ELECTRIC ENERGY PRODUCTION
National Electric Energy Production (GWh)
Electric Energy Production by source
(%)
45,000
2013
2003
40,000
Thermal
14%
35,000
30,000
Others
1%
25,000
20,000
15,000
10,000
Hydraulic
86%
5,000
Thermal
46%
Hydraulic
53%
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Hydraulic
Thermal
Source: Committee of Economic Operation of SEIN
Others
Source: Committee of Economic Operation of SEIN
The exploitation of the Camisea field has lead in the expansion of thermal generation, which has grown by an
average annual rate of 22% for the last ten years.
ELECTRIC ENERGY DEMAND
Electricity Coverage
Population with access to electricity (%)
2003-2012
Maximum Demand (MW)
2003 - 2013
84.8%
6,000
5,000
79.5%
78.1%
87.2%
78.5%
4,000
82.0%
78.7%
3,000
68.7%
76.0%
2,000
69.6%
1,000
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Source: Committee of Economic Operation of SEIN
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Source: National Society of Mining, Oil and Energy
The growth of the country's economic activity has generated an expansion of energy demand. The maximum
demand of the National Interconnected Electric System (SEIN) amounted to 5,575 MW in 2013, which is 5.4%
above the prior year. Regarding the electricity coverage, it reached 87.2% in 2012. The aim is to reach 90% in
the coming years.
SOLAR POTENTIAL
The availability of solar energy is fairly
uniform throughout the year within a
margin of + / - 20% of the annual
average.
Annual average
(kwh/m2)
Southern coast
6,0 – 6,5
Central coast
5,5 – 6,0
Highlands
5,5 – 6,0
Southern jungle
5,0 – 5,5
Northern jungle
4,5 – 5,0
Source: Ministry of Energy and Mines
1st RER Bidding for Energy Supply for Not Connected
Areas




Objective: Award for a 15 years period, the electricity
sypply of with Renewable Energy Resources up to
500,000 consumers located in isolated rural areas. Is
expected to achieve the installation of:
 410,000 panels on housings.
 7,500 panels on Educational Institutions.
 2,100 panels on Health Stablishments.
Schedule
Activities
Fechas
Call
September 12th, 2013
Registration of
participants
Up to August 1st, 2014
Authorizations and Permissions: Obtaining sectorial
rights, permissiones o licences is not required
because the equipment will be installed on users
property.
Selling Bases
Up to August 1st, 2014
Suggestions and inquires
to Bases
Up to May 12th, 2014
Competition factor: Annual compensation proposal,
that shall be in accordance with the «Base
Remuneration» established by OSINERGMIN.
Files presentation
Current Status: Registration of participants up to
August 2014.
Price of Bases: US$ 1,000.00
Publication of Minutes of
Bidders
Award
August 5th, 2014
August 22nd, 2014
September 09th, 2014
Download