RAJIV AWAS YOJANA PRESENTATION ON SFCPoA –BILASPUR, C.G. CONSULTANT- WAPCOS LIMITED (A Govt. of India Undertaking) NODAL AGENCYSTATE URBAN DEVELOPMENT AGENCY, RAIPUR C.G. IMPLEMENTING AGENCY- BILASPUR MUNICIPAL CORPORATION (C.G.) Contents Introduction to Bilaspur City SFCPoA Fact Sheet Approach & Methodolgy of SFCPoA Socio-Economic Survey. GIS Mapping Data Analysis. Housing . Population Projection. Funding Introduction to Bilaspur Bilaspur city, is the second largest city in the state of Chhattisgarh, spread over an area of 30.24 sqkm with a population of 3,30,106 (2011 Census) ,No of Wards66 The High Court of Chhattisgarh is also located in the city, zonal HQ of S.E.C. Railway, power plants – NTPC, Planning area (urban aglomaration ) includes BMC, 2 ULB, 29 Villages Total Population of UA /Planning area – 5,07,507 Total No of Slums – 134 Total Slum Population – 1,71,301( 34%) SLUM LOCATION MAP SFCPoA FACT SHEET DOCUMENT TITLE 1 Name of State 2 Name of City, Population 3 Name of ULB 4 Name of SLNA 5 Name of Consultant, if any Chhattisagrh Bilaspur , 5,07,507 (Planning Area) Bilaspur Municipal Corporation State Urban Development Agency WAPCOS Ltd. (A Govt. of India Undertaking) SFCPoA HIGHLIGHTS 1 a i ii b c PROFILE Number of Identified Slums Notified Non Notified Slum Population, % of total Slum Households 134 55 79 1,71,301, 33.74% 44005 Contd.. 2 CURATIVE STRATEGY a Tenable Slums 70 b Untenable Slums 63 c Semi Tenable Slums 1 Total 134 d Development Options Mix 1 In-situ Redevelopment 60 2 In-situ Up-gradation 9 3 Relocation 30 Being covered Under IHSDP/VAMBAY (Delisted) Total 35 134 Contd.. INVESTMENT REQUIRED AND PHASING (CURATIVE ) Particulars Number of Slums (99 nos) Housing (Amount) Physical Infrastructure Social Infrastructure Total (Housing + Infrastructure) : (A) O & M Cost, DPR, PMC and Community Mobilization & A&OE (B) @ 16% (including Contingency@ 2%) Total Cost (C )=(A) + (B) 1st Phase Year (2014-2018) 2nd Phase Year (2015-2018) 3rd Phase Year (2016-2020) 4th Phase Year (2017-2022) Total Rs. (in Crore) 57 11 16 15 468.10 260.90 336.92 291.98 1357.90 100.12 52.98 70.60 59.29 282.99 12.49 8.74 8.75 9.78 39.76 580.71 322.62 416.27 361.05 1680.65 92.90 51.62 66.61 57.78 268.91 673.61 374.24 482.88 418.83 1949.55 Contd.. PREVENTIVE STRATEGY Projected Housing Shortage for Urban Poor upto 2029 (Housing) Particulars Housing (Amount) Physical Infrastructure Social Infrastructure Total (Housing + Infrastructure) : (A) O & M Cost, DPR, PMC and & A&OE (B) @ 11% (Including Contingency and Excluding Community mobilization) Total Cost (C )=(A) + (B) 12075 Nos INVESTMENT REQUIRED AND PHASING (PREVENTIVE) 1st Phase 2nd Phase 3rd Phase 4th Phase Year Year Year Year (2014-2016) (2016-2018) (2018-2020) (2020-2022) 5th Phase Total Rs. Year (in Crore) (2022-29) 54.99 11.17 1.84 60.23 12.23 2.02 65.47 13.30 2.19 70.70 14.36 2.37 284.13 57.70 9.52 535.52 108.76 17.94 68.00 74.48 80.96 87.43 351.35 662.22 7.48 8.19 8.91 9.62 38.64 72.84 75.48 82.67 89.87 97.05 389.99 735.06 Contd.. INVESTMENT DETAILS FOR CURATIVE & PREVENTIVE (Figures in Crore) Strategy Curative (new + upgradation) Preventive Total Number Housing