50 Migrations in Less Than 24 Hours Name Title Date Agenda Barriers to Platform Adoption PlateSpin Migrate ® PlateSpin in Action What’s new? 2 © 2011 NetIQ Corporation. All rights reserved. Barriers to Platform Adoption Bringing New Platforms Online How do I get this stuff Up and Running? 4 © 2011 NetIQ Corporation. All rights reserved. Tools: Bare Metal Restore • Multiple Steps – Image Capture -> Image Deploy -> System Configuration -> Pray… • Error Prone • NOT Cross Platform • Downtime throughout the process 5 © 2011 NetIQ Corporation. All rights reserved. Tools: “Free” Migration Tools • Extra Manual steps – SysPrep • Lack of Network Optimization • Minimal Error Logging • Single Platform Support 6 © 2011 NetIQ Corporation. All rights reserved. PlateSpin Migrate ® A More Complete Solution PlateSpin® Migrate Fully automated migrations over the network. Physical Servers Blade Servers Virtual Hosts Image Archives Workload Decoupled from Hardware Decouple workload from host infrastructure 8 Live peer-to-peer workload migration © 2011 NetIQ Corporation. All rights reserved. Migration testing Sync-up prior to cut-over Flexible Migrations etc... • • • • • 9 Hypervisor agnostic, migrate to ESX, Hyper-V, Xen Hardware agnostic, migrate to bare metal Multi-OS support Migrate over LAN or WAN Fully Automated Solution © 2011 NetIQ Corporation. All rights reserved. Accelerate New Platform ROI Get There Faster Server Migration projects are time consuming. 11 Challenges Solution Manual rebuild process 5-7 hrs per server Which workloads/applications go where? Single core onto Multi-core? 100% automated Less than 1 hour migration time Integrated planning Hardware independent © 2011 NetIQ Corporation. All rights reserved. PlateSpin Migrate ROI 200 Server Refresh With PlateSpin Migration time: Migration Time: 7 hours per server avg. 3 hours per server avg. 200 x 7 = 1400 hours 200 x 3 = 600 hours 175 days 3 Concurrent migrations = 200 hours 25 days 8 man months! 1 month! x $80hr = $16,000 x $80hr = $112,000 License Cost approx. = $50,000 Total Project Cost = $50k + $16k ROI/Delta = $46,000 12 © 2011 NetIQ Corporation. All rights reserved. Customer Success - Essent The Customer 14 – The leader in the Dutch energy market – Turnover of EUR 6.4 billion in 2006 – Annual IT budget of EUR 130 million – 12,000 employees and 800+ IT staff – 700 servers and growing 100 per year – A mix of virtual and physical moves – Moving from HP to IBM hardware © 2011 NetIQ Corporation. All rights reserved. The Challenge 15 – Mandate to shrink 3 datacenters into one – Wanted to standardize IT infrastructure – Focus on minimizing risk © 2011 NetIQ Corporation. All rights reserved. The Solution – Looked at VMware Converter initially – no P2P, V2P – PlateSpin Recon to monitor the existing estate for new hardware planning and consolidation – PlateSpin Migrate for 260 migrations (P2P and P2V) across sites New Site 16 © 2011 NetIQ Corporation. All rights reserved. Results • “If we hadn’t gone with PlateSpin, it would have taken a team of 25 half a year to build all the applications in the new data center, an estimated cost of over EUR 3 million. • With PlateSpin, we were able to migrate all of our servers in one month with a team of less than eight people. • The PlateSpin solution brings a high return of investment. In retrospect, after seeing the time and cost savings, we would have been willing to pay a lot more for the PlateSpin solution.” Marco Spoel, Project Manager, IT Infrastructure, Essent 17 © 2011 NetIQ Corporation. All rights reserved. What’s New? PlateSpin Migrate 9.1 ® Improved Network Efficiency • Data compression – • Bandwidth throttling – • Migrate workloads in complex network environments Improved reports – 19 Share the network with other business applications by instructing Migrate to limit its bandwidth usage Network Address Translation (NAT) support – • Save bandwidth (and money) on migrations by compressing the data before sending it across the network Get more visibility into migration activities through scheduled email reports © 2011 NetIQ Corporation. All rights reserved. Expanded Platform Support • • Operating systems – Novell Open Enterprise Server 2 (SP2 & SP3) – SUSE Linux Enterprise Server 9 – Oracle Enterprise Linux 5.3 & 5.4 ® GPT support – 20 ® Migrate workloads formatted with GPT partitions © 2011 NetIQ Corporation. All rights reserved. Enhanced VMware Support • Thin disk provisioning – • Enhanced virtual network adapter support – 21 Save money on storage by provisioning storage on demand for the migrated workloads Benefit from the best-of-breed virtual network adapters for your migrated workloads © 2011 NetIQ Corporation. All rights reserved. Learn More • www.novell.com/products/migrate Thank you. 22 © 2011 NetIQ Corporation. All rights reserved. Questions? This document could include technical inaccuracies or typographical errors. Changes are periodically made to the information herein. These changes may be incorporated in new editions of this document. NetIQ Corporation may make improvements in or changes to the software described in this document at any time. Copyright © 2011 NetIQ Corporation. All rights reserved. ActiveAudit, ActiveView, Aegis, AppManager, Change Administrator, Change Guardian, Compliance Suite, the cube logo design, Directory and Resource Administrator, Directory Security Administrator, Domain Migration Administrator, Exchange Administrator, File Security Administrator, Group Policy Administrator, Group Policy Guardian, Group Policy Suite, IntelliPolicy, Knowledge Scripts, NetConnect, NetIQ, the NetIQ logo, PSAudit, PSDetect, PSPasswordManager, PSSecure, Secure Configuration Manager, Security Administration Suite, Security Manager, Server Consolidator, VigilEnt, and Vivinet are trademarks or registered trademarks of NetIQ Corporation or its subsidiaries in the United States and other countries.