMARY FINDING At Strategic Coordinator level the horizontal Integrated Management Information System (IMIS) is still not functioning and the Commission has been made aware of technical problems. In parallel, the Ministry of Science, Industry and Technology plans to develop an individual Management Information System addressing specific implementation and financial reporting needs at a measure, project and contract level. The integration between the IMIS, the MIS and the accounting system should be given a priority and proper procedures should be added in the manual of procedures. The finalisation of the MIS is foreseen for the end of 2013, in the meantime an alternative information system will be used. The requirement of Commission Regulation (EC) No 718/2007 Article 28(2)(i): The operating structure shall be responsible for managing and implementing the programme or programmes concerned in accordance with the principle of sound financial management. For those purposes, it shall carry out a number of functions that include: setting up, maintaining and updating the reporting and information system; in the current situation only partly fulfilled. RECOMMENDATION /FOLLOW UP ACTIONS The technical problems with the IMIS system should be solved with the highest priority. Possible interfaces should be developed between the different systems in order to prevent double entry of data and similar entry mistakes. Priority should be given to the finalisation of the MIS. Relevant follow-up information should be provided to the Commission concerning - The functioning of the IMIS System - the planning and progress concerning the interfaces - progress of the MIS - Training provided. CURRENT STATUS The integrated structure between the different IT systems will be ensured by the Management Information System which is at the PN publishing phase at the moment. The ToR of MIS is prepared by taking into consideration of that integration matters. Estimated date of contract Signature for MIS: 2nd quarter of 2013. On the other side, the user trainings for MIS will be given after the completion of the system. Furthermore, System Admin Trainings will be given to RCP-CID staff in order to ensure sustainability Till MIS will be fully operational; interim IT solutions (the File server for archiving and hierarchical electronical document sharing, the excel worksheets developed by each department according to their own needs ) and other systems (IMIS, PRESTO) will be on use. Moreover, training programme for PRESTO was organized for the relevant staff in the third quarter of 2011. Conferral of Management Audit Findings of the DG REGIO AREA: Security procedures (IT) and Evaluation (Continued) SUMMARY FINDING RECOMMENDATION /FOLLOW UP ACTIONS CURRENT STATUS The technical problems with the IMIS system should be solved with the highest priority. Possible interfaces should be developed between the different systems in order to prevent double entry of data and similar entry mistakes. Priority should be given to the finalisation of the MIS. Relevant follow-up information should be provided to the Commission concerning Within this scope, training programmes were organized regarding IMIS for the staff of Operating Structures and their end recipients in 2010. - The functioning of the IMIS System IMIS has become operational as of September 2010 and was accessible at the web page of the Ministry. - the planning and progress concerning the interfaces 2nd half of 2011- January 2012: Period of Technical problems and efforts for solutions. - progress of the MIS Remindful training was delivered on 13th of January 2012 by RCP-CID to the first and third project package end recipients. - Training provided. Training of trainers programme was organized by the Ministry of Development (MoD) for the staff of the Operating Structures in 1-5 March 2010. Training programme was organised for the first and third project package end recipients of the RCOP and staff of RCP-CID between 29th of April and 2nd of May 2010. In this context, IMIS opened to active usage of the first and third project package end recipients on 16th of January 2012. In the forthcoming period, it is planned to organise trainings and open the system to the end recipients of second project package. THANK YOU FOR YOUR ATTENTION Ministry of Science, Industry and Technology Regional Competitiveness Programme Coordination and Implementation Directorate e-mail: ipa@sanayi.gov.tr Web adress: ipa.sanayi.gov.tr