of Units Cost: (A) Physical and Social Infrastructure Cost: (B) Total Cost (C) = (A) + (B) O & M Cost, DPR, PMC, Community mobilisation & A&OE: (D) Total Cost : (C) + (D) 36996 1357.89 322.75 1680.64 268.91 1949.55 12075 49071 535.52 1893.41 126.70 449.45 662.22 2342.86 72.84 341.75 735.06 2684.61 INVESTMENT DETAILS FOR HOUSING & INFRASTRUCTURE Particulars Housing Infrastructure Requirement Total Total Base Cost: (A) DPR, PMC, O&M & Other Cost (B): Total Funding Requirement (C)= (A) +(B) 1893.41 276.17 2064.29 449.45 65.58 620.33 2342.86 341.75 2684.61 Contd.. Sharing Pattern (In Percentage terms) Component MoHUPA State Government 75% 15% Housing (Curative + Preventive) Infrastructure (Curative + Preventive) 75% 15% ULB 0% Beneficiary 10% 10% 0% Sharing Cost for the Curative & Preventive Strategy (Figures in Crore) MoHUPA State Government ULB Beneficiary Total Housing Infrastructure Contingency 2% O & M Cost @ 4% 1420.07 337.08 35.14 70.29 284.01 67.42 11.71 23.43 0 44.95 0 0 189.34 0 0 0 1893.42 449.45 46.85 93.72 DPR, PMC, TPIM, Social Audit & A&OE @ 5% 87.86 29.28 0 0 117.14 Community Mobilization & Transit Accommodation @ 5% 63.02 21.01 0 0 84.03 Total 2013.46 436.86 44.95 189.34 2684.61 Contd.. SFCPoA: Strategy CURATIVE STRATEGY Assessment of present status of slums Slum listing Slum survey Data profiling of slum-MIS Mapping of slums using GIS Integration of GIS and MIS Categorization of all slums based on tenability Prioritization of tenable and untenable slums Stakeholder Consultations including active Community Engagement Formulation of slum development options Detailed analysis of prioritized slums Formulation of development options PREVENTIVE STRATEGY • Estimating Urban Poor Housing Shortage & Identifying Supply & Demand Constraints • Framing Future Supply Strategy and Suggest Reforms • Suggesting Reforms to ease identified Supply and Demand Constraints in Urban Poor Housing SLUM SURVEY: with Community Participation Discussion made: Objective of the scheme and the contribution of the beneficiaries Type of houses to be built and facilities to be provided DOOR TO DOOR SOCIO-ECONOMIC SURVEY Allotted unique Household no. Filling up prescribed format of NBO Collected livelihood details Quality Checking BY BMC, BILASPUR GIS MAPPING GEO-REFERENCED BASE MAP SLUM LOCATION MAP SLUM BASE MAP GIS – MIS INTEGRATION MIS Join shape file is to be imported in slum base map. DATA ANALYSIS BY THE GEOGRAPHICAL INFORMATION SYSTEM (GIS) •MIS table is to be joined to the GIS base map with unique field. VIEW OF GIS-MIS INTEGRATION SLUM PROFILE -DATA ANALYSIS HOUSING STATUS S.N 1 2 3 Structure Pucca Semi pucca Kutcha Total H.H (No) 3684 16189 24152 44,005 Percentage (%) 8.38 36.74 54.88 100 Housing Status w.r.t. Slums H.H 8% 55% 37% 1 Pucca 2 Semi pucca 3 Kutcha LAND OWNERSHIP OF THE SLUMS S. No. 1 2 3 4 5 6 7 8 9 Total 77 No. of slums 27 01 77 08 07 01 02 01 10 134 Land Ownership 27 Trust Private 10 PWD 1 Reserve Forest 2 Nazul 1 Railway (Central Govt.) 7 C.G. Govt. 8 BMC/Colleg e 1 BMC 100 80 60 40 20 0 Land Ownership BMC BMC/Govt. College C.G. Govt. Railway (Central Govt. ) Nazul Reserved Forest PWD Private Trust