NFV Updates V3 (TOSCA TC Call)

advertisement
24.Oct 2013
Security Level: Alpha
NFV Updates
www.huawei.com
Deepanshu Gautam
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
MANO Descriptors
TOSCA is expected to support all!!!
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 2
NFV recommends TOSCA
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 3
IMS MRF using TOSCA
TOSCA Package
(CSAR)
(NSD)
Service Template
(.tosca)
Plans (.bpmn)
(BPMN Process
Model)
TOSCA Metadata
(.meta)
Function Logic/
Dependeant libiraries
(.ear, .jar)
Lifecycle mgmt scripts
(.py)
IMS MRF use case
NodeTemplate
(VNFs - MRF, MRFC+P)
Requirements and
Capabilities
Implementation
Artifact
(lifecycle
management scripts)
Relationship
Template
(dependencies
between VNFs)
Deployment Artificat
(AppLogic [.ear], VM
images [.ovf])
Opeartions
(Lifecycle
Management
defination)
Deployable image
Images (OVF)
Plans
(Lifecycle
Management Process
Model)
Properties
(General Features)
Policy
(Reliability,
Avaliability,
monitoring policy)
In Black: TOSCA constructs
In red: mapping NFV requirements
Note: Refer to the attached document for detailed
IMS MRF Service Template
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 4
TOSCA for MANO Descriptors
TOSCA Service Template
HUAWEI TECHNOLOGIES Co., Ltd.
TOSCA NodeType
HUAWEI Public
Note yet defined
Page 5
???
VNF Forwarding Graph
Virtual Link (VL)
The VLD describes the basic topology
of the connectivity (e.g. ELAN, ELINE,
ETREE) between one or more VNFs
connected to this VL, bandwidth and
QoS class, IP address and VLAN
allocation), and additional information
(e.g. location, anti-affinity rules etc.).
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 6
VLD
The VLD describes the basic topology of the connectivity (e.g. ELAN, ELINE, ETREE) between one or more VNFs connected to this VL, the
required parameters for each interface (e.g. bandwidth and QoS class, IP address and VLAN allocation)
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 7
Next meeting (13-16 May)
• Okinawa
• WG specifications will be stable after Okinawa
• WG will be approved on 18 June
• NFV Phase 1 release approval Dec 2014
• NFV Phase 2 initiation Feb 2015
• Phase 2 proposal under discussion already
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 8
Conclusions
• Liaison statement from TC is received by ETSI NFV Support
• The Liaison will be discussed in Okinawa meeting
• ISG will also appoint an ISG liaison officer for OASIS
