Western Underground Committee Engineering & Substructures Fort Collins, Colorado 18 May 2011 • • • C119 Main Committee - Committee Voting Members C119 Executive Committee – Committee Officers and Standards Subcommittee Officers C119 Standards Subcommittees – – – – – – C119.1 : Sealed Insulated Underground Connectors C119.4 : Connectors for Use on Standard Conductors C119.5 : Insulation Piercing Connectors C119.6 : Non-sealed Multi-port Connectors C119.7 : Connectors for Use on High-Temperature Conductors C119 Testing Methods and Directives Total Voting Members and Alternates = 53 C119 Main Committee Voting Members = 38 Voting Membership Breakdown: Producers: Users: General Interest: 14 = 36.47% 15 = 39.47% 9 = 23.68% • C119.1 Subcommittee On Sealed Insulated Underground Connector Systems Rated 600 Volts A Revised Standard was published in the 1st Quarter of 2011 as C119.1-2011 – Revision includes enhanced Twist and Flex, Impact (direct buried), Resealability & Reusability testing – • Ongoing work for the next revision: Performance Testing at 130o C – Modes of failure in various types of enclosures – • C119.4 Subcommittee On Connectors for Use Between Aluminum-to-Aluminum, and Aluminum-to-Copper Conductors Designed for Normal Operation at or Below 93oC and Copper-toCopper Conductors Designed for Normal Operation at or Below 100oC – – • Just published as C119.4-2011 Optional Salt Spray and Fault Duty Tests are included in this revision Ongoing work for the next revision: – A Task Force is working on how to incorporate Shunting or Repair Devices into the C119 standards C119.5 Subcommittee On Insulation Piercing Connector Systems, Rated 600 Volts or Less (Low-Voltage Aerial Bundled Cables and Insulated and Non-Insulated Line Wires) – This New Standard was published in 2009 as C119.5-2009 Ongoing work for the next revision: Evaluate the possibility of including a salt spray contamination test • C119.6 Subcommittee On Non-sealed Multi-port Connector Systems Rated 600 Volts or Less for Aluminum and Copper Conductors A Revised Standard will be Published in the 2nd Quarter of 2011 as C119.6-2011 – Enhanced test criteria is included in this revision – • Ongoing work for the next revision: – – – Determination of test parameters for Pin Terminals Evaluate the possibility of including a salt spray contamination test Evaluate the possibility of including a short circuit test • C119.7 Subcommittee on High Operating Temperature Connector Systems (Above 93oC) – – – – – – A New C119.7-XXXX Standard is being developed Phase 1 of a Joint ANSI C119.7 - EPRI Project for testing the proposed high temperature test protocol is in progress Testing of ACSS, ACCR, and ACCC conductor– connector systems to validate the proposed test protocol is approximately 50% complete Phase 1 of the C119.7 – EPRI test protocol evaluation is scheduled to be completed in 2011 EPRI is doing additional long duration (1,500 cycle) heat cycle performance testing and scientific evaluation of connector – conductor interface performance at high temperatures Phase 2 of the C119.7 – EPRI test protocol evaluation is being planned for 2012 • C119 Testing Methods and Directives Subcommittee – – This Subcommittee has the responsibility of evaluating and recommending improvements for test lab procedures that are common to all of the C119 Standards The Subcommittee continues to develop a Common Test Requirements Guide Document which will be published as a supplement as applicable to all the C119 Standards • • • Fall 2011: Date: October 4-6, 2011 Location: San Diego, CA (Hotel Details are Being Finalized) Spring 2012: Date: Week of April 16, 2012 (Tentative) Location: Boston, MA (Tentative) Fall 2012: Date: Week of September 17, 2012 (Tentative) Location: Albuquerque, NM (Tentative) • • NEMA – ASC C119 Committee Secretariat Developer Name: National Electrical Manufacturers Association Acronym: NEMA (ASC C119) Committee Title: Connectors for Electric Utility Application Secretariat: National Electrical Manufacturers Association Contact: Paul Orr Title: Technical Program Manager Address: 1300 North 17th Street Rosslyn, VA 22209 Phone: (703) 841-3227 Fax: (703) 841-3327 E-Mail: pau_orr@nema.org WWW URL: http: www.nema.org Douglas Harms – Chairman ASC C119 Committee douglas.harms@centerpointenergy.com