Overview of B&W Medical Isotope Production System Foundation for Nuclear Studies September 27, 2011 Steve Schilthelm Deputy Program Manager .1 The Babcock & Wilcox Company Government Operations B&W Technical Services Group, Inc. Manages and operates high-consequence facilities, provides technical services and support to government agencies and private customers B&W Nuclear Operations Group, Inc. Manufactures nuclear components for U.S. Department of Energy Power Generation Systems B&W Power Generation Group, Inc. B&W Nuclear Energy , Inc. Manufactures and services coal, biomass, CNG, concentrated solar power plant equipment, & Nox, Sox, mercury scrubbers Manufactures commercial nuclear components and provides services to commercial nuclear market High-Consequence Operations & Services Advanced Engineering and Manufacturing .2 Covidien Reach Extends Globally and Locally 20,000+ U.S. employees, 41,000+ worldwide Diverse healthcare products used in all clinical settings Products manufactured in 17 states Nuclear Medicine: One of two U.S. suppliers of technetium 99m (Tc 99m) Image used by permission of Covidien Covidien Tc 99m-based products sold in all 50 states .3 B&W MIPS – 99Mo Production Using Aqueous Homogeneous Reactor Market studies in Late 1990s Patented in 1997 (Dr. Russell M. Ball) 2007 MIPS project re-initiated 2009 Agreement with Covidien 2009 Cooperative Agreement with NNSA Non-proliferation Domestic (LEU) supply AHR using LEU offers safety, safeguards, simplicity and waste advantages .4 AHRs are not New Technology CLEVELAND, OH CLEVELAND, OH SHEBA Reactor, LANL Over 30 AHRs Built and Operated .5 AHR - America’s First University Reactor N.C. State’s – R1 (1953-73) .6 Traditional Technology 235U Target Fabrication Transport Target Irradiation: Several days Reactor: 10,000 -100,000 kilowatts 99mTc User Medical Facilities Dissolved Target Waste with 235U Transport 99Mo Processing Facility 99mTc Generator Facility .7 B&W MIPS Technology MIPS Facility AHR Reactor 240 kilowatts- 5 days 99mTc User Medical Facilities Initial Fuel Solution Preparation Reactor fuel/target solution returned for subsequent irradiation 99mTc 99Mo Generator Facility Processing Cells .8 Completing R&D Phase of Project National Laboratories Argonne Los Alamos Armed Forces Radiobiology Research Institute, MD Purdue University B&W Labs, VA INVAP, Argentina .9 MIPS Project Progress Conceptual design complete NRC licensing and waste policy decisions complete Environmental analysis prepared Completing R&D activities Following legislation (HR 3276, S 99) Entering detailed design and licensing phase of the project .10 B&W MIPS Summary Mo-99 production using LEU AHR results in: Increased efficiency Reduced waste No proliferation concerns Safe operation Stable domestic supply .11