KINGDOM OF MOROCCO MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT ALTERNATIVE AND RENEWABLE ENERGY MOROCCO: INTEGRATED APPROACH SOLAR PLAN AMAL HADDOUCHE GENERAL ENGINEER, COUNSELOR OF THE MINISTER OF ENERGY, MINES, WATER AND ENVIRONMENT MANAMA, 6-7, OCTOBER 2010 OUTLINE I MAIN ISSUES FOR THE MOROCCAN ENERGY SECTOR II THE NEW ENERGY STRATEGY III WIND NATIONAL PLAN IV SOLAR NATIONAL PLAN V CONCLUSION 2 Primary energy consumption • En billion TOE 15,5 High dependancy • En % 94.5 Energy Bill • En billion Euros ~5.0 Consumption/KWH • Per Hab 717 Sustainable Energy demand Primary energy: 1999-2009 • En %/an Electricity: 1999-2009 • En %/ an ~5 ~6.5 Limited fossil resources Reduce the high dependancy Fluctuations and volatility of the markets Mobilize domestic renewable resources Promote energy efficiency Preserve the Environment and ensure sustainable development with emissions reduction of CO2 Ability to satisfy increasing demand Plan dessalement Plan Emergence Tanger Med et pôle Industriel TFZ Plan OCP Jorf Lasfar Hub Plan Maroc Vert Intégration de l’ensemble de l’économie nationale au niveau de la demande électrique Plan Azur Politique sectorielle utilities ONE-ONEP NEW STRATEGY TO ADDRESS THESE CHALENGES Diversify and optimize the energy mix around reliable and competitive energy technologies in order to reduce the share of oil from 63% in 2009 to around 40% by 2030 Reduce dependancy on energy imports by developing domestic energy sources, mainly by developing renewable energy Make energy efficiency a national priority Preserve the environment Integrate into the regional energy market through enhanced cooperation and trade with both arab countries and the EU countries (Advanced statute) THE NEW STRATEGY FOR RE & EE: AN INTEGRATED APPROACH CLEAR RENEWABLE ENERGY OBJECTIVES for Medium & Long terms 2 integrated programs: 2000 MW solar & 2000 MW wind to implement at 2020 CLEAR ENERGY EFFICIENCY OBJECTIVES for Medium & Long terms Energy Efficiency as a national priority SOUND LEGAL, INSTITUTIONAL AND REGULATOTY FRAMEWORK AMBITIOUS: LOCAL INDUSTRY SUPPORT BY SOUND R&D PROGRAMS ,TRAINING AND CAPACITY BUILDING SUPPORT OF THE POLICIES BY SOUND LEGAL AND INSTITUTIONAL FRAMEWORK NEW LAW FOR RENEWABLE ENERGY Objectives Increase the share of Renewable Energies Promoting Investment for Export Assistance in site selections, permits and authorization Access to National Grid and Interconnections Access to Regional Markets (OMEL, MIBEL, POWERNEXT,…) Possible Equity partnership Promoting Investment in the field of Renewable Energies to meet local demand MOROCCAN AGENCY FOR SOLAR ENERGY Conduct overall project (design, choice of operators, implementation, management ....) Coordinate and supervise others activities related to this program NEW AGENCY FOR THE DEVELOPMENT OF RENEWABLE ENERGY AND ENERGY EFFICIENCY Law to be enacted soon Objective: development of renewable energies and Promotion of energy efficiency. ENERGY EFFICIENCY Law under promulgation Improve energy efficiency DEVELOPMENT ENERGY FUND 2 ways actions : Financial incentives for RE and EE programs Equity investments through the Energy Investment Company: SIE RENEWABLE ENERGY: RE SHARE OF RE AT THE HORIZON 2020 6188 100% 80% 60% 8056 11048 19% 4% 13% 7% 14% 22% 18% 14% 14% 2% 33% 18% 24% 40% 7% 20% 34% 26% 7% 14755 14% 11% 10% 39% 22% 26% 0% 2009 Charbon Eolien 2012 Gaz Solaire 2015 Fioul Nucléaire 2020 Hydraulique MW 42% RENEWABLE ENERGY INTEGRATED WIND PLAN IMPLEMENTATION