LEAN PRODUCTION Operations Management Ron Lembke Waste Waste is ‘anything other than the minimum amount of equipment, materials, parts, space, and workers’ time which are absolutely essential to add value to the product. --Shoichiro Toyoda, Chairman, Toyota Motor Co., 1992-99 If you put your mind to it, you can squeeze water from a dry towel. -- Eiji Toyoda, President 1967-1982 Just-in-Time Downstream processes take parts from upstream as they need. Like an American Supermarket: Get what you want when you want it in the quantity you want. 7 Types of Waste (Ohno 1988) Overproduction Time on Hand (waiting time) Transportation Stock on Hand - Inventory Waste of Processing itself Movement Making Defective Products Seven Elements to Eliminate Waste 1. 2. 3. 4. 5. 6. 7. Focused Factories Group Technology Quality at the Source JIT production Uniform Plant Loading Kanban production control system Minimized setup times 1. Focused Factories Small, specialized plants No huge, vertically integrated plants Small plants easier, cheaper to build Tom Peters, “The Pursuit of Wow.” Group size of 150 Know everyone else in the group 2. Group Technology Products grouped into families Benefits Work cell can produce whole family Cellular layout, not functional Much less inventory sitting around Less material movement Fewer workers Cross-training Keep skills sharp (managers too) Reduce boredom & fatigue Understand overall picture, more new ideas 3. Quality at the Source Do it right the first time Stop process, correct errors immediately Not a lot of parts to sift through to find a good one Can’t afford high defect rates Since low WIP, get quick feedback on errors Lowering Inventory Reduces Waste WIP hides problems Lowering Inventory Reduces Waste WIP hides problems Lowering Inventory Reduces Waste Reducing WIP makes problem very visible STOP Lowering Inventory Reduces Waste Remove problem, run With less WIP Lowering Inventory Reduces Waste Reduce WIP again to find new problems Performance and WIP Level Less WIP means products go through system faster reducing the WIP makes you more sensitive to problems, helps you find problems faster Stream and Rocks analogy: Inventory (WIP) is like water in a stream It hides the rocks Rocks force you to keep a lot of water (WIP) in the stream 4. Just In Time-- What is It? Just-in-Time: produce the right parts, at the right time, in the right quantity Requires repetitive, not big volume Batch size of one Short transit times, keep 0.1 days of supply 5. Uniform Plant Loading (heijunka) Any changes to final assembly are magnified throughout production process Sequencing: If mix is 50% A, 25% B, 25% C, produce A-B-A-C-A-B-A-C… Takt Time Takt time: Beat or cycle Master production schedule: 10,000 /mo. 500 day, 250 a shift 480 minutes means 1 every 1.92 minutes 6. Kanban Japanese for ‘signboard’ Method for implementing JIT In order to produce, you need both: material to work on, and an available kanban. Each work station has a fixed # kanbans. 6. Kanban Flow of work 1 2 3 Worker 2 finishes a part, outbound moves over 2 has a brown triangle tag available, so 2 gets another part to work on: 2 takes off 1’s blue circle tag giving it back to 1, and puts on her brown triangle tag and moves it into position. 6. Kanban Flow of work 1 2 3 When 3 finishes a part, Finished parts move over one spot He has to have a yellow square tag to put on, He gets a part from 2’s outbound pile, And gives the brown triangle back to 2 6. Kanban – “Pull” Production Flow of work 1 2 When 3 finishes a part, Finished parts move over one spot He has to have a yellow square tag available to put on, He gets a part from 2’s outbound pile, And gives the brown triangle back to 2 3’s production will be taken by 4, offstage right. 3 Tag goes back into 3’s bin End customers pull products through the factory 6. Kanban – “Blocking” 2 Worker #3 finishes his part next. 2 3 3 But customers haven’t freed up any of the yellow square kanbans, so there is nothing for 3 to work on now. 3 could maintain his machine, or see anyone needs help How is this Different? Processes can become idled (blocked) or starved Starved: authorization (kanban card) but no material to work on Blocked: material to work on, but no authorization This makes you painfully aware of problems in your system. Material moves through the system so quickly no inprocess recordkeeping is needed. Importance of Flow Ohno was very clear about this: “Kanban is a tool for realizing just-in-time. For this tool to work fairly well, the process must be managed to flow as much as possible. This is really the basic condition. Other important conditions are leveling the product as much as possible, and always working in accordance with standard work methods. -- Ohno, 1988, p. 3 7. Setup Reduction Can’t afford to do huge runs Have to produce in small batches Toyota Die Change: 3 hours down to 3 SMED: Single Minute Exchange of Dies under ten minutes Techniques Make internal setups into External Eliminate Adjustments Eliminate the Setup Continuous Process Improvement, anyone? Lexus -- the early years First two Toyotas imported to U.S. 1957 Toyopet Crowns Eiji Toyoda’s Ambitious Plans Post-WWII Japanese industry in ruins Early 1950s – toured Rouge plant 2,500 cars in 13 years. Ford: 8,000 per day “Catch up to Americans in 4 years!” Toyoda made delivery trucks and motorcycles, and not many of either Elimination of Waste Knew they wouldn’t beat U.S. with product innovation, concentrated on licensing patents, and producing more efficiently Costs prevented mass-production, volume strategy of American firms. Find ways to reduce waste, cost Shigeo Shingo (at right) & Taiichi Ohno, pioneers Couldn’t Emulate GM GM huge batches in huge factories Japan’s area is 10% less than California and 70% agricultural. Put entire population of CA into 30% of state, then add 6 times as many people. (and you thought LA was crowded). Land extremely expensive Sprawling factories not an option Small Batches GM’s large batches require large amounts of storage space. GM produces in large batches because of significant setup costs. If Toyota had the same large setup costs, it could never afford small batches. Reduce setup cost to reduce batch size. GM didn’t think of doing this. A contrasting opinion “Inventory is not the root of all evil, inventory is the flower of all evil. - Robert Inman, General Motors Ask ‘Why’ 5 Times 5W = 1H 1. Why did the machine stop? Overload and fuse blew 2. 3. 4. 5. Why the overload? Not lubricated Why not lubricated? Oil pump not pumping? Why not pumping? Pump shaft worn out. Why worn out? No screen, scrap got in Preventative Maintenance Unexpected loss of production is fatal to system and must be prevented Additional maintenance can prevent downtime, or minimize length of interruptions, when they do occur Capacity Buffers System is inflexible, no inventory buffers, so to respond, need excess capacity Schedule less than 24 hours per day ‘Two-Shifting’ 4-8-4-8 Cross Training Characteristics of JIT Partnershps Few, nearby suppliers Supplier just like in-house upstream process Long-term contract agreements Steady supply rate Frequent deliveries in small lots Buyer helps suppliers meet quality Suppliers use process control charts Buyer schedules inbound freight Supplier Relationships American model: keep your nose out of my plant. Gain info to force price cuts Lack of trust between suppliers Firm encourages suppliers to share knowledge, because they don’t worry about competing Firm helps supplier increase quality, reduce costs Lessons Learned from JIT The environment can be a control - don’t take setups for granted Operational details are very important (Ford, Carnegie) Controlling WIP is important Flexibility is an asset Quality can come first Continual improvement is necessary for survival