Option B Option C - Bay District Schools

advertisement
2013-2014
Teacher Appraisal System
Updates
by: Dawn Capes,
Coordinator for
Teacher and Administrator
Appraisal Systems
Handout
• Handouts will be referenced in this
presentation
• It is available at the Project 8 website at
http://www.bay.k12.fl.us/rttt/Project8.aspx
Oversight Committee Approved
• All information in this presentation has been
approved by the Oversight Committee for
Teacher and Administrator Appraisal Systems
• ABCE members, principals, and district staff
Agenda
•
•
•
•
•
•
•
•
New: Option “C”
Review: Option “B”
IPDP information
Assessment updates (K-3, PERT)
Timeline updates
2013 Framework for Teaching
Human Resources- Employee Information
AIMS
Why Option B and C?
• Gone through the new Appraisal System
process twice
• Listened to administrators and teachers
• Continually searching for ways to meet the
law as well as the needs of administrators,
teachers and students
• Option B and C are the result of this process
Handout- Page 2
Option B
Option C
Available to Category 3 & 4 teachers
Available to Category 3 & 4 teachers
With HE/E 12/13 Summative Rating
With HE/E 12/13 Summative Rating AND HE/E Instructional Practice Ratings
Who had a Direct Measurement for Student Growth for the 12/13
school year (FCAT, IB, AICE, AP, Dual Enrollment, FAA, and ESE
using Brigance)
Who had an Indirect Measurement for Student Growth (students who took
FCAT but are not in an FCAT course) or who had a School Student Growth (K-3,
guidance, media specialists, etc.) or who had a District Student Growth (MTSS,
ESE Resource Teachers, etc.) for the 12/13 school year
Agree that the 13/14 Instructional Practice (Domains 1-4) be
Agree that the 13/14 Instructional Practice Domains 2-3 will be based on 12/13
equal to 13/14 Student Growth Score (unless Student Growth is NI Instructional Practice Domains 2-3.
or U; then the Instructional Practice score will be no less than E.
Teacher does not receive Option B for following school year.)
No pre or post conference or formal observation
No pre or post conference or formal observation
4 Classroom Walkthroughs (2 to ensure maintenance of Domains
1-4
4 Classroom Walkthroughs announced/2unannounced) to ensure maintenance
of Domains 2-3. Note: The rating can change
With written feedback provided by an administrator
With written feedback provided by an administrator especially if maintenance is
not observed or if performance rating will change
Teacher completes IPDP
Teacher completes evidence collection for Domain 1 (lesson plans and IPDP) and
Domain 4
Option B extended by Principal and selected by teacher in AIMS
Companion site
Option C extended by Principal and selected by teacher in AIMS Companion site
Option can be revoked
Option can be revoked
Review of Option B
•
•
•
•
•
•
•
•
•
•
Available to Category 3 & 4 teachers
With HE/E Summative Rating from 12/13
Who had a Direct Measurement for Student Growth for 12/13 school year (FCAT,
IB, AICE, AP, Dual Enrollment, FAA, and ESE using Brigance)
Agree that the 13/14 Instructional Practice (Domains 1-4) be equal to 13/14
Student Growth Score (unless Student Growth is NI or U; then the Instructional
Practice score will be no less than E. Teacher does not receive Option B for
following school year.)
There is no pre or post conference or formal observation
There are 4 Classroom Walkthroughs (2 announced/2 unannounced to ensure
maintenance of Domains 1-4)
With written feedback provided by an administrator
Teacher completes IPDP
Option B extended by Principal and selected by the teacher in AIMS
Handout
Companion site
Pg 2
Option can be revoked
New! Option C
•
•
•
•
•
•
•
•
•
•
Available to Category 3 & 4 teachers
With HE/E 12/13 Summative Rating AND HE/E Instructional Practice Rating
Who had an Indirect Measurement for Student Growth (students who took FCAT but
are not in an FCAT course) or who had a School Student Growth (K-3, guidance, media
specialists, etc.) or who had a District Student Growth (MTSS, ESE Resource Teachers,
etc.) for the 12/13 school year
Agree that the 13/14 Instructional Practice Domains 2-3 will be based on 12/13
Instructional Practice Domains 2-3
There is no pre or post conference or formal observation
There are 4 Classroom Walkthroughs (2 announced/2 unannounced) to ensure
maintenance of Domains 2-3. Note: The rating can change.
With written feedback provided by an administrator especially if maintenance is not
observed or if performance rating will change
The teacher completes evidence collection for Domain 1 (lesson plans and IPDP) and
Domain 4
Option C is extended by Principal and selected by the teacher in AIMS
Handout
Pg 2
Companion site
Option can be revoked
Option B and C
• Currently, we do not know who can receive
Option B and C.
• We do not have the Summative Ratings at this
time.
• Time to think about it!
• We hope to have all Student Growth results in
and applied to Summative ratings in
September.
