Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection Major Components Infiltration Trench 1. 2. 3. 4. 5. 6. Diversion for WQv Stilling pool and spreader Sedimentation channel or chamber Overflow weir or protective covering layer Infiltration trench with gravel Overflow & outlet Pavement edges < 5 acres drainage ≤ 2 day drawdown No hotspot application 2-4 feet to water table – close may need to do mounding computation Setbacks for groundwater protection WQv diverted into trench Design Steps 1. 2. 3. 4. 5. 6. 7. 8. Compute WQv and if applicable Cpv Screen site Screen local criteria Compute Qwq Size diversion Size filtration area Size pretreatment area Size overflow 24-48 hour drawdown Fill time estimate of 2 hours is normal Porosity = 0.32 If pretreatment facility size for 25% WQv Gravel Trench Volume A = WQv/(nd+kT/12) = WQv/(0.32d+k/6) n=0.32 d=depth in feet k=percolation rate (in/hr) T = fill time = 2 hrs. Gravel Trench Area Per Acre 9000 Percent Impervious Surface Area - sq ft 8000 0 7000 20 6000 40 5000 60 80 4000 100 3000 2000 1000 0 0 2 k=1 in/hr (sandy loam), n=0.32, T=2 hrs 4 6 Trench Depth - ft 8 10 12 Erosion & Sediment Control Considerations Ensure sediment is trapped before entering filter area Installation sequencing is important – After adjacent areas are stabilized – Converted temporary sediment basins (Sd3) Provide pretreatment with sediment basin or filter strip An example of Infiltration trench design Taken from Appendix D4 Calculated Volumes…. Step 1. Determine if the site conditions are appropriate Step 1. Determine if the site conditions are appropriate Step 2. Calculate WQv peak discharge (Qwq) WQv = 8102 cf, P = 1.2”, Qwv = WQv/Area = 0.74” CN = 95…Ia=(1000/CN-10)…Ia/P…qu…Qwq 1. Back out curve number ½ C N = 1 0 0 0 /[1 0 + 5 P +1 0 Q w v - 1 0 (Q w v ² + 1 .2 5 Q w v P ) ] 2. 3. Calculate unit peak discharge using SCS simplified peak figures Calculate peak discharge as: Q wq = qu * A * Q wv Qwq = 2.2 cfs Step 3. Size the infiltration trench A = WQv/(nd+kT/12) = WQv/(0.32d+k/6) n=porosity d=depth in feet k=percolation rate (in/hr) T = fill time n=0.32 D= 5 feet k=1 (in/hr) T = 2 hrs. A= 8,102 (32.2x5)+(1x2/12) A = 4,586 sf Max. width = 25 ft L = 4,586/25 = 183 ft Step 3. Size Point A flow diversion structure Q25 = 17cfs, WQv = 2.2 cfs 2/3 of the flow to Point A (1/3 to Point B) Point A: Q25 = 5.7cfs, WQv = 0.73 cfs Design orifice for low flow (0.73 cfs) Set max. head = 1.5’ Q=CA(2gh)1/2…C=0.6…A=0.12 sf (4”dia.) …use 6-inch pipe w/ gate valve Step 3. Size Point A flow diversion structure Q25 = 17cfs, WQv = 2.2 cfs 2/3 of the flow to Point A (1/3 to Point B) Point A: Q25 = 5.7cfs, WQv = 0.73 cfs Design weir for 25-yr flow (5.7 – 0.73 = 5cfs) Set max. head = 1.0’ Q=CLH3/2…C = 3.1…L=1.6 ft Coastal Challenges… Challenges Associated with Using Infiltration in Coastal GA See Handouts for LID Practices… Site Characteristic Poorly drained soils, such as hydrologic soil group C and D soils How it Influences the Use of Infiltration Practices Infiltration practices cannot be used on development sites that have soils with infiltration rates of less than 0.5 inches per hour (e.g. hydrologic soil group C and D soils). Potential Solutions Use other low impact development and stormwater management practices, such as stormwater ponds (Section 8.4.1) and stormwater wetlands (Section 8.4.2) and underdrained bioretention areas (Section 8.4.3)… Coastal Challenges… Challenges Associated with Using Infiltration in Coastal GA See Handouts for LID Practices… How it Influences the Site Use Potential Solutions Characteristic of Infiltration Practices Well drained Enhances the ability of Use bioretention areas soils, such as infiltration practices to (Section 8.4.3) or filtration hydrologic soil reduce stormwater runoff practices (Section 8.4.4) group A and B rates, volumes and with liners and underdrains soils pollutant loads, but may at hotspot