Private 1 2 3 4 5 6 7 8 9 POPULATION DETAIL BASED ON CATEGORY S. No. 1 Total No of Slums 134 Percentage General population SC ST OBC population population population Total Population 21093 40078 18049 92081 171301 12% 23% 11% 54% 100% Population (Caste Wise) 12% 54% 23% 11% General SC ST OBC DETAILS OF CATEGORY, RELIGIOUS & HANDICAPPED PERSON 10% 23% 9% Christen Jainism Buddhism No of Physically Challenged On of Mentally Challenged 17130 39399 15417 99355 39182 3952 Handicapped (HH) Sikh Muslim Hindu Religious (HH) OBC ST SC General Caste (Population) 414 392 53 13 929 125 58% 89.04% 8.98% 0.94% 0.89% 0.12% 0.02% 0.65% 0.09% OCCUPATIONAL PROFILE OF SLUMS DWELLERS S. No. Occupations No of H.H. (%) of Total HH 1 Self employed 3105 7 2 Salaried 1625 3.69 Occupational Profile of Slums Dwellers 7% 4% 19% Self employed Salaried Casual labour 3 Casual labour 31041 70.59 4 Others 8234 18.72 44005 100 Total Others 70% TENURE STATUS OF SLUMS Tenure No of Slums 1- Secure Tenure ( More than 60 % Patta) 17 Slums 2- In- Secure Tenure (Less than 60 % Patta) 117 Slums Total Slums 134 SAMPLE COPY OF TEMPORARY PATTA 3X3 MATRIX ANALYSIS Parameters : Land tenure Status : Legal status of land ownership. Housing Conditions Existing quality of Housing and Infrastructure conditions Infrastructure Availability Matrix Analysis Code Matrix Analysis Code 311 312 INFRASTRUCTURE SCENARIO IN SLUMS Water Supply Available Infrastructure Slum Sanitation Available Infrastructure Slum Drainage Available Infrastructure Slum Road Available Infrastructure Slum Solid Waste Management Available Infrastructure Slum Medium (35-70%) 37 Low (Below 35%) 97 Total slums 134 Medium (35-70%) Low (Below 35%) Total slums 33 101 134 Medium (35-70%) Low (Below 35%) Total slums 51 83 134 Medium (35-70%) Low (Below 35%) Total slums 62 72 134 Medium (35-70%) Low (Below 35%) Total slums 78 56 134 Social Facilities Details Nos High School 18 Primary Health Center 5 Govt. Hospital 8 Primary School 36 Anganwadi Total slums 103 134 Housing HOUSING PATTERN Housing Pattern: It is based on existing housing area, residential density and F.A.R Possible Density Options: Covered area Carpet area (Sq.m.) (Sq. m.) 30 25 No. of F.A.R Floors G+2(Can be extended within prescribed F.A.R) Possible Density (DU/Ha) 1 300 D.U.PLAN OF ASHOK NAGAR SLUM -Pilot DPR CARPET AREA- 25 SQM. AND BUILT-UP AREA.-30SQM. PROSPECTIVE VIEW BLOCK PLAN POPULATION PROJECTION PROJECTED POPULATION OF URBAN AGGLOMERATION AREA Year Urban (UA) Census 2001 Census -2011 (UA= (UA=BMC BMC+4 +1no OG nos OG Village) villages) 294458 349107 Growth (UA= Rate Population BMC+ 29 %(2001- of 25 no nos OG 2011) villages, villages) added to Under UA in Survey 2012. RAY 18.5 158400 Projected Population Year 2021 -590943 Year 2031- 674379 Decadal growth rate for the period 2001 to 2011: Urban population-18.5 % Rural population – 39.39 % 2021 (UA) 2031 (UA) 5,07,5,07 590943 674379 ESTIMATED SLUM POPULATION OF URBAN AGGLOMERATION AREA (PERSPECTIVE 20 YEARS) Year Census- Census- Growth 2001 2011 Rate % Urban 110336 Village Total 110336 128794 128794 17 - Survey2013 Growth Rate % 2021 101246 70055 171301 17 30 47 118458 91072 