Geothermal Technologies Program Public Service of Colorado Ponnequin Wind Farm Geothermal Regulatory Roadmap Project Review April 25, 2013 1 | US DOE Geothermal Program Doug Hollett Geothermal Technologies Program Manager Kate Young NREL Principal Investigator eere.energy.gov Meeting Agenda Status Update • Roadmap Content • Analyses • Web Interface • White Papers Moving Forward 2 | US DOE Geothermal Program eere.energy.gov GRR Content Colorado • Colorado agency/industry review: March 6, 2013 • Completed through agency and legal review • Now available online Texas • Texas agency/industry review: planned June 12, 2013 • Content currently under development Roadmap 3 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov GRR Content: Colorado Permitting Concerns Uncertainty Since geothermal is so new to this state, state agencies (e.g. Department of Water Resources) aren’t quite sure how they will handle every situation. This causes angst and misunderstanding with the general public (they think there are requirements that may or may not be there, and are insisting the developer follow these "ideas”) Leasing State Land Board has not formalized their renewable energy leasing process - there are no resources online or guidance for how to obtain a lease. Plan to present recommendations to the State Land Board soon (in April?). Geothermal Resource is the heat, but does not include water - for example, EGS heat okay. Water rights must be obtained independently. Tributary vs. Nontributary Status DWR and CGS have suggested that a developer WANTS their resource to be tributary because a nontributary source is limited by surface ownership, and by total volume available by law (calculated 100-year life). There would never be enough water in a nontributary water right that is tied to land ownership for an ecumenically viable power plant. Geothermal Well Permitting current process assumes non consumption of the tributary (see previous bullet) water. If any of it is consumptive, DWR is not yet sure how it will be handled - how to obtain a water right. NREL is working with DWR to flesh out that portion of the flowchart. County Regulations (1041 Permits) • Allows the counties to develop their own geothermal permitting and regulations - relates to siting and zoning. • The state has received grant money for suggested guidelines which are in process and scheduled for draft release March 15, 2013. Flow charts will be developed as part of 1041 regs and could be incorporated into the geothermal road-mapping effort. • In some areas, while 1041 permits are in the process of development a moratorium on development has been adopted. (e.g. Chaffee County) Roadmap 4 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Permitting Analyses FY12 FY13 Industry Agencies NREL/DOE Bring People Together Develop Framework • Centralized location for all permitting OUTCOMES Enact Law/ Policy Lower LCOE Increase # of Projects Increase Deployment Analyze effectiveness of currently operating centralized permitting Collect NEPA data and conduct analysis • Cost Recovery/ Permit Fees Provide analysis of successful cost recovery programs 5 | US DOE Geothermal Program Congress Agencies Conduct Analyses • Reduce NEPA permitting time Roadmap Beyond Reduce Permitting Time Develop Language Identify Game Changers and Collect Data Industry Agencies Congress Agencies FY14 Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Permitting Analyses: Permit Coordination Office Jurisdiction Agency Year Started Technology Statute/Policy Comments Hawai’i Hawai’i Department of Business, Economic Development, and Tourism (DBEDT) 2008 Renewable Energy as defined in HRS 269-91 HRS 201N Statute has 14 sections; plus 19 sections of administrative rules The DBEDT creates a permit plan with the developer and makes themselves the accepting agency for HEPA to help circulate the information in the Final EIS to all relevant agencies more quickly. Alaska Alaska Department of Natural Resources Office of Project Management and Permitting 1980 Large Natural Resource Projects AS 38.05.020(b)(9) Statue receives one line within one section of the statute. DNR Commissioner can coordinate the permitting and review of large natural resource projects. DNR recently began to explore using the process for “alternative energy.” California California Renewable Energy Action Team (REAT) 2008 Solar and Wind Executive Order # S-14-08 Primarily for Mojave and Colorado Desert regions to help meet California RPS. Federal BLM Regional BLM Renewable Energy Offices Varies by office Renewable Energy Policy Documents Office is established and implemented individually by each BLM regional office. Federal BLM Regional BLM Oil & Gas Pilot Program Offices 2005 Oil and Gas EPAct 2005 Started 7 offices. They have been so successful, that they are developing 2 additional offices. Roadmap 6 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Analysis Suggestions? • Suggestions for current analyses? • Other ideas for analyses? • Anything