Module 5: Bioretention Design Specs Details

advertisement

Module 5: Bioretention Design Specs/Details

Melanie Mills, MLA

Central Coast LIDI

Specifications & Standard Details

100

Standard Details Design Specifications

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without overflow bypass, Detail

140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, IE). See Detail 120.

3. Edge condition will vary for new and retrofit projects. Curb details may be modified for project by civil and geotechnical engineers.

4. If check dams are needed, see Concrete Check Dam Detail 131.

5. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

6. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or Bioretention Facilities.

7. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical

Assistance Memo (TAM).

8. Mulch (optional) per LIDI Plant Guidance for Bioretention Areas TAM. Grading to allow for specified soil and mulch depths while achieving finished elevations per civil plans.

9. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, allow to dry overnight before planting.

3. Never work within bioretention area limits during rain or under wet conditions.

4. Keep all heavy machinery outside bioretention area limits.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS detail number

Municipality

Department Name

Bioretention Area

Planter

100

Design Guidance Review

Expert Panel Review

DRAFT

Low Impa ct Development Initia tive (LIDI)

Bioretention Area Design Specifica tions (without underdra in)

Text in blue represents changes based on group comments.

Highlighted text indicates items related to discussion topics.

Facility Design/Dimensions

Develop narrative for each section?

Bottom width – provide 2’ wide minimum flat bottom for facilities with side slopes and longitudinal slope

Drawdown time – 72 hours.

– Drawdown time is typically associated with mosquito vector control, and varies by location. Confirm with local vector control agency to confirm appropriate drawdown time for facility.

Energy dissipation – provide an aggregate or concrete splash pad at inlet per

LIDI details.

– For aggregate: 6” depth, 3" – 6" rounded, washed cobble (CalTrans Class 2 or

3 Permeable)

– For sloped sided facilities, extend a cobble flow path from pad 1’ into bioretention area bottom.

Planter minimum widths are typically associated with their application.

Considerations influencing minimum widths include:

3’ minimum for planters in ROW with trees

– 2’ minimum for planters without trees

Planter depth – (from pedestrian surface to top of facility planting surface) is related to planter width. Planters can be deeper as they get wider, and need to be shallower as they narrow. This is a perception and safety issue.

Recommended ratios are:

– Need further input. Will provide a table with width/depth or bulleted guidelines.

Ponding depth - Min. 6", max. 12"

Slope/grades

– Side slope - 4:1 preferred

· Max. 3:1 allowed with 12" shoulder (2% slope) adjacent to pedestrian use or curb

– Longitudinal slope – Max. 6% longitudinal slope of bottom.

9/16/12 page 1/3

Design Specifications

• Facility Design and Dimensions

– width, depth, slope, ponding

• Hard Infrastructure

– inlets, check dams, overflow structures

• Facility Media

– soil, aggregate base, mulch

• Landscape

– plant selection, irrigation

Standard Details

• Facility Type

– planter

– sloped sided

• Elements related to facility

– walls

– curb inlets

– overflows

– check dams

100

Standard

Details

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without overflow bypass, Detail

140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, IE). See Detail 120.

3. Edge condition will vary for new and retrofit projects. Curb details may be modified for project by civil and geotechnical engineers.

4. If check dams are needed, see Concrete Check Dam Detail 131.

5. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

6. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or Bioretention Facilities.

7. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical

Assistance Memo (TAM).

8. Mulch (optional) per LIDI Plant Guidance for Bioretention Areas TAM. Grading to allow for specified soil and mulch depths while achieving finished elevations per civil plans.

9. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, allow to dry overnight before planting.

3. Never work within bioretention area limits during rain or under wet conditions.

4. Keep all heavy machinery outside bioretention area limits.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS detail number

Municipality

Department Name

Bioretention Area

Planter

100

Facility Design & Dimensions

• Bottom width – provide 2’ wide minimum flat bottom for facilities with side slopes and longitudinal slope

• Allowable standing water – 72 hours.

Allowable ponding time is typically associated with mosquito vector control, and varies by location. Confirm with local vector control agency to confirm appropriate drawdown time for facility.

• Energy dissipation – provide an aggregate or concrete splash pad at inlet per LIDI details.

