Presentation, Duncan Thompson, NDA Strategy Update

advertisement
NDA’s Strategy - Update
Feb 2013
Duncan Thompson
Head of Strategy Development
Version 2
Today’s Discussion Points
1. NDA’s Strategy - Strategic Themes
2. Strategy Content – Expectations over 20 years
3. The delivery model – recap
4. 2012 - Feedback on strategy development infrastructure
5. Strategy development priorities for each Theme
6. Immediate next steps
2
NDA Strategy
NDA Strategy – Published April 2011
3
NDA Strategy
Strategic Themes
4
NDA Strategy
Strategic Themes
5
NDA Strategy
Strategic Themes
6
NDA Strategy
Strategic Themes
7
NDA Strategy
Scope of NDA Strategy
SITE RESTORATION
SPENT FUEL
NUCLEAR MATERIALS
INTEGRATED WASTE
MANAGEMENT
Decommissioning &
Clean-Up
Magnox Fuel
Plutonium
Higher Activity Waste
Land Quality Management
Oxide Fuel
Uranics
Lower Activity Waste
Site End States
Exotic Fuels
Non-Rad & Hazardous
CRITICAL ENABLERS
BUSINESS
OPTIMISATION
Public & Stakeholder
Engagement
Revenue Optimisation
HSSSEQ
Asset Management
Supply Chain
Development
Transport & Logistics
Land & Property
Management
Research &
Development
Contracting &
Incentivisation
Info & Knowledge
Management
Funding
People
Competition
Socio-Economics
International Relations
8
10 and 20 year expectations (AS AT 2011)
During the next 10 years (by 2021) we expect:
•
all Magnox stations to have been defuelled and spent fuel reprocessed to
a long-term stable form
•
three of the Magnox sites to have entered the Care and Maintenance
phase in readiness for Final Site Clearance
•
significant progress to have been made on high hazard reduction
programmes, this includes progress with the retrieval of materials from
Legacy Ponds and Silos at Sellafield.
•
the management of all NDA sites to have been competed
•
all NDA’s non core assets to have been disposed of
•
to commence Surface-Based Investigations Phase for the Geological
Disposal Facility (GDF).
9
10 and 20 year expectations (AS AT 2011)
During the next 20 years (by 2031) we expect:
•
all other Magnox sites to have entered Care and Maintenance
•
decommissioning to have been completed at Harwell and Winfrith
•
at Dounreay, all ILW to have been removed from the shaft and all
residues from the Dounreay Fast Reactor (DFR)
•
at LLWR, the Plutonium Contaminated Material (PCM) facilities to have
been removed
•
confirmation of a site’s suitability to host a Geological Disposal Facility
that complies with safety and environmental regulatory requirements,
and commence the Construction and Underground Investigations Phase.
FOR MORE DETAILED, RECENT AND SITE BY SITE TARGETS GO ONLINE
FOR OUR STRATEGY AND OUR ANNUAL BUSINESS PLAN.
10
NDA Operating model
Implementation – NDA’s Intelligent Client Model
- Long term scenario planning
- Options development
- Performance
contracts
- Performance monitoring
- Deep dive assurance reports
- Performance & financial reporting
- Sanctioning of major projects
- Post project approval reports
- Corporate Planning
- Securing & allocating funds
- Operational planning
- Selecting delivery partners
- Contract Incentivisation
11
NDA Contract Model
COMPETITION
Parent Body
Owner of licensee
Parent Body
3
Transferable SLC
Licensee
Primary Contract with NDA
1
NDA
1. Ownership of SLC shares
2
2. Primary NDA Contract
CONTINUITY
5
Transferable SLC
Regulators
4
2nd tier Subcontractors perform the scope of their
Subcontracts
3. Parent Body Agreement
4. Subcontracts
6
5. Statutory consultation
requirement
6. Statutory and/or Licence
or consent requirements
12
Strategy development infrastructure - SDIG, TOGs,
underpinning groups and R&D interfaces
13
1 Feedback Received - Positive
•
•
•
•
•
•
•
•
Strategy development infrastructure has served us well, thematic
approach is good, MOD has adopted similar.
Overall shape and structure of strategy development mechanics is
comprehensive and involves participation from the relevant
parties.
Engagement works well - TOGs are a good fora.
Gated process is good.
Engagement with NDA on strategic issues good, MOD continues
to increase participation in TOGs.
NDA strategy team people are professional, proactive and pivotal.
SDIG provides helpful briefing and opportunity for discussion.
Strategy content is good – no issues.
14
1 Feedback Received - Suggestions
15
2 Further improvements planned for 2013
– Create a Site Restoration Roadmap in order to provide better
visibility of the strategic issues and risks that drive our
Strategy Development work.
– Create and maintain an integrated strategy development
workplan for use at SDIG and TOGs.