OF 2 000 MW AT THE HORIZON 2020 ESTIMATED ANNUAL PRODUCTION: 6600 GWh ESTIMATED COST: 31,5 billions DHS (3,5 billions Dollars) 5 selected sites : Sendouk (Tanger), Koudia Baida II (Tétouan), Taza (Taza), Tiskrad (Laâyoune), Boujdour (Boujdour) This plan will allow : • • Saving 1,5 millions of TOE, Avoiding the emission of 5,6 millions tons of CO2 per year The first wind park within this plan will be commissioned on 2014 The plan refers to the development of domestic wind industry 10 MOROCCAN SOLAR PROJECT An investment of 9 billion USD by 2019 • Installed Capacity : 2000 MW • 4500 GWh per year • 9 billion USD • 10 000 hectares dedicated •5 dedicated sites • First plant : Ouarzazate - 2015 11 MOROCCAN SOLAR PROJECT NATIONAL DECISION TO BET ON THE RE FUTUR • GLOBAL AND INGTEGRATED PROJECT • SUPPORT OF THE HIGH LEVEL AUTHORITY • CLEAR POLITICAL SIGNAL FOR DEVELOPING RE AND SOLAR IN PARTICULAR • ANTICIPATE INTERNATIONAL MARKET • SOLAR ENERGY, A CRUCIAL STAKE, IN ACCORDANCE WITH THE CHOICE OF DEVELOPING SUSTAINBLY • AVOIDED EMISSIONS: 3,7 millions tons of CO2 per year. 12 SOLAR MAP IRRADIATION OF MOROCCO Rabat Ain Beni Mathar Ouarzazate Sebkhate Tah Foum Al Ouad Boujdour OUARZAZATE SITE DNI: 2635kWh/m²/an Ain Beni Mathar Ouarzazate Puissance: 500 MWe Superficie : 2500 ha SebkhatProduction tah : 1150 GWh/an Foum Al Ouad Boujdour Ouarzazate SOLAR PLAN: INTEGRATED PROJECT WITH SECTORIAL SYNERGIES REGIONAL DEVELOPMENT: o Social and economical benefits for the regions where sites are located Specialized training and capacity building: o Specific modules in schools of engineering; o Specialized techniciens in solar energy by professional Institutes R & D: o A key to replicate and improve futur projects Industrial development and integration: o Know how development; o Development of an industrial tissue specialized in solar field. 11 A SPECIFIC COMPAGNY DEDICATED TO THE PROJECT A dedicated society has been created on Feb. 2010: Moroccan Agency for Solar Energy (MASEN) o Ensure the supervision of the whole (conception, studies, operators selection, supervision of the execution ….) Agency with public funds: State o Hassan II Fund for Economical and Social Development o SIE: Société d’Investissements Energétiques o ONE o 12 SOLAR PLAN: PROJECT REALIZATION Selection of developpers: international bids Diversified financing Mechanisms of 13 STEPS TOWARDS THE REALIZATION First site: Ouarzazate; Following the invitation for Expression of Interest issued on march 2010, MASEN has launched the pre-qualification process for the development of the 1st phase of the Ouarzazate solar power plant. o 1st stage: 1 or more thermal solar plants with minimum capacity of 125 MW2014 o Subsequent stages will be launched by the end of 2012 Selection of the developpers of the 1st stage on April 2011 Financial closure by the end of 2011 Starting the construction: second semester of 2011 12 CONCLUSION • Morocco has adopted an integrated approach for developing RE & EE based on clear objectives, plans for medium and long terms . • Private sector will play an important role in realizing these projects especially solar plan: more visibility and opportunities of investments. • The ambitious is to develop local industries and companies. • The government has implemented sound legal, institutional and regulatory frameworks. Some details of this regulation are under finalization for some specific aspects. • Support to develop R&D and know how related to RE & EE.