facilities and in allow stormwater areas with groundwater pollutants to reach recharge. groundwater aquifers with In areas w/o groundwater greater ease. recharge, use infiltration practices and nonunderdrained bioretention areas (Section 8.4.3) Coastal Challenges… Challenges Associated with Using Infiltration in Coastal GA See Handouts for LID Practices… How it Influences the Site Use Potential Solutions Characteristic of Infiltration Practices Flat terrain Does not influence the use Where soils are sufficiently of infiltration practices on permeable, use infiltration development and practices and nonredevelopment sites. In underdrained bioretention fact, infiltration practices areas (Section 8.4.3), to should be designed with significantly reduce slopes that are as close to stormwater runoff volumes flat as possible. in these areas. Coastal Challenges… Challenges Associated with Using Infiltration in Coastal GA See Handouts for LID Practices… How it Influences the Site Use Potential Solutions Characteristic of Infiltration Practices Shallow water May cause stormwater Ensure at least 2 feet to table runoff to pond in the the water table… bottom of the infiltration Use stormwater ponds practice. (Section 8.4.1), stormwater wetlands (Section 8.4.2) and wet swales (Section 8.4.6)... Maximize the use of green infrastructure… Coastal Challenges… Challenges Associated with Using Infiltration in Coastal GA See Handouts for LID Practices… How it Influences the Use Site Potential Solutions Characteristic of Infiltration Practices TidallyDoes not influence the influenced use of infiltration drainage practices on development system and redevelopment sites. CSS Design Credits 7.4 Better Site Planning Techniques 7.5 Better Site Design Techniques 7.6 LID Practice 8.4 General Application BMPs CSS Design Credits Table 6.5: How Stormwater Management Practices Can Be Used to Help Satisfy the Stormwater Management Criteria Stormwater Runoff Reduction Stormwater Management Practice Water Quality Protection Aquatic Resource Protection Overbank Flood Protection “Credit”: None “Credit”: Assume that a stormwater pond provides an 80% reduction in TSS loads, a 30% reduction in TN loads and a 70% reduction in bacteria loads. “Credit”: A stormwater pond can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv). “Credit”: A stormwater pond can be designed to attenuate the overbank peak discharge (Qp25) on a development site. “Credit”: A stormwater pond can be designed to attenuate the extreme peak discharge (Qp100) on a development site. “Credit”: None “Credit”: Assume that a stormwater wetland provides an 80% reduction in TSS loads, a 30% reduction in TN loads and a 70% reduction in bacteria loads. “Credit”: A stormwater wetland can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv). “Credit”: A stormwater wetland can be designed to attenuate the overbank peak discharge (Qp25) on a development site. “Credit”: A stormwater wetland can be designed to attenuate the extreme peak discharge (Qp100) on a development site. “Credit”: Subtract 100% of the storage volume provided by a non-underdrained bioretention area from the runoff reduction volume (RRv) conveyed through the bioretention area. “Credit”: Assume that a bioretention area provides an 80% reduction in TSS loads, an 80% reduction in TN loads and a 90% reduction in bacteria loads. “Credit”: Although uncommon, on some development sites, a bioretention area can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv). “Credit”: Although uncommon, on some development sites, a bioretention area can be designed to attenuate the overbank peak discharge (Qp25). “Credit”: Although uncommon, on some development sites, a bioretention area can be designed to attenuate the extreme peak discharge (Qp100). Extreme Flood Protection General Application Practices Stormwater Ponds Stormwater Wetlands Bioretention Areas, No Underdrain