PREPAYMENT METERING IN RURAL UAE AREAS

advertisement
PREPAYMENT METERING
IN RURAL UAE AREAS
Prof. Dr. E. El-Shirbeeny
Electric Power Research Laboratory
Abu Dhabi Water & Electricity Authority
ADWEA
1
IN THIS PAPER
•
•
•
•
•
National Overview
Drivers
Technology & Barriers
Pilot Scheme
Future Developments
2
Abu Dhabi
Emirate
?
3
DISTRIBUTION REGIONS IN ABU DHABI
4
ADWEA
GENERATION
TRANSMISSION
DISTRIBUTION
TAW
ADDC
UmNar
TRANSCO
AADC
Bainounah
MRF
ADWEC
5
ADWEA SYSTEM
One Million Customers
67,340 Km2 Area
12% An. L. G. Rate
6
LOCAL CONDITIONS
Maximum ambient temperature: 50 degC
Humidity could reach 100%
LV AC operating voltage 415 V
Farms are scattered on wide desert areas
Difficult transport and access
High callout costs
7
TYPICAL RURAL LOADS
F AR M S
w ith
wa te r n e two rk
wa te r we lls
g re e n h o u se s
7 kW
0 .9 0 p f
6 0 kW
0 .8 5 p f
3 2 0 kW
0 .7 9 p f
8
9
METER FOR SMALL FARM
10
METER IN FARM WORKER HOUSE
11
METER FOR WATER PUMP LOADS
12
METER FOR FARM WITH WATER NET
13
METER WITH CT’s At GREENHOUSE FARM
Metering Current Transformer box
Meter and supply panels
14
REVENUE MANAGEMENT
PROBLEMS
•
•
•
•
•
•
•
Delays in payment due to customer apathy
Social values and difficulty in disconnecting
High rate of debt accumulation
Use of old inaccurate meters
Difficult meter reading
Illegal reconnections
Unmetered supply
15
WHY PREPAY METERS
•
•
•
•
•
•
•
Cut down bad debts
Protect revenue
Reduce operating costs
Simplify sales operations
Higher metering accuracy
Encourage energy saving
Enhance customer services
16
AVAILABLE TECHNOLOGIES
 Coin operated
 Token
 Key
 Smart card
 Keypad
ONLINE
17
SUPPORTING SYSTEMS
•
•
•
•
•
Vending/Payment Terminals
Billing System
Databases
Operating Platforms
Communication Networks
18
SELECTION CRITERIA
•
•
•
•
•
•
•
•
•
Minimum customer interaction
Simplicity and ease of installation
Maximum utilization of available facilities
Efficiency
Reliability
Minimum maintenance
Scalability
Security
Cost
19
SECURITY MEASURES
1. No access for Unauthorized party
2. Alternative means in case of system failure
3. Concurrent operation with a redundant system
20
CHALLENGES
1.
2.
3.
4.
5.
6.
7.
8.
9.
Prepayment is not “off-the-shelf” technology
Prepayment = shift in mind of service provider
Community acceptance
Modification cost of metering & billing system
Need of strong technical support and training
Reliable communications and IT systems
Harsh local operating environment
Higher farm loads
Extra protection
21
PILOT SYSTEM <online payment>
Payment
Terminal
Payment
Terminal
Customer
DB
Control
Center
Billing
System
Data
Concentrator
Data
Concentrator
Local
Transreceiver
Disconnect Meter
Customer
Local
Transreceiver
Load
Disconnect
Meter
Load
22
ADVANTAGES OF SELECTED SCHEME
•
•
•
•
•
•
•
•
•
Simpler software and hardware
Real-time integration with billing system
Centralized database and security modules
More vending points at a lower cost of ownership
Easier system management
More efficient arrears collection
Increased database and encryption security
Easier data management and scalability
Very quick setup of online vendor at lower cost
23
FUURE DEVELOPMENT
1. Extension to water & gas services
Electricity
Meter
Electricity
Meter
Gas
Meter
Radio
Transmitter
Data
Concentrator
Electricity
Meter
Electricity
Meter
Data
Collector
Radio
Receiver
PLC
Modem
Water
Meter
11/0.415 kV
Distribution SS
24
FUTURE DEVELOPMENT
2. Applying online prepayment scheme to:
– large commercial customers
– Governmental buildings
3. Upgrading to AMR
4. Integration in distribution management
25
THANK YOU