– For aggregate: 6” depth, 3" – 6" rounded, washed cobble

– For sloped sided facilities, extend a cobble flow path from pad 1’ into bioretention area bottom.

100

Bioretention w/ Flat Bottom (Planter)

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without overflow bypass, Detail

140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, IE). See Detail 120.

3. Edge condition will vary for new and retrofit projects. Curb details may be modified for project by civil and geotechnical engineers.

4. If check dams are needed, see Concrete Check Dam Detail 131.

5. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

6. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or Bioretention Facilities.

7. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical

Assistance Memo (TAM).

8. Mulch (optional) per LIDI Plant Guidance for Bioretention Areas TAM. Grading to allow for specified soil and mulch depths while achieving finished elevations per civil plans.

9. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, allow to dry overnight before planting.

3. Never work within bioretention area limits during rain or under wet conditions.

4. Keep all heavy machinery outside bioretention area limits.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS detail number

Municipality

Department Name

Bioretention Area

Planter

100

Bioretention w/ Sloped Sides

(rain garden, linear swale)

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without overflow bypass, Detail 140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, SIE). See Details 121, 122.

3. Max. longitudinal slope 6% with check dams. See details 130, 131.

4. Edge condition will vary for new and retrofit projects. Curb, wall, and sidewalk details may be modified for project by civil and geotechnical engineers.

5. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

6. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or

Bioretention Facilities.

7. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical Assistance

Memo.

8. Mulch (optional) per LIDI Plant Guidance for Bioretention Areas TAM. Grading to allow for specified soil and mulch depths while achieving finished elevations per civil plans.

9. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, allow to dry overnight before planting.

3. Never work within bioretention area limits during rain or under wet conditions.

4. Keep all heavy machinery outside bioretention area limits.

detail number

Bioretention Area w/ Side Slope

Municipality

Department Name

(rain garden or swale)

101

Side Slope Grades

• 3:1 max

– needs shoulder

• 4:1 recommended

Bioretention w/ Sloped Sides

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without overflow bypass, Detail 140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, SIE). See Details 121, 122.

3. Max. longitudinal slope 6% with check dams. See details 130, 131.

4. Edge condition will vary for new and retrofit projects. Curb, wall, and sidewalk details may be modified for project by civil and geotechnical engineers.

5. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

6. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or

Bioretention Facilities.

7. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical Assistance

Memo.

8. Mulch (optional) per LIDI Plant Guidance for Bioretention Areas TAM. Grading to allow for specified soil and mulch depths while achieving finished elevations per civil plans.

9. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, allow to dry overnight before planting.

3. Never work within bioretention area limits during rain or under wet conditions.

4. Keep all heavy machinery outside bioretention area limits.

detail number

Bioretention Area w/ Side Slope

Municipality

Department Name

(rain garden or swale)

101

Facility Elevations

• Overflow elevation

• Curb gutter inlet elevation

• Top of curb

• Adjacent surface

• Finished grade in facility

Bioretention w/

Underdrain

Planter

• Class 2 permeable

• No filter fabric

• No filter layer

• Underdrain

– PVC SDR 35

– holes downward

– cleanout

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without overflow bypass, Detail 140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, IE). See Detail 120.

3. Edge condition will vary for new and retrofit projects. Curb details may be modified for project by civil and geotechnical engineers.

4. Provide capped, threaded PVC cleanout for underdrain, 4" min. dia. with sweep bend.

5. If check dams are needed, see Concrete Check Dam Detail 131.

6. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

7. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or

Bioretention Facilities.

8. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical

Assistance Memo (TAM).

9. Mulch (optional) per LIDI Plant Guidance for Bioretention Areas TAM. When used, excavate to allow for specified soil and mulch depths and achieve finished elevations as shown on plans.

10. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Install underdrain with holes facing down.

Underdrain discharge elevation shall be near top of aggregate layer. Underdrain slope may be flat.

3. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, let dry overnight before planting.

4. Never work within bioretention area limits during rain or under wet conditions.

5. Keep all heavy machinery outside bioretention area limits.

detail number

Bioretention Area

Municipality

Department Name

Planter w/ Underdrain

DRAFT

102

Bioretention w/

Underdrain

Side Slope

• Underdrain design considerations

– design w/ future modification

– adjustable orifice

– open/close drain

BIORETENTION DESIGN NOTES

1. Overflow structure required for in-line systems without an overflow bypass, Detail 140.

2. Provide spot elevations on civil plans (TBSM, OE, GIE, SIE). See inlet details 121, 122.

3. Max. longitudinal slope 6% with check dams. See details 130, 131.

4. Edge condition will vary for new and retrofit projects. Curb, wall, and sidewalk details may be modified for project by civil and geotechnical engineers.