else? Roadmap 7 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Permitting Analyses: Cost Recovery Mechanisms Statute/Policy Authority Agency Resource Programs Independent Offices Appropriations Act of 1952 Federal Agencies are authorized to Charge processing costs All All Federal Land Policy Management Act of 1976, Sec. 304 Specific Authorities to charge fees for processing applications and other documents related to public lands BLM Reality (Solar , Wind), Geothermal, Oil and Gas, Coal, Nonenergy leasable minerals, Mineral materials, Mining law Energy Policy Act of 2005, Sec. 234 Provides for 25% of geothermal revenues made available to DOI for implementation of Geothermal Steam Act amendments for a period of 5 years, without FY limitation or appropriations for a period of 5 years DOI Geothermal Department of Interior Appropriations, FY 2010 Requires BLM to collect a $6,500 APD Processing Fee BLM Oil and Gas 43 CFR 3000-3870: annually adjusted Oil and Gas Leasing; Geothermal Resources Leasing; Coal Management; Management of Solid Minerals other than Coal; Mineral Materials Disposal; and Mining Claims Under the General Mining Laws BLM Geothermal, Oil and Gas, Coal, Nonenergy leasable minerals, Mineral materials, Mining law Roadmap 8 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Analysis Suggestions? • Suggestions for current analyses? • Other ideas for analyses? • Anything else? Roadmap 9 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Permitting Analyses: NEPA Data NEPA Data • Populating a catalog of more than 150 recent geothermal NEPA documents • NEPA documents collected from: BLM, USFS, BOR, DOE • Includes all phases of development: Land Use Planning Exploration Well Field Power Plant Transmission • Information can be sorted, analyzed and compared by different criteria, such as by type of planned activity, by state or field office, by type of NEPA document Roadmap 10 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov NEPA: List of Suggested Data to Collect Administrative Data • Agency (State, Office, Document Number/Serial Number, leases) Project Data • Applicant, Project Name, Project Type (Exploration, Drilling/Field Development, Utilization) • Scope (brief narrative) Type of Analysis • Casual Use • Determination of NEPA Adequacy • Categorical Exclusion • Environmental Assessment • Environmental Analysis Roadmap 11 | US DOE Geothermal Program Permitting Analysis Consultation, Special Interest and Concerns • Wildlife: Critical Habitat, Special Status Species • Cultural Resources • Visual Resources Timelines/Action Dates • • • • Application date Public Notice Decision Processing Time Technology White Papers Web Interface Future Plans eere.energy.gov 1. Provide data for future NEPA Analyses User Story BLM field office receives application for a reflective seismic survey. Agency personnel, including geothermal permit processing agent, specialists (biologist, cultural specialist, etc.) are unfamiliar with reflective seismic surveys or their potential impacts. Database Input • Users search for “reflective seismic survey.” • Basic information is provided about the survey, including how it is conducted, timeframes, output information, etc., • Links are provided for further information and potential “training” (videos, presentations, papers, etc.) • Lists of previous NEPA analyses conducted for reflective seismic surveys are listed, including dates, timeframes, locations, impacted species and stipulations Impact The collection of this information helps to: • Reduce misunderstanding about potential activity impacts • Provide consistency among NEPA analyses conducted for similar activities • Potentially reduce time required to determine impacts and stipulations Roadmap 12 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov 2. Aid in Development of Categorical Exclusions Definition Categorical exclusion means a category of actions which do not individually or cumulatively have a significant effect on the human environment ... and ... for which, therefore, neither an environmental assessment nor an environmental impact statement is required. 40 CFR 1508.4 Note that a categorical exclusion can significantly reduce NEPA time requirements Typical CE Typical EA 3 months 10 months Categorical exclusions (CEs) are actions which meet the definition contained in 40 CFR 1508.4, and, based on past experience with similar actions, do not involve significant environmental impacts. They are actions which: do not induce significant impacts to planned growth or land use for the area, do not require the relocation of significant numbers of people; do not have a significant impact on any natural, cultural, recreational, historic or other resource; do not involve significant air, noise, or water quality impacts; do not have significant impacts on travel patterns; and do not otherwise, either individually or cumulatively, have any significant environmental impacts. 