YOUR COMPANY LOGO Company address SAFE WORK METHOD STATEMENT (SWMS) Date: For: Insert type of SWMS Address of Works Work includes High Risk Work Activity - Yes / No Activity: Describe Bus Phone: Mobile Contact: Work Method Statement No: ABN # Authorised by: Date of last modification: Version: Prepared by: Position: Training required for contractor staff to undertake this job or activity: Training records located where: Mandatory: Construction industry Induction (White Card) Engineering or Certificates of Competencies, Permits or Approvals required to undertake this activity: List major items of plant or equipment Required equipment checks prior to or during this activity: PPE required for this activity: Other Specific PPE: Persons responsible for supervising work on the job: Name: Position: Date Name: Position: Date Document1 Vers 1:12 1 of 4 Job Steps Hazards/Risks Initial Risk score Refer Risk Matrix Major steps /events in the work process What could go wrong? List the hazards or risks that workers and environment are exposed to during this stage of the work e.g.: falling from roof edge while cleaning gutters What is starting risk score? Control Measures Control measures to be selected and applied using the Hierarchy of Control – 1. Elimination -2. Substitution -3.Engineering (preferred ) 4. Admin -5 PPE What will be done on this site by the workers or the contractor to control this particular safety or environmental hazard or risk.eg: Use QUT roof safety anchorage system & only height trained staff can work on roofs Obtain roof access permit from FM . Responsibility for Control Residual Risk Score Refer Risk Matrix Contractor name After controls are in place , what is the risk now? YOUR COMPANY LOGO Control Monitoring How will the stated controls on the job be monitored to ensure that they are in place and effective?? E.g.: site supervisor presence on site at all times; weekly inspections of scaffolding; on the job safety observations by contractor Legislative Compliance:List all legislation pertaining to the works being under taken – e.g. 1. 2011 Workplace Health and Safety Act 2. 2011 Workplace Health and Safety Regulations S299– PCBUs’ obligation to prepare work method statement before starting high risk construction work S291– Meaning of High Risk Construction Work Part 4.5 – High Risk Work ( Licensing) 3. QLD Code of Practice -Plant 4. Other relevant H & S Codes of Practice and Industry Guidelines 5. 2002 Electrical Safety Act & Regulations & Codes of Practice 6. Environmental Protection Act 1994 Environmental Protection Regulation 2008 Environmental Protection (Noise) Policy 2008 7. National Environment Protection Council (Queensland) Act 1994 8. AS4360-2004 Risk Management 9. Other relevant AS/NZ Standards Safe Work Method Statement - Work Team Sign-on/ Review Register Personnel are required to sign this register to indicate they have read, understand and will work to the requirements of the SWMS This SWMS covers: Name Document1 SWMS No: Employee Signature Vers 1:12 Date Name Employee Signature Date 3 of 4 YOUR COMPANY LOGO Risk Rating Matrix Consequences Personal Harm Criteria Likelihood Probability: Is expected to occur in most circumstances Will probably occur Might occur at some time in the future Could occur but doubtful May occur but only in exceptional circumstances Injuries or ailments not requiring medical treatment. Minor injury or First Aid Treatment. Serious injury causing hospitalisation or multiple medical treatment cases. Life threatening injury or multiple serious injuries causing hospitalisation. Death or multiple life threatening injuries. Insignificant Minor Moderate Major Catastrophic 1 2 3 4 5 5 Almost Certain M (9) H (16) E (22) E (24) E (25) 4 Likely M (6) M (13) H (19) E (21) E (23) 3 Possible L (4) M (11) H (15) H (18) E (20) 2 Unlikely L (2) M (7) M (12) M (14) H (17) 1 Rare L (1) L (3) L (5) M (8) M 10) (*** The above matrix has been developed from Australian Standard 4360-2004 Risk Management ***) Document1 Vers 1:12 4 of 4