5. If Caltrans Class 2 Permeable is not available, substitute Class 3 Permeable with an overlying 3" deep layer of 3/4" (No. 4) open-graded aggregate.

6. Bioretention Soil Media (BSM) specification per BASMAA Soils for Biotreatment or

Bioretention Facilities.

7. Plant Selection per LIDI Plant Guidance for Bioretention Areas Technical Assistance

Memo.

8. Mulch (optional) type/depth per LIDI Plant Guidance for Bioretention Areas TAM. Grades to allow for specified soil and mulch depths while achieving finished elevations per civil plans.

9. Locate energy dissipation cobble only as specified in inlet details - avoid decorative use.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

CONSTRUCTION NOTES

1. Scarify subgrade before installing bioretention area aggregate and BSM.

2. Install underdrain with holes facing down.

Underdrain discharge elevation shall be near top of aggregate layer. Underdrain slope may be flat.

3. Compact each 6" lift of BSM with landscape roller or by lightly wetting. If wetting, let dry overnight before planting.

4. Never work within bioretention area limits during rain or under wet conditions.

5. Keep all heavy machinery outside bioretention area limits.

detail number

Bioretention w/ Side Slope and

Municipality

Department Name

Underdrain

DRAFT

103

Design Specifications

• Hard Infrastructure

Edge

Infrastructure

BIORETENTION DESIGN NOTES

1. Special design consideration or structural review may be required for longer swale edge spans. Steel reinforcement or additional concrete check dams may be needed for stability.

2. When sidewalk drains to planter, provide 6" wide notch openings spaced to convey flows.

3. Concrete and expansion joints shall meet the requirements of the municipality.

CONSTRUCTION NOTES

1. Finish all exposed concrete surfaces.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Deep Curb

Municipality

Department Name detail number

111

Edge

Infrastructure for Sloped

Sides

BIORETENTION DESIGN NOTES

1. Special design consideration or structural review may be required for longer swale edge spans. Steel reinforcement or additional concrete check dams may be needed for stability.

2. Concrete and expansion joints shall meet the requirements of the municipality.

CONSTRUCTION NOTES

1. Finish all exposed concrete surfaces.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Thickened Edge Sidewalk

Municipality

Department Name detail number

112

Curb Cut Inlets for Planters

A

• Inlet design has evolved

PLAN VIEW

A

PERSPECTIVE VIEW

SECTION A-A

BIORETENTION DESIGN NOTES

1. For use with stormwater facilities with flat bottoms.

2. Provide spot elevations on plans (TBSM, OE,

GIE, IE). See Detail 100.

3. Refer to municipal standard drawings and match gutter pan of adjacent curb and gutter.

CONSTRUCTION NOTES

1. After construction place sand bags at gutter openings to keep storm flows from entering facility until vegetation is established.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Curb Cut Inlet for Planters

Municipality

Department Name detail number

120

Concrete Splash Pad

Curb Cut Inlets for Sloped

Sides

A A

PERSPECTIVE VIEW

PLAN VIEW

SECTION A-A

BIORETENTION DESIGN NOTES

1. For use with stormwater facilities with side slopes.

2. Provide spot elevations on plans (TBSM,

OE, GIE, IE). See Detail 100.

3. Refer to municipal standard drawings and match gutter pan of adjacent curb and gutter.

CONSTRUCTION NOTES

1. After construction place sand bags at gutter openings to keep storm flows from entering facility until vegetation is established.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Curb Cut Inlet for Side Slopes

(rain garden or swale)

Municipality

Department Name detail number

121

Curb Cut Inlets

122

w/ Gravel

A A

SECTION A-A

PLAN VIEW

BIORETENTION DESIGN NOTES

1. For use with stormwater facilities with sloped sides or flat bottoms.

2. Provide spot elevations on plans (TBSM,

OE, GIE, IE). See Details 100, 101.