Pause
• Take a moment to reflect on the differences
between Option B and Option C.
• What are the similarities? Differences?
• Given the Option for either one, would you
take it, or not?
Individual Professional
Development Plan
• Request by teachers and administrators serving on
the Oversight Committee and IPDP sub committee to
continue to clarify the rubric and provide training
that will help with consistency across the district
• Changes have been made to the rubric
• Training to be provided during school-based inservice
• Goal of the training
• Understanding of the changes
• Explain the IPDP process
• Provide opportunities for rating collaboration
IPDP FYI
• SB1664 one word “Require” to “May”
• However
– Race to the Top agreement states that the IPDP will be a
metric in our “multi-metric system”
– State Board of Education Protocol Standards for
Professional Development include IPDP requirements
• DOEs ultimate goal is to revise policies so that goals
can be achieved in a variety of ways (IPDP or PLC
process, for example)
• IPDPs will still be completed for the 13/14 school
year
FYI: More about SB1664
Classroom teachers
• For the 13/14 School Year, student growth can only be applied
based on students served
• No School VAM for Classroom Teachers for 13/14
• Can Use• Direct Measurements (FCAT, Alg I, FAA, IB, AICE, AP, Dual Enrollment,
Brigance, Industry Certification, SAT 10, PERT)
• Indirect Measurements (FCAT Reading VAM based on students who
took FCAT but not in an FCAT course, i.e. science)
Non-classroom teachers
• Can use School VAM for Student Growth
New Assessment Additions
K-2
• SAT 10 (Common Core Aligned)
• Direct Measurement of Reading
• Post Test planned for the end of May
• All students enrolled during testing window will test
3rd Grade
• FCAT
• Direct Measurement of Reading
Math for College Readiness (MCR) and English IV: Florida College Prep
• PERT
• Direct Measurement
• Indirect Measurement of Reading where applicable
Oversight Committee will meet in September and more information will be
forthcoming
Pause
• Take a moment to discuss the new
assessments, if they apply to you or your
school.
• What questions and concerns do you have?
Detail
Timeline
Also Available at the
Race to the Top,
Project 8 link
http://www.bay.k12.fl.us/rtt
t/Project8.aspx
Handout
Pgs 3-7
Take Note of These
Date
Item
October 24
Teacher submits draft IPDP to admin
New
Dates
(Page 3)
October 31
Admin provides feedback and rating
(Page 3)
January 17
IPDP Mid-Year review: NO Domain 4 review will be completed
(Page 3)
February 7
Teacher submits Domain 4 evidence
(Page 5)
February 14
Admin provides preliminary Domain 4 ratings
(Page 5)
March 14
(Page 7)
All Walkthroughs for Option B and C are completed
Yearly
Timeline
Also available at
the RTTT Project
8 link
http://www.bay.k12.fl.us/rttt
/Project8.aspx
FYI: 2013 Framework for Teaching
• Intent of each item remains the same
• Provides examples for each component as well as critical
attributes (guidance for observers)
• AIMS will continue to reflect the 2007 version; however, the
2013 version will be used in training to clarify components
and calibrate teacher ratings provided by administrators
• Will not be uploaded to AIMS because Teachscape owns the
digital rights
• All stakeholders are encouraged to download the Framework
and use it as a reference guide
http://www.danielsongroup.org/userfiles/files/downloads/20
13EvaluationInstrument.pdf
Pause
•
•
•
•
Take a moment to discuss the timeline.
What questions do you have?
Think about the Framework for Teaching.
What questions do you have?
FYI: Human Resources Information
•
•
•
•
•
•
Answers those “What if….” types of questions
Pulls all into one section of the manual
Evaluation Process
Dissatisfaction with Evaluation
Evaluations and Corrective Action
Remediation Process
Handout
Pgs 8-9
AIMS
• AIMS has undergone a FACELIFT!
– Changes by both Truenorthlogic and the District
• Goal is to have a more user-friendly website
– No more drop down arrows to find and click
– Appearance is difference
– Categories 1 & 2 and Categories 3 & 4 have been merged
• Step by step directions, with screen shots, provided to guide
teachers through the process
• The self-assessment is available starting August 13th
• When you are ready to complete your Self-Assessment,
directions can be found at the Project 8 link at
http://www.bay.k12.fl.us/rttt/Project8.aspx
Getting to Project 8
All Teacher Appraisal Information can be found by going to
• www.bay.k12.fl.us
• Employees Tab
• Race to the Top link on the left-hand side
• Then the Project 8 link
Note: The 13/14 manual is not complete as the district awaits
Student Growth updates from DOE.
Questions?
• Contact
– Dawn Capes, Coordinator for Teacher and
Administrator Appraisal Systems
– 850-767-5449
– capesda@bay.k12.fl.us
–
@DawnCapes1 (for Teacher Appraisal System
updates)
• Speak to your administrator
• Explore the resources available at the website
Download