209529 Projected Population Year 2021 -209529 Year 2031-256989 Decadal growth rate of for the period 2001 to 2011: Urban population-17% Rural population – 39.39 % Note : Decadal growth of rural population is assumed as 30 % Growth 2031 Rate % 17 30 47 138596 118394 256989 TOTAL HOUSING AND LAND REQUIREMENT FOR CURATIVE AND PREVENTIVE STAGE 1 Curative 2014-2022 Total Housing Requirement 36993 DUs 2 Preventive 2014-2029 12075 DUs S. No Stage Total Period 49068 DUs Year of Projection –2014-2029 Maximum Density- 300HH/Ha Norms adopted: Bhumi Vikas Niyam,1984.. Land Requirements(Ha) 34.06 (For Relocation ) 53.66 (For New Housing) NO OF SLUMS PHASE WISE & PHASING CRITERIA Curative Stage No. of Slums Phase Phasing Year Total HH Phasing Criteria Hazardous Slums, Small Size (200 HH) Slums , ARPA River (200m. Buffer Area Restricted for the River Front Development Plan ) and BMC Land ownership Government Land With High and Medium Density Slums (More than 100 HH/Ha.) 1st Phase 57 2014-2018 14433 2nd phase 11 2015-2018 6974 16 2016-2020 8549 Government Land with low Density Slums (Less than 100HH/Ha) 4th phase 15 2017-2022 7037 Under Railway Education and Forest Land Ownership Total Housing Requirement in Curative stage 99 - 36993 3rd phase Prevention Stage Total HH Total Housing Requirement in Preventive Stage in 15 years (20142029) 12075 Total Housing Requirement up to- 2029, both in Curative stage & Preventive Stage 49068 Remarks To be developed on State Govt. land & 15 % Reserved for the EWS land. FUNDING SHARING OF THE PROJECT COST Sharing of the Project Cost: Central Government -75 percent of the cost of provisions of basic civic and social infrastructural amenities and housing including O&M of assets created under the scheme. State Government – 15 percent of the cost of provision of housing and infrastructure and civic amenities and O&M assets. ULB’s Share - 10 percent of the cost of infrastructure and civic amenities and O&M assets. Beneficiary Share - Minimum 10-12 percent of the cost of housing. (10 percent in the case of GEN/SC/ST/BC/OBC/PH and other weaker sections) IMPLEMENTATION PHASING OF SLUMS & FUNDING REQUIREMENT FOR CURATIVE & PREVENTIVE SATGE S. No Phase(Year) 1 Phase-I No. of No. of DUs DUs Proposed Preventive Proposed Curative No of under RAY (Amount in under (Amount in Slums (AHP)crore ) RAYcrore) Preventive Curative Stage Stage 14433 1610 57 673.61 75.48 Total Amount ( in crore) 749.09 2 Phase -II 11 6974 1610 374.24 82.67 456.91 3 Phase –III 16 8549 1610 482.87 89.87 572.74 4 Phase -IV 15 7037 1610 418.83 97.05 515.88 - - 5635 1949.55 389.99 735.06 389.99 2684.61 Phase -V(20225 2029) after Scheme Time Line) Total 99 36993 12075 Thank you TENABILITY STATUS Sl. No. 1 2 3 Tenability Tenable Slum Un-tenable Slum Semi-tenable Slum Total No of Slums 70 63 1 134 LAND VALUE OF SLUMS Land values records have been collected from Registrar office, Bilaspur Categorized into high Medium & low valued land S. No. 1 2 3 Land Value Categorization High Medium Low Source-Registrar office, Bilaspur Range of land value(Rs./Ha.) More than 0.99 Crore No of Total 89 Between 0.50-0.99 Crore Less than 0.50 Crore 29 16