Embracing Change
Public Sector Land
Peter Schofield
Director General, Neighbourhoods, DCLG
Why does the Government Estate matter?
• Source of funding
• Untapped opportunities
• Drives growth
• Boosts housing supply
What is DCLG doing to meet the challenges?
• Reducing our footprint
• Flexible working
• Cross-Government programme to release
surplus land with capacity for 100,000 homes
• New 2015-20 Land
Release Programme
• Local authorities
Ashford
Waltham Forest
• Manning Street redeveloped garage site
Working Together
• One Public Estate programme
• Local and Central
government working
together
• Involving local partners
• Delivering homes, growth and local
priorities
What are the opportunities at local level?
• Cross-boundary, cross-services
• Understanding housing and business need
• Transparency
• Private sector opportunities
• Joined up teams: estates, housing,
planning, economic development
Questions?
?
Government Property Unit
Creating an efficient, fit-for-purpose and sustainable estate
2013 ACES Excellence in Property Management Award
London Estate Rationalisation Team
Presentation: September 2014
Estate rationalisation...
success so far
•
Government exited over
2M sq m, reducing the office
estate by more than 16%
(May 2010 – Sept 2013)
•
Savings on annual running
costs of over £600 million
per annum. (May 2010 – April
2014)
•
Over £1.4billion has been
received in proceeds since
May 2010 from the sale of
nearly 800 parcels of land and
buildings.
This is the equivalent to
the space in all the
buildings below
… Released September 2014 …
Victoria Street, SW1
14
UNCLASSIFIED
21 Bloomsbury Street, WC2
15
UNCLASSIFIED
Organisations needing office space
16
UNCLASSIFIED
A 95%Solution is not a Solution
VACANT
17
UNCLASSIFIED
A 100% Solution
18
UNCLASSIFIED
Credible and Experienced Team
19
UNCLASSIFIED
Shared Facilities
• Break Out and Waiting Space
• Meeting Rooms (SE/UKS/ACE)
• Meeting Rooms (All)
• Showers
• Cycle Parking
• Disabled Drop-Off
• Storage
20
UNCLASSIFIED
Branding
• Building
• Circulation
• Reception and Waiting
• Shared Lower Ground Floor Space
21
UNCLASSIFIED
Shared Services
• Building Management
– Rent
– Service Charge etc.
 Facilities Management
 Meeting Room Booking
 Catering
 Reception
 Security
 Cleaning
 Maintenance
22
UNCLASSIFIED
What happened and Challenges
• What happened
• Challenges
– Fortnightly Client Meetings
– Multiple Fit-Outs
– Tenant Coordination Meetings
– Multiple Tenant Requirements
– Building Visits
– Wayleaves
– Post Move Care
– Working in Occupied Premises
– Coordinated Branding Exercise
– Sharing the base building M&E
Services and plant space
– Multiple Fit-out Project
Coordination Meetings
23
UNCLASSIFIED
Benefits Realisation
24
UNCLASSIFIED
•
Staff in eleven buildings coming to a single
location
•
Seven Organisationsco-locating and sharing
services:
• One FM Management
• Shared costs in fitout/ occupancy /
continuity
•
Eight properties of 110,000 sq ft / 11,000 m2
released back to the open market
•
Savings of £60 million over ten years
25
UNCLASSIFIED
Association of Chief Estates Surveyors
Award for Excellence in Property Management
November 2013
26
UNCLASSIFIED
An Introduction to HS2 and
Regeneration
Jamie Kerr
Head of Regeneration Company Development
HS2 Ltd
Addressing the capacity crunch
• In 2011/12 passengers made around
1.5 billion journeys, almost doubled
since 1994/95
• 125 million long distance journeys were
made in 2011/12, more than doubled
since 1994/95
• By mid 2020s, key routes will be severely
crowded
• HS2 provides high frequency and high
capacity services
• Up to 18 trains per hour, each carrying up
to 1,100 passengers
• Capacity freed up on existing network
• More freight trains using the space freed
up on the existing rail network
The vision for HS2:
the catalyst for high speed Britain
• A 21st century high speed rail backbone,
integrated with existing network
• Direct, high capacity, rail links between
our major cities
• Foundation for future growth and
prosperity
• Investment in infrastructure that will
deliver a lasting dividend
Transforming the UK’s geography
•
•
•
•
Better connections to/from London
Poor inter-regional connectivity seen as growth constraint
HS2 is not just a new train line, it’s a new national network
New trains will continue into current network
Better commuter services
Milton Keynes
 Up to 12 trains an hour to London Euston
 Up to 1/3 reduction in average journey times
Northampton
 Up to six trains an hour to London Euston
 Reduction in average journey times
Berkhamsted
 Up to eight trains an hour to London Euston
 Up to 1/3 reduction in average journey times
 Better local services, including on the
Kensington Olympia route
Key facts: Phase One
• Connection between London and the West
Midlands allowing through trains to run onto
the West Coast Main Line to serve cities
further north and Scotland
• A new interchange station at Old Oak
Common in West London linking with
Crossrail, the Heathrow Express, the Great
Western Main Line and other public transport
• Stations in Central Birmingham and near
Birmingham Airport
• 140 miles (225km) route length
• Remodelling of Euston station
• Route crosses 24 local authorities – 50% in
tunnel or cutting
Key facts: Phase Two
• The high speed lines will be extended further
north, to Manchester on the western leg and
to Leeds on the eastern leg
• The western leg will serve Manchester
Airport and Manchester Piccadilly
• The eastern leg will serve stations in the East
Midlands, South Yorkshire and Leeds
• Link to the West Coast Main Line at Crewe
for services to Liverpool
• Link to the West Coast Main Line near Wigan
for services to Scotland
• Link to the East Coast Main Line for York and
Newcastle
• Phase Two adds another 211 miles (365km)
of new railway onto Phase One


