Interoperability of Meter Data Collection and Management Systems John Trudell and Tonnie Drummond US Army Corps of Engineers Engineering and Support Center - Huntsville 16 Aug 2012 US Army Corps of Engineers BUILDING STRONG® Advanced Meter Requirement Advanced metering mandated by Energy Policy Act of 2005 (EPAct 2005), the Energy Independence and Security Act of 2007 (EISA 2007), policies, and directives. Deadlines to install advanced meters Electric by 30 Sep 2012 (EPAct 2005) Gas and Steam by 30 Sep 2016 (EISA 2007) Meter buildings with est. $35K/yr utility cost and/or 29,000 sq ft, and reimbursable tenant facilities. 2 BUILDING STRONG® End State Establish the energy information infrastructure (installation energy footprint) that will enable/provide: • Management of smart buildings • Energy Managers who are energy smart and more effective to meet energy reduction goals. • Building occupants are energy aware and actively participate in energy reduction actions. • Reduce energy waste • Continuous improvements in energy efficiencies • Meet the requirements of NetZero by 2030. 3 BUILDING STRONG® Define the scope of the action • What data do we need to collect and analyze? • What is the data flow architecture? • What hardware and software is needed to collect and transfer data? • What hardware and software is currently installed and needs to be integrated into the system? • How will the system security (Information Assurance) be tested, implemented, and maintained? • Who will sustain/maintain the systems? 4 BUILDING STRONG® Enterprise Meter Data Flow Meter Data Management Installation Meter data collection 4) Analyze meter data 2) Collect raw meter data Gateway server Front End Server Electric meter 1) Gas pulse counts Security Accreditation Boundary Gas Meter 5) Report Generation Energy manager views data via a web portal Water Meter 5 BUILDING STRONG® Three Challenges 1) Communication – Army-wide End State Data Flow Architecture 2) Communication – System Documentation DIACAP - System Hardware/Software Life Cycle Management 3) Communication – Meter System Install Coordination Meter Install Team (Government and Contractor) Installation – Building power outage IA/IT Community 6 BUILDING STRONG® Contact information John Trudell Program Manager – MDMS (256) 895-1322 (w) (256) 690-7196 (c) john.a.trudelliii@usace.army.mil Tonnie Drummond IA/IT Specialist IAM EEDRS (256) 895-1730 (w) (256) 690-1538 (c) tonnie.f.drummond@usace.army.mil US Army Corps of Engineers Engineering and Support Center 4820 University Square Huntsville, AL 35816-1822 7 BUILDING STRONG®