23 CFR 771.117(a) Roadmap 13 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov 2. Aid in Development of Categorical Exclusions • Categorical exclusions (CX) are developed based on previous experience, so collecting information from existing geothermal NEPA documents for similar actions (e.g. specific exploration or drilling activities) can be the basis for development of categorical exclusions for geothermal. • CXs can be: • Implemented by administrative policies • Mandated by congress (Sec. 390 EPAct of 2005 for O&G) or through agency regulations. • Developed during land use planning process and within NEPA documents for multiple well and development projects, that provides for the use of individual CXs or determination of NEPA adequacy (DNA). • Providing the upfront data collection and analysis can provide the federal agencies the data needed for development of categorical exclusions. Roadmap 14 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Permitting Analyses: NEPA BLM Activity O&G USFS Geothermal O&G Geothermal DOE USGS Geothermal --- Agency Activities Land Use Planning Leasing EIS EIS --- --- EA/DNA EA/DNA --- --- CX1 CX3 CX4 CX6 EA/DNA1 CX3 EA/DNA ?? Geophysical Exploration (including TGWs) No new roads Up to 1 mile of new roads Drilling Permits (into the reservoir) Exploration wells EA/DNA CX2 EA/DNA EA --- Development wells CX2 EA/DNA CX2 EA/DNA NA --- Infill wells CX2 EA/DNA CX2 EA/DNA CX4 --- CX2 EA/DNA CX2 EA/EIS --- --- Utilization/Operation EA/EIS EA/EIS EA/EIS EA/EIS CX4,5 --- Minor Maintenance CX2 EA/EIS CX2 EA/EIS --- --- Other Activities Off-lease Pipeline 1 DOI Department Manual 516 11 (6) EPAct 2005, Title III-Oil and Gas, Sec. 390-& BLM IM 2005-247 3 32 CFR 220.6(e)(8) 4 10 CFR 1021 (b) 5 Small facilities only 6 DOI Department Manual 516 6.5 Roadmap Technology White Papers Permitting Analysis 2 15 | US DOE Geothermal Program Web Interface Future Plans eere.energy.gov GEOTHERMAL POWER NEPA Document: EA at Brady Hot Springs (DOI-BLM-NV-W010-2012-0057-EA) Proposed Action General NEPA Document Info Technology Geothermal Energy Ormat’s well 15-12, located north of the Hot Springs Mountains, approximately 50 miles northeast of Reno, in Churchill County, Nevada; T. 22 N., R. 26 E., sec. 12 (Figure 1), was installed in April 2007 to serve as a production well; however, further testing revealed that the well does not have sufficient hydraulic connections with the geothermal reservoir and it has since remained inactive. Ormat proposes to implement a hydro-stimulation program (EGS) to increase energy production by enhancing natural hydraulic connections within the existing hydrothermal system. Hydro-stimulation involves creating better hydraulic connections by injecting cool geothermal water (temperatures ranging from 90-140°F) to further open the existing network of minute cracks in the rocks deep underground, where natural fractures already occur. During the process, geothermal water produced from the geothermal production wells and processed at the geothermal plant would be injected at wellhead pressures less than 1,400 pounds per square inch at depths ranging from approximately 4,245 to 5,096 feet below ground surface. The stimulation plan outlines the injection of cool geothermal water into three vertical intervals at varying pressures over a period of approximately three weeks. The increase in pressure would also accompany a pulsing of the rate of injection. Tracer compounds would be injected at specific times during the stimulation to identify movement of geothermal fluid in real time. Additional details are provided in the Tracer Testing section of the report. Document Type Environmental Assessment Applicant Brady Power Partners Consultant Agency Geothermal Area Brady Hot Springs Geothermal Area State NV Project Phase Well Field Development Techniques Hydro-Shearing Comments DOE/BLM Staff Time Frames (days) Lease to Application Application Time Process Time Total Time Participating Agencies Applicant-Proposed Environmental Protection Measures Lead Agency BLM Managing Field Office Winnemucca Funding Agencies DOE Impacts Mitigation Surface Manager BLM Mineral Manager BLM Conditions of Approval Selected Dates Lease Date Link to Document: https://www.blm.gov/epl-front-office/projects/nepa/34003/42110/44613/2013-1-11_Brady_Hydro-Stimulation_EA.pdf Pre-Application Meeting Date Application Date Roadmap Permitting Analysis What links here Program Related changes 16 | US DOE Geothermal Technology White Papers 16 Upload file Special pages Web Interface Application Document Future Plans NOI Date (EIS) Federal Register Printable version Permanent link Revised Application Date Browse eere.energy.gov GEOTHERMAL ENERGY Geothermal Technique: Hydro-Shearing Details Activities (9) Areas(2) Regions(0) NEPA (2) Document # Document Type Project Phase Project Activities Applicant Decision Date Total Time (days) DOI-BLM-NV-W0102012-0057-EA EA Well Field Development Hydro-Shearing Brady Power Partners 11/20/2012 320 Roadmap Permitting Analysis What links here Program Related changes 17 | US DOE