Leeds 116 miles
Manchester 95 miles
High speed rail and regeneration
• HS1 has seen regeneration at Stratford
and Kings Cross worth £10bn, plus wider
economic benefits of £3.8bn
• Lille has developed a major commercial
centre around its new station
• Crossrail is already affecting investment
decisions, and could help create
additional residential and commercial
value of up to £5.5bn between 2012 and
2021
• HS2 are working in collaboration with the
Core Cities, London Boroughs and the
GLA and other stakeholders to maximise
the regeneration opportunities
Growth Taskforce
•
•
•
•
•
Proposal for a Regeneration
Company
HS2 and London and
Continental Railways to
respond to proposal
Offering expertise and capacity
on commercial and investment
opportunities
Ensuring integration of HS2
stations into surrounding areas
and wider transport network
Identifying sources of
investment
Local Delivery Bodies
•
•
•
4 stations on phase 1 - 5 stations
on phase 2
Growth Strategies to be produced
for each station area
No ‘one size fits all’ solution
Birmingham Curzon




14,000 jobs
600,000 m2 new business space
2,000 new homes
£1.3 billion economic uplift
Birmingham Interchange


10,000 jobs
Green Belt
Timeline – the story so far
Date
Milestone
2009
• HS2 Ltd established
2010
• Phase One command paper and HS2 report
2011
• Consultation on high speed rail and Phase One route
2012
• Government decision to proceed with high speed rail and decision on preferred route for
Phase One
• Property compensation consultation
• Phase Two station and route options submitted to Sec of State
Jan 2013
• Publication of the Government’s initial route, stations and depot preferences for Phase Two
• Launch of the consultation on Exceptional Hardship Scheme for Phase Two
Spring 2013
• Informal Engagement activities including preparation for public consultation for Phase Two
• Paving Bill and Consultation on draft Environmental Statement including design refinements
for Phase One
2013
• Consultation on preferred route, stations and depots for Phase Two launches
• Safeguarding Consultation for Phase One
Nov 2013
• Hybrid Bill for Phase One submitted to Parliament
April 2014
• Successful Second Reading of Hybrid Bill for Phase One
Timeline – next steps
Date
Milestone
2015
• Commence engineering design, environmental impact assessment and preparation of
Hybrid Bill for Phase Two
• Target date for Royal Assent to Hybrid Bill for Phase One, containing legal powers to
construct Phase One
Next
Parliament
• Deposit Hybrid Bill for Phase Two
2016/2017
• Construction on Phase One commences
2026
• Phase One opens to passengers
2033
• Phase Two opens to passengers
In conclusion
HS2 is not just about high speed –
It’s much more important than that.
A CENTURY SURVEYED
COUNTRY LAND AGENTS AND VALUERS ASSOCIATION
CLAVA
ASSOCIATION OF LOCAL AUTHORITY VALUERS AND
ESTATE SURVEYORS
ALAVES
ASSOCIATION OF CHIEF ESTATE SURVEYORS
ACES
1908 TO NOW
LEYBURN 1942
BRANCHES
EASTERN
HEART OF ENGLAND
LONDON
NORTH EAST
NORTH WEST
RURAL
SCOTTISH
SOUTH WEST
SOUTH EAST
WELSH
BRANCH MEETINGS
CONFERENCES
CPDS
WEB SITE
PUBLICATIONS:
TERRIER QUARTERLY
ASSET
Download