OUTLINE: I.General description of North Sulawesi II.Potential Resources III.Proposed Investment: Infrastructure: Toll Road, Railway Special Economic Zone Development (KEK): Manado-Bitung Energy: Geothermal Agriculture: Export Commodities Tourism GENERAL INFORMATION OF NORTH SULAWESI MAP OF NORTH SULAWESI 1. Area: 15 272.44 km2 (4 Municipalities and 11 Regions) 2. Population: 2.27 million people 3. Macro Economic Indicator (2011) i. Economic growth 8 % ii. GRDP US$ 4,719,303 iii. Per Capita Income US$ 2,786 iv. Total Export: US$ 375,850,000 v. Total Import: US$ 71,350,000 4. National Human Development Index (HDI) Rank in Indonesia: 2 AGRICULTURE/ESTATE: CORN, PADDY, COCONUT, CLOVES, NUTMEG, AND HORTICULTURE (FRUIT AND VEGETABLES) FISHERIES: SEAWEED, SKIPJACK, BLUE AND GOLD SNAPPER, WAEGIU SNAPPER, PACIFIC RED SNAPPER, and EPHINEPHELUS SPILOTOCEPS RENEWABLE ENERGY: GEOTHERMAL, HYDRO, SOLAR, AND OCEAN THERMAL ENERGY CONVERSION (OTEC) Manado-Bitung Toll Road Project Cost and Financing US$ 366,8 million Manado-Bitung Toll Road technical aspect Length 43,6 km, Design speed 80,00100,00 km/h, number of lane 2 x 3, lanes of width 3,60 m INVESTMENT OPPORTUNITY IN SPECIAL ECONOMIC ZONE BITUNG 1. 2. Areas : + 2.000 Ha; Location: City of Bitung & Minahasa Utara Regency. SPECIAL ECONOMIC ZONE BITUNG Special Economic Zone at Bitung City as a main port focusing on fisheries and agroprocessing industries. Location prepared 2000 ha. Whereas 120 hectares ready to built area as an incentives for investors . Why? Special Economic Zone Bitung will become cargo consolidation center, to accommodate the distribution of commodities from other regions in Sulawesi, North Mollucas, Mollucas and Papua to be exported outside the country through Bitung Port. SPECIAL ECONOMIC ZONE BITUNG Target Market: Domestic and International Market Project Scope: Fishing port Multi warehouses A container freight service (CFS) terminal which will be developed on the reserved land between 3 to 5 hectares for Container Yard (CY). Sufficient power supply for the industrial areas Other infrastructures include telephone lines, water supply, drainage, and central sewage treatment plant will be provided. Project Estimation Cost: US$ 60,000,000 Project Document Availability: Feasibility Study Railway Plan Trans Sulawesi from Bitung (North Sulawesi) to Makassar (South Sulawesi) 1st Stage, Railway: Bitung-Gorontalo: 250km GEOTHERMAL POWER PLANT Potential 400 MWe in Minahasa: , estimated cost US$ 800.000.000 In Bolmong: Potential 300 MWe, Estimated Cost US$ 600.000.000 Why? Manado City needs about 75 MW power supply 2. Real estate developments need 60 MW 3. IHP needs 100 MW 4. Mining Industries; 60 MW 5. Manado-Bitung IEDZ (Integrated Economic Development Zone); needs 50 MW 1.