3. Drop from inlet to aggregate pad will be greater for planters.

4. Refer to municipal standard drawings and match gutter pan of adjacent curb and gutter.

CONSTRUCTION NOTES

1. After construction place sand bags at gutter openings to keep storm flows from entering facility until vegetation is established.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Curb Cut Inlet with Gravel Energy Dissipation

Municipality

Department Name detail number

122

Energy Dissipation Cobble

• Use it for energy dissipation

– at inlets

– sloped sides/extend down to facility bottom

• Avoid decorative use

– difficult to maintain

– weeds can establish in sediment/cobble

Inlet w/ Grate

A

B

B

PLAN VIEW

A

GRATE AND FRAME

SECTION B-B

BIORETENTION DESIGN NOTES

1. For use with stormwater facilities with sloped sides or flat bottoms.

2. Provide spot elevations on plans (TBSM, OE, GIE, IPE). See Details 100, 101.

3. Refer to municipal standard drawings and match gutter pan of adjacent curb and gutter.

4. If sloped sides, extend cobble from splash pad 1' into bottom of facility.

5. Base material for curb, gutter, and sidewalk per municipal standards.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

SECTION A-A

CONSTRUCTION NOTES

1. After construction place sand bags at gutter openings to keep storm flows from entering facility until vegetation is established.

detail number

Inlet with Grate

123

Municipality

Department Name

Gravel Check

Dam

• Mild longitudinal slope

A

A

SECTION A-A

BIORETENTION DESIGN NOTES

1. For use with stormwater facilities with sloped sides.

2. Best suited for facilities with > 2% longitudinal slope.

3. Provide elevations and stationing and/or dimensioning for check dams.

4. Space check dams per detail 132.

5. Ensure that check dam elevations do not cause stormwater to overflow to sidewalk.

CONSTRUCTION NOTES

1. Do not work during rain or under wet conditions.

2. Keep all heavy machinery outside bioretention area limits.

detail number LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Gravel Check Dam

Municipality

Department Name

130

Concrete

Check Dam

BIORETENTION DESIGN NOTES

1. For use with bioretention planters or sloped sided swales/rain gardens.

2. For check dams longer than 12' specify rebar overlap length.

3. Space check dams per detail 132.

4. Provide elevations and stationing and/or dimensioning for check dams.

5. Ensure that check dam elevations do not cause stormwater to overflow to sidewalk.

6. Show planter wall embedded in existing subgrade or drainrock.

CONSTRUCTION NOTES

1. Embed #3 rebar 3" into curb and planter wall.

2. Do not work during rain or under wet conditions.

3. Keep all heavy machinery outside bioretention area limits.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS detail number

Concrete Check Dam

131

Municipality

Department Name

Concrete Check Dams

• Work w/ steep longitudinal slope

• Series of bathtubs

Check Dams

• Other rigid materials

– steel

– clear plexiglass

– concrete w/ wood

Overflow

Structure w/

Beehive Grate

140

• Required for systems without overflow bypass

• Overflow raised to allow ponding

• Connects to downstream structure or stormdrain

BIORETENTION DESIGN NOTES

1. Provide grate overflow elevation on plans.

2. To incorporate flexibility into design overflow elevation or correct elevation of an existing structure, install overflow collar, per detail 141.

CONSTRUCTION NOTES

1.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Overflow Structure w/ Beehive Grate

Municipality

Department Name detail number

140

Overflow

Structure w/

Collar

BIORETENTION DESIGN NOTES

1. Provide collar overflow elevation (COE) on plans.

CONSTRUCTION NOTES

1. Center collar on overflow grate.

LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS

Overflow Structure

Collar

Municipality

Department Name detail number

141

Location of Overflow

• Not adjacent to inlet

• Raised to allow for design ponding

TOP

10

Design

Specifications

• Facility Media

• Landscape

Aggregate

• Optional use – per project requirements

• Cal Trans Class 2 Permeable

• No filter fabric

– potential for clogging

– inhibits infiltration

• Aggregate filter layer not needed for Class 2

• If Class 2 not available, substitute Class 3

– provide 3” depth filter layer for Class 3

Future Standard Details

• Layout details for bioretention

– street edge with parking

– curb extensions

– bioretention with pedestrian crossing

– parking lot layouts

www.centralcoastlidi.org

Download