HP BladeSystem – “the virtualisation platform” Peter Mansell BladeSystem Business Manager Technology for better business outcomes © 2007 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Customers budgets down but we need to sell more… 10-20% acquisition Blades – can reduce energy costs by 69% 80-90% services, operations, people and training expenses Deploying HP management tools can reduce downtime by 77%, deployment time by 65% Standard management platform Source: Giga Information Group, IdeaByte RIB-032001-00062 Creating a savings report • Create your own blade savings report www.hp.com/go/bladesystem • Public sector organisation, Urban. • • 48 x DL360 quad core VS. 48 x BL460C quad core with virtual connect You save = £446,307 or 57.2% over 5 years What’s new with HP BladeSystem Transforming Server Economics Introducing HP ProLiant: The Next Generation ProLiant G6 Servers Spend less for power Maximize virtualization potential Make every dollar count Design Focal Points: Power efficiency Infrastructure management Performance (including Intel® Xeon® Processor 5500 Series servers) HP Confidential NDA required See the difference ProLiant G6 gives you the best return for your budget G6 Savings vs. G4 New HP G6 Lower Operating Costs $18,000/yr Power/Cooling Savings G6 savings vs. G5 Lower Operating Costs Featuring Intel Xeon 5500 $3,850/yr Power/Cooling Savings Lower Software Costs Lower Software Costs $31,200/yr $8,800/yr OS licensing Savings OS licensing Savings 2005 42 servers 2007 14 servers (single-core) (dual-core) 10700 W Rapid Payback 2009 3 servers Rapid Payback 3 month (quad-core) 12 month ROI from G4 450 W ROI from G5 2630 W *Source: Based on HP internal estimates HP Confidential NDA required Switch and Virtual Connect? What’s the difference? • • Server • • • LAN Server Server • • SAN Virtual Connect Part of server system Managed with servers Layer between servers and network, so network doesn’t see server changes Allows flexibility and control of system resources Ideal for virtualization environments Server Server Server Server Server Virtual Connect • Switch Part of LAN or SAN network Managed from network Server directly connected, so any server change impacts network LAN SAN Flex10 for HP Virtual Connect Map Flex10 NICs to any vNet NIC Server Blade NIC NIC NIC NIC Flex10 (port 1) NIC NIC NIC Flex10 (port 2) Flex10 LOM or Mezz Card For each NIC (PF), VC sets: • bandwidth (0.1 to 10 Gb/s) • NIC type (regular or iSCSI) • Priority • MAC address • vNet 1 vNet 2 vNet 3 vNet connection vNet 4 10Gb VC-Enet Module HP Confidential – NDA Required HP BladeSystem Matrix: A cloud infrastructure in a box Applies the economics, scalability and response time of cloud computing to traditional data center applications HP BladeSystem c-Class Portfolio Enclosures A Full Range of 2P and 4P Blades Workstation Blades Server Blades Unified Management Choice of Power Storage Blades Services Assessment Implementation Support Interconnect choices for LAN, SAN, and Scale-Out Clusters Virtual Connect LAN Ethernet NICs SAN h h HP Confidential – NDA Required h Fibre Channel InfiniBand 4X DDR Summary and customer case studies BladeSystem - delivering customer benefits •87 percent reduction in power consumption •HP Systems Insight Manager can spot problems with the hardware before they become catastrophic and it can switch virtual servers from malfunctioning systems to working blades.” “Implementing a virtualised HP BladeSystem is not just about technology – it’s about good business. When you add all the advantages together you’ve got a fantastic business case and a great return on investment. “The whole package of HP blade servers, HP Insight Manager and power management coupled with HP’s other software tools has proved to be an excellent solution. UEA now has close to 50 HP ProLiant c-Class server blades •280 physical servers consolidated onto 30 physical servers hosting a projected 400 VM’s •75 percent reduction in data center energy consumption, US$90,000 annual energy savings , 170 metric tons of CO2 saved per year •Approximately 80 stand-alone servers have been replaced with approximately 14 servers, •DC floor space has been reduced, leading to rental costs lowered by £115,000 per year. •HP Virtual Connect for the HP BladeSystem. This software dramatically simplifies Ethernet cabling and allows administrators to add or replace servers without having to reconfigure the cabling. •The new infrastructure with its HP BladeSystem boosts computing power and provides a highly available, high-performance publishing system. •An HP StorageWorks EVA6100 provides secure data storage and shared storage. •HP Virtual Connect simplifies and virtualises the Storage Area Network (SAN). Why HP BladeSystem and VMware • The number 1 blade platform – 2008 – 68% share • More certified VMware platforms than any other vendor • VMware installation and support services • Flexibility and choice— The widest choice on the market − Nine server blades − Storage offerings – DAS, NAS / ISCSI SAN + Tape back-up − Other options - Workstation blade / PCI expansion blade • Partnership with industry leading companies - www.hp.com/go/solutionblocks • Reduce costs—with HP BladeSystem your customers can save up to − 69% reduction in energy costs − HP BladeSystem costs up to 90% less to deploy; − Reduces facilities costs by around 25% − Capital costs by 36% − Reduce cables by up to 98%—reducing maintenance and complexity Tools and Resources • Promotions and offers − Free enclosure – www.hp.com/uk/freebladeenclosure − Trade in http://h41201.www4.hp.com/tradein/welcome.asp • Useful information / web sites − www.hp.com/go/bladesystem − www.hp.com/go/vmware − www.hp.com/go/insightcontrol − www.hp.com/go/insightdynamics − www.hp.com/go/tryessentials Questions Peter Mansell Peter.mansell@hp.com