Geothermal Technology White Papers Upload file Special pages Web Interface Printable version Future Plans Permanent link Browse eere.energy.gov Analysis Suggestions? • Suggestions for current analyses? • Other ideas for analyses? • Other ideas for displaying results? • Anything else? Roadmap 18 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Technical White Papers Task Description: Develop technology characterizations of geothermal technologies to help educate agency personnel on the technical details, field operations, environmental impacts and permitting issues. General Outline: 1. Introduction 2. Technology Description 2.1 Technology Overview 2.2 Technology Features 3. Environmental Impacts and Permitting Issues 3.1 Environmental Impact Screening Criteria 3.2 Potential Environmental Consequences 3.3 Permitting Requirements and Issues Roadmap 19 | US DOE Geothermal Program Permitting Analysis Technical White Papers Web Interface Future Plans eere.energy.gov Technical White Papers - Topics FY13 White Paper Topics FY14 White Paper Topics Hydraulic Stimulation: • • • • Reservoir Engineering: • • • • Multi-Stage Stimulation Zonal Isolation Diverters Chemical Stimulation Downhole Fluids: • • • • Exploratory Drilling: • • • Stimulation Fluids Tracers Working Fluids Nanotechnologies • • • Drilling Muds Casing Cementing BOPs Injection Wells Advanced Drilling Techniques Step-Outs Lateral/Horizontal Drilling • • • • 20 | US DOE Geothermal Program Permitting Analysis Geological Human Observation Geochemical Remote Sensing Other Stimulation: • • • • Seismic MT Gravity Roadmap Re-Injection On-Site Treatment Shipment for Treatment Geoscientific Surveys Geophysical Surveys: • • • Temperature Gradient Holes (TGH) 2M Probe Surveys Slimhole Drilling Produced Fluids Production Drilling and Well Completion: • • • • • • • • Well Characterization Techniques Flow Tests Down-hole Methods Induction of Fluid Flow Technical White Papers Chemical Stimulation Explosive Stimulation Rock Mechanics Fracture Propagation Web Interface Future Plans eere.energy.gov Technical White Papers Schedule Task Team Kick Off Meeting Time Frame 1 day Develop Technical Working Paper Construct Finalize List of Paper Topics 3 Weeks Data Collection and Analysis for Paper #1 Draft Technical Working Paper #1 DOE and partner agency review of Paper #1 Incorporate Comments and Finalize Paper #1 Data Collection and Analysis for Papers #2-5 Draft Technical Working Papers #2-5 DOE and partner agency review of Papers #2-5 Incorporate Comments and Finalize Papers #2-5 Publish and Distribute Papers #1-5 2 Weeks 3 Weeks 5 Weeks 2 weeks 3 Weeks 5 weeks 8 weeks 3 weeks 2 weeks 3 week Due Date Responsible Entity J F M A M J J A S Week of All entities 1/22/2013 2/15/2013 New West with support from NREL 2/15/2013 DOE, in consultation with BLM, USFS, and DOD, and with support from New West and NREL 3/1/2013 New West with support from NREL 4/5/2013 New West with support from NREL 4/19/2013 DOE, in consultation with BLM, USFS, and DOD 5/10/2013 New West with support from NREL 5/24/2013 New West with support from NREL 7/19/2013 New West with support from NREL 8/9/2013 DOE, in consultation with BLM, USFS, and DOD 8/22/2013 New West with support from NREL 9/12/2013 DOE with support from New West/NREL April 25, 2013 21 | US DOE Geothermal Program eere.energy.gov White Paper Suggestions? • Suggestions for current topics? • Other ideas for outlines? • Anything else? Roadmap 22 | US DOE Geothermal Program Permitting Analysis Technical White Papers Web Interface Future Plans eere.energy.gov Web Interface: Updates Recent Updates to OpenEI • Link to roadmap from Geothermal Gateway • Roadmap pages now are available: by state, by technology • Makes documents more accessible • New pages will be the support behind the new web interface • Wizard interface (Turbo-Tax-like interface) – in process; plan to have mock-ups by next quarterly meeting Roadmap 23 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Web Interface: State Pages Roadmap 24 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Web Interface: Technology Pages Roadmap 25 | US DOE Geothermal Program Permitting Analysis Technology White Papers Web Interface Future Plans eere.energy.gov Upcoming Plans Roadmap • Finalize Texas roadmaps • Meet with Texas agencies/industry • Legal review with BHFS Analysis • Finish agency personnel interviews • Draft papers for GRC • Clean and upload NEPA document metadata • Collect similar information for oil & gas • Analyze data and draft GRC papers with results NEPA White Papers Web Interface Roadmap 26 | US DOE Geothermal Program • • Finalize paper #1 (Hydraulic Stimulation) Draft and finalize papers #2-5 • Continue to add general information for each of the roadmap areas • Add data to the state pages to query on each technology page • Continue development of wizard interface, walking users through permit trigger questions Permitting Analysis Technology White Papers Web Interface Upcoming Plans eere.energy.gov