EU TURKISH COOPERATION ON RIVER BASIN MANAGEMENT PLANNING EU ACCESSION PROCESS IN TURKEY Nermin ÇİÇEK, Head of Basin Management Planning Department, Ministry of Forestry and Water Affairs, General Directorate of Water Management 15 March, 2012, Venue: PEu 4 Turkey’s water challenge Estimated national water body status, 2009 100% 80% 60% High Good Moderate 40% Poor 20% Bad 0% NEGOTIATION PROCESS FOR THE CHAPTER ON ENVIRONMENT 3 Turkey as EU candidate member During the presidency of Sweden, the negotiations for the Chapter on Environment was officially opened at the “Intergovernmental Accession Conference” which took place in Brussel, December 21st, 2009. 4 SCREENING MEETINGS The Ministry of Environment and Forestry is the competent authority for the National Programme and the EU Environment Legislation alignment works. The screening meetings for the chapter on environment were completed in 2006. Screening was approved by the European Council, upon the opinions of the Member States. The conclusions of screening were officially notified to Turkey on the 3rd of October 2007 via an official letter under the Portuguese Presidency. The results included two opening criteria. The preparation of a comprehensive strategy including the stages and timetables for the alignment and implementation of the acquis, and to eanble an efficient implementation. Fulfilment of the requirements of related EU Environmental Legislation, in accordance with EC-Turkey Association Council (Customs Union) 5 WORKS UNDERTAKEN For the meeting of opening criteria: Implementation notes have been prepared for 5 EU Environmental Legislation under the scope of the Customs Union: Dangerous Chemicals Directive, Experimental Animals Directive, Packaging and Packaging Waste Directive, Directive on the Quality of Petrol and Diesel Fuels, Directive on the Sulphur Content of some fuels 6 WORKS UNDERTAKEN For the fulfilment of the opening criteria: A strategy document of 400 pages has been prepared for 69 EU legislation with the contribution of related institutes and institutions under the coordination of our ministry. The strategy document includes 9 sectors: Industrial Pollution Control Horizontal legislation, and risk management, Air quality, Chemicals management , Waste management, Genetically modified Water sector, organisms, Nature protection, Noise management 7 WORKS UNDERTAKEN During the presidency of Sweden, the negotiations for the Chapter on Environment was officially opened at the “Intergovernmental Accession Conference” which took place in Brussel, December 21st, 2009. Thus, the number of chapters opened for negotiations has increased to 12 (including the chapter on environment) within the Turkey-EU Accession Negotiations. 8 CLOSING CRITERIA 6 closing criteria has been defined for the closure of negotiations of the chapter on environment in the ‘Common Negotiation Position Paper’ of the European Union prepared in response to the ‘Negotiation Position Paper of Turkey’. 9 CLOSING CRITERIA Adoption of the horizontal legislation and framework environmental acquis of the European Union Improvement as a result of adoption of the environmental acquis of the EU on the water sector. Preparation of River Basin Management Plans. Adoption of the environmental acquis on industrial pollution and risk management. Continuance of compliance to the acquis in the rest of the sectors, including nature conservation and waste management; and proving that all the requirements of the EU are met on the date of accession. Continuance with the improvement of administrative capacity and coordination, including inspection services. Fulfilling the obligations of the additional protocol. 10 Closing benchmarks Two closing benchmarks for water: Transposition of WFD River basin management plans for 25 river basins Harmonization of WFD Revising the existing New legislation* legislation Environmental Law/By-Law on Water Pollution Control • Water Law* • By-law on River Basin protection (Draft)* ORGANIZATION River basins in Turkey Dicle - Waste Water Treatment Action Plan River Basin Protection Action Plans River Basin Management Plans MINISTRY OF ENVİRONMENT AND FORESTRY DG Environment Management MINISTRY OF ENVİRONMENT AND FORESTRY DG Environment Management Büyük Menderes RBMP Akarçay RBPAP WWTAP 15 BASIN PROTECTION ACTION PLANS Started in the last quarter of 2011 Will be revised Will be finished Basin Protection Action Plans are being prepared. 11 basins are completed, 5 basins are being updated, 9 basins are started. They will set basis for the River Basin Management Plans which will be prepared in the context of Water Framework Directive. 16 EXAMPLE ERGENE RIVER BASIN Dicle - IPA-2011 Project on the Conversion of River Basin Protection Action Plans into River Basin Management Plans Budget : 6.600.000 Euro Duration : 3 years Beneficiary : Ministry of Forestry and Water Affairs Purpose : Meriç Basin, Susurluk Basin, Akarçay Basin, Büyük Menderes Basin and Konya Closed Basin DETERMINATION OF SPECIAL PROVISION STUDIES IN TURKEY COMPLETED CONTINUED UNDER CONTRACT PROCESS PLANNED Determination of Special Provision studies are being conducted for the protection of drinking water basins. WATER FOOTPRINT STUDIES IN TURKEY TRAINING WITH CERTIFICATE IS CARRIED OUT BY THE COORDINATION OF WWF AND GENERAL DIRECTORATE OF WATER MANAGEMENT WATER EFFICIENCY We are struggling with water loss and leakage, developing standards, passing to certificate phase. STUDIES FOR REUSE OF TREATED DOMESTIC WASTEWATER IN IRRIGATION Important steps for the reuse of treated domestic wastewater. The project (750.000 Euro) is being started with Afyonkarahisar Municipality under the scope of Holland bilateral cooperation studies. Project titled “Capacity Building on Water Quality Monitoring” was submitted to the Component I of IPA for the Programming Year 2009. UNDER THE SCOPE OF 4.000.000 EURO EU TWINNING PROJECT IN BÜYÜKMENDERES ERGENE SUSURLUK SAKARYA AKARÇAY BASINS DETERMINATION OF MEASURING STATIONS, PARAMETERS WHICH WILL BE MEASURED AND MEASUREMENT INTERVALS WE ARE PROVIDING BASIN WIDE TRAININGS 39 persons are received certificate in Training of Trainers Project. 60 persons are received certificate in Water Footprint Training Basin management training is given to municipalities. NGO pool is formed. TAIEX application about water economy is confirmed. Negotiation training is done. 22 TIME TABLE Action Year Remarks 1 Designation of River Basin Districts 2012 25 basins have already been defined. 2 Start preparing the Article 5 Reports for River Basins After 2013 River Basin Protection Action Plans (RBPAP) will set the basis for Article 5 reports 3 Start preparing the river basin management plans After 2013 4 Start of implementation of river basin management plans After 2015 5 Achievement of “good water status” 2027 Depends on the actual challenges in the basins. RBMP TIME TABLE 2027(EU) 2033 4. RBMP 2021(EU) 2027 3. RBMP 2015(EU) 2021 2009(EU)2 015 2. RBMP 1. RBMP TURKEY Many Member States will achieve good status at this date Exemptions Implementation dates foreseen by the Directive concentration of tasks at national level policy making and -implementation integrated policy making and -implementation separated concentration of tasks at regional level MERCI / THANK YOU worldwaterforum6.org solutionsforwater.org