– Report progress against the strategy development workplan.
– Make NDA’s Strategic decision calendars (and SLC decision
calendars) more visible and accessible.
– Use strategic tolerances and dashboards to provide Strategy
implementation feedback to SDIG
– Critical enablers TOG - make it work.
– Start to consider approach to next version of NDA’s published
strategy.
16
Site Restoration Roadmap – within
the Strategy Development Cycle
ROADMAP
Strategic estate-wide view
of implementation plans
Performance indicators
Strategic Tolerances and
Dashboards
·
·
·
·
Issues, risks and
opportunities
External influences
Policy changes
Stakeholder views
Regulatory changes
Other
LTP’s
SLC Decision
Calendar
Critical Enablers
Strategy
Development
Work Plan
NDA’s Integrated Strategy Development
Workplan
Alternative Strategic futures
Estate-wide strategic coordination
Site Restoration
Strategy
Development
Work Plan
IWM
Strategy
Development
Work Plan
Strategic Decision
Calendar
SF&NM
Strategy
Development
Work Plan
Revised NDA Strategy, Guidance and Client Specifications
17
Site Restoration Roadmap
What is a roadmap?
• A communication tool that conveys the restoration strategy for
our estate. It demonstrates the key milestones to be achieved
and the attributes of each site as restoration progresses.
What will it be used for?
• To provide an accessible, clear representation of the
restoration journey for each of our sites.
• To inform NDA’s strategy development planning, by helping us
to systematically identify risks and opportunities in the current
plans and allowing us to map out the consequence of
implementing strategic alternatives.
Our current strategy development priorities are developed
using expert professional judgement but would benefit
from a roadmap to help with systematic identification of
risks and opportunities
18
Strategy Development Topics
- Spent Fuel and Nuclear Materials
ROADMAP
Strategic estate-wide view
of implementation plans
Performance indicators
Strategic Tolerances and
Dashboards
·
·
·
·
Issues, risks and
opportunities
External influences
Policy changes
Stakeholder views
Regulatory changes
Other
LTP’s
SLC Decision
Calendar
Critical Enablers
Strategy
Development
Work Plan
NDA’s Integrated Strategy Development
Workplan
Alternative Strategic futures
Estate-wide strategic coordination
Site Restoration
Strategy
Development
Work Plan
IWM
Strategy
Development
Work Plan
Strategic Decision
Calendar
SF&NM
Strategy
Development
Work Plan
Revised NDA Strategy, Guidance and Client Specifications
▪ Potential new build scope
19
Deliverables in 2013/14 - DRAFT
- Spent Fuel and Nuclear Materials
Magnox
1.0 (Op plan N087): Confirm strategic position for the Magnox Contingency
Options - wetted fuel and dry fuel. (Q4 12/13).
Complete Annual Review of Strategy deliverability. (Q4 13/14)
Oxide
2.0 Complete annual review of Strategy.(Q2 13/14)
3.0 Support DECC in achieving satisfactory outcome to difficult fuels in
consultation (BNFL and UKAEA). (Q4 13/14)
4.0 Carry out Credible Options study on Spent Fuel Management in the UK for
New Build Fuel for DECC. (Q4 13/14)
Exotics
5.0 (Op Plan N085): Deliver a “map” of all NDA liability spent fuels and nuclear
materials that are external to NDA sites. (Q1 13/14)
6.0 Credible Options study on fuel disposition route for all exotics not already
covered (excluding propulsion fuel). (Q? 13/14)
7.0 Secure final decision on management of MOD propulsion fuel. (Q? 13/14)
20
Deliverables in 2013/14 - DRAFT
- Spent Fuel and Nuclear Materials
Pu
8.0 Provide updated advice to Government on Pu Disposition.
- Advise on what technologies to take forward. (Q1 13/14)
- N078 recommend to Government, forward management plan to
implementation. (Q3 13/14).
9.0 Determine forward strategic closure plan for remaining overseas owned Pu
(especially Japanese) (timing dependant on 8.0).
Uranics
10.0 Continue to underpin our Uranics Strategy, including establishing a strategic
position on NDA owned stocks of reprocessed and tails uranium (including
establishing the principles for whereby some quantities of uranium, for which
there is no reasonable prospect of recovery, could be sentenced as waste.)
(Q4 13/14)
11.0 Review policy/strategic principles for overseas owned uranics. (Q2 13/14)
21
4b Strategy Development Topics
- Site Restoration
ROADMAP
Strategic estate-wide view
of implementation plans
Performance indicators
Strategic Tolerances and
Dashboards
·
·
·
·
Issues, risks and
opportunities
External influences
Policy changes
Stakeholder views
Regulatory changes
Other
LTP’s
SLC Decision
Calendar
Critical Enablers
Strategy
Development
Work Plan
NDA’s Integrated Strategy Development
Workplan
Alternative Strategic futures
Estate-wide strategic coordination
Site Restoration
Strategy
Development
Work Plan
IWM
Strategy
Development
Work Plan
Strategic Decision
Calendar
SF&NM
Strategy
Development
Work Plan
Revised NDA Strategy, Guidance and Client Specifications
22
Deliverables in 2013/14 - DRAFT
- Site Restoration
Site Restoration
21.0 Op Plan Target N057:
- Publish NDA perspective of opportunities for re-use of NDA land in the short
term, and credible longer term uses of NDA Land. (Q4 - 12/13)
- Publish practitioners guide to proposing preferred Site Interim and End
States within context of agreed approach to institutional controls. (Q3 –
13/14)
- NDA completed review of proposed site interim and end states for inclusion
in Lifetime Plans. (Q? 14/15)
- NDA approval of site interim and end states for inclusion in Lifetime Plans.
(Q? 14/15)
22.0 Op Plan Target N089. Specification for Magnox Competition:
- Final Magnox/RSRL Client Specification issued to support final invitation to
submit final tenders. (Q2 13/14)
23.0 Publish Site Restoration Roadmap. (Q4 13/14)
24.0 Publish strategic position on the optimal period of quiescence for Magnox
reactors. (Q4 13/14)
23
Strategy Development Topics
- Integrated Waste Management
ROADMAP
Strategic estate-wide view
of implementation plans
Performance indicators
Strategic Tolerances and
Dashboards
·
·
·
·
Issues, risks and
opportunities
External influences
Policy changes
Stakeholder views
Regulatory changes
Other
LTP’s
SLC Decision
Calendar
Critical Enablers
Strategy
Development
Work Plan
NDA’s Integrated Strategy Development
Workplan
Alternative Strategic futures
Estate-wide strategic coordination
Site Restoration
Strategy
Development
Work Plan
IWM
Strategy
Development
Work Plan
Strategic Decision
Calendar
SF&NM
Strategy
Development
Work Plan
Revised NDA Strategy, Guidance and Client Specifications
24
Deliverables in 2013/14 - DRAFT
- Integrated Waste Management
IWM
12.0 Op plan Target N107: Development of an “national” plan for the treatment
and storage of alpha contaminated wastes. (Q4 13/14)
13.0 Op plan Target N083: Develop a national co-location and waste
consolidation preferred strategic position for the treatment and storage of
higher activity wastes (12/13). – then develop a national implementation plan
(timing TBC 13/14).
14.0 Support to HMG on a co-ordinated UK approach to Higher Activity Waste
Strategy. (Q4 13/14)
15.0 Investigate decision criteria for near surface disposal of radioactive waste.
(TBC 13/14)
- Decision criteria for HAW in Scotland.
- Consider wider implication for radioactive management across UK.
16.0 Consider implication of Scottish HAW Policy on GDF inventory. (Q2 13/14)
17.0 Achieve implementation of special measures on FGMSP. (? TBC)
25
4d Strategy Development Topics
- Critical Enablers and Bus. Optimisation
ROADMAP
Strategic estate-wide view
of implementation plans
Performance indicators
Strategic Tolerances and
Dashboards
·
·
·
·
Issues, risks and
opportunities
External influences
Policy changes
Stakeholder views
Regulatory changes
Other
LTP’s
SLC Decision
Calendar
Critical Enablers
Strategy
Development
Work Plan
NDA’s Integrated Strategy Development
Workplan
Alternative Strategic futures
Estate-wide strategic coordination
Site Restoration
Strategy
Development
Work Plan
IWM
Strategy
Development
Work Plan
Strategic Decision
Calendar
SF&NM
Strategy
Development
Work Plan
Revised NDA Strategy, Guidance and Client Specifications
26
Deliverables in 2013/14 - DRAFT
- Critical Enablers and Bus. Optimisation
R&D
18.0 Op Plan Target N080: Publish the 2013 UK Radioactive Waste Inventory.
(Q4 13/14)
19.0 Publish NDA directly funded 5 year R&D programme. (Q3 13/14)
19.0 Carry out new improved style of project technical assurance reviews: (TBC
13/14)
- SDP
- UFCF.
MOD
25.0 Agree Decommissioning Planning Service Scope for VDAD. (Q2 13/14)
26.0 Support MOD in decision making on SDP. (Q2 13/14)
27
Immediate Strategy Development
Next Steps - 3 Months
– Finalise 13/14 targets and create an integrated strategy
development workplan for use at SDIG and TOGs.
– Commission work to create a Site Restoration Roadmap.
– Report progress against the strategy development workplan.
– Use strategic tolerances and dashboards to discuss strategy
implementation
– Critical enablers TOG – make it work.
28
Download