Conference Call 2013 Results March/2014 Economic-Financial Office and Investor Relations Office Notice This presentation may contain forward-looking statements referring to SABESP’s business outlook. operating and financial results estimates. and growth prospects. These are only projections. and as such. they are exclusively based on SABESP’s management expectation in relation to the future of business and its continuous access to capital to finance the Company’s business plan. These forward-looking statements largely depend on changes in market conditions. governmental rules. industry performance and the Brazilian economy. amongst other factors. in addition to risks exhibited in disclosure documents filed by SABESP. Therefore. they are subject to changes without prior notice. 2 Billed Volume Total water and sewage billed volume, including wholesale (million m³) 2.8% 3,728.2 3,628.3 2.9% 3.5% 961.2 928.9 Sewage 2.6% 3.7% 407.7 393.1 Water 3.3% 1,579.1 1,534.5 535.8 553.5 4Q12 4Q13 2,093.8 2,149.1 2012 2013 Losses Billed Water Volume Produced Water Volume 786.0 774.0 25.7 752.0 762.0 553.5 535.8 759.0 534.7 25.5 25.3 532.5 528.5 4Q12 1Q13 2Q13 3Q13 4Q13 4Q12 1Q13 2Q13 3Q13 4Q13 4Q12 1Q13 2Q13 3 Financial Highligts (R$ million) 11,315.6 Net operating revenue 10,737.6 Costs, adm, selling and construction expenses 8,182.5 7,864.6 Net income 4.0% 0,4% 4,006.6 Adjusted EBITDA EBIT 5.4% 3,605.0 11.1% 3,135.5 2,866.5 9.4% 1,923.6 38,9% 0.6% 1,911.9 2013 2012 4 Costs and Expenses (R$ million) Costs and expenses in 2012*: R$ 5,450.2 Costs and expenses in 2013*: R$ 5,788.0 3.4% 10.8% 1,739 1,927 (6.3%) 1,076 1,112 590 3.4% 18.0% 688 711 739 871 6.2% *Not including construction costs 553 35.6% (45.9%) 6.4% 241 182 193 10.7% 192 178 104 Payroll and Benefits Supplies Treatment supplies Services Electric power 2012 General Expenses 2013 Depreciation and Amortization Credit writeoffs 68 76 Tax expenses % Net Revenue in 2012 16.2% 1.7% % Net Revenue in 2013 17.0% 1.7% 1.7% 10.0% 5.5% 6.4% 6.9% 1.8% 0.6% 2.1% 9.8% 4.9% 6.3% 7.7% 0.9% 0.7% 5 Net Income – Main variations 578.0 (317.9) 35.4 (187.5) (59.2) 1,911.9 2012 Net Income 2012 Net Operating Revenue 10,737.6 Costs and Expenses (7,864.6) Other Revenues and Expenses (29.7) Net Financial (295.7) Income tax and social contrib. (635.7) 2013 11,315.6 (8,182.5) 5.7 (483.2) (732.0) Net Income 2013 Net Income 2012 N.O.R. Costs and Expenses Other Rev. and Expenses 1,923.6 Chg. 1,911.9 578.0 (317.9) 35.4 (187.5) (96.3) 1,923.6 Net Financial Income Tax and Social Contribution Net Income 2013 6 Interconnected Metropolitan Water System Water System Capacity Volume produced Production m³/s 2013 m³/s Cantareira 33.0 32.6 Guarapiranga 14.0 13.6 Alto Tietê 15.0 12.1 Rio Claro 4.0 4.8 Rio Grande 5.0 3.9 Alto Cotia 1.2 1.2 Baixo Cotia(a) 0.9 0.8 Ribeirão da Estiva (a) 0.1 0.1 Total 69.1 (a) has no reservoir 7 jan/03 mar/03 mai/03 jul/03 set/03 nov/03 jan/04 mar/04 mai/04 jul/04 set/04 nov/04 jan/05 mar/05 mai/05 jul/05 set/05 nov/05 jan/06 mar/06 mai/06 jul/06 set/06 nov/06 jan/07 mar/07 mai/07 jul/07 set/07 nov/07 jan/08 mar/08 mai/08 jul/08 set/08 nov/08 jan/09 mar/09 mai/09 jul/09 set/09 nov/09 jan/10 mar/10 mai/10 jul/10 set/10 nov/10 jan/11 mar/11 mai/11 jul/11 set/11 nov/11 jan/12 mar/12 mai/12 jul/12 set/12 nov/12 jan/13 mar/13 mai/13 jul/13 set/13 nov/13 jan/14 mar/14 Porcentagem do Volume Máximo (%) Volumes – SP Metro Region Systems - 2003 to 2014 110,0 100,0 90,0 80,0 70,0 60,0 50,0 40,0 mar/14 37,8 30,0 20,0 10,0 mar/14 14,0 - Cantareira Guarapiranga Rio Grande Rio Claro Alto Tietê Cotia 8 Monthly volume – Cantareira System 2003 to 2014 9 Evolution of storage conditions in Cantareira System Temperature average/monthly 30.0 25.0 ºC 20.0 15.0 10.0 5.0 fev-14 jan-14 dez-13 nov-13 out-13 set-13 ago-13 jul-13 jun-13 mai-13 abr-13 mar-13 jan-13 fev-13 0.0 CANTAREIRA SYSTEM Monthly affluence (m³/s) 80.0 70.0 60.0 50.0 40.0 30.0 20.0 22.1 22.5 25.1 20.4 10.0 15.4 10.5 0.0 outubro novembro dezembro janeiro fevereiro Média Histórica março abril maio Mínima Histórica junho julho agosto setembro 2013/14 10 Measures and Actions Bonus Program 20% water bill savings = 30% discount on the water and sewage bill Scope: Since February consumers served by the Cantareira System As from April all consumers served in the SPMR Duration: February to December 37% of the population served by the Cantareira System already reached the water savings goal Utilization of the Technical Reserve of the Cantareira System Available volume equivalent to 20% of total storage capacity R$ 80 million investment Implementation up to June 2014 11 Investment in water 1995-2013 - R$ 9.3 Billion invested in water Increase of the availability of water/source 14.9 m³/s Increase in water production capacity from 57.6 to 73.2 m³/s Increase in water reservoir volume 130,000 m³ Building of 175 Km of mains and 11,000 Km distribution network Implemented approximately 1.8 million water connections Billed water loss reduction by more than 9% Planned Water Capex Corporate Program for Reduction of Water Loss Goal 18% in 2020, R$ 5.9 billion investment between 2009-2020 São Lourenço Production System + 4.7m³/s water production in 2018, R$ 2.2 billion capex 12 Integration Jaguari – Atibainha 13 Capex (R$ million) 2013 Capex Investment by segment Water Sewage Total Metropolitan Region 652.4 977.3 1,629.7 Regional Systems 451.3 635.0 1,086.3 1,103.7 1,612.3 2,716.0 Total Capex Plan 2014-2018 2014 2015 2016 2017 2018 Total 815 825 814 750 724 3,928 1,169 1,259 1,227 1,371 1,278 6,304 Other 658 592 489 374 418 2,531 Total 2,642 2,676 2,529 2,496 2,420 12,763 Water Sewage 14 www.sabesp.com.br IR Contacs Mario Azevedo de Arruda Sampaio Head of Capital Markets and Investor Relations maasampaio@sabesp.com.br +55 (11) 3388-8664 Angela Beatriz Airoldi Investor Relations Manager abairoldi@sabesp.com.br +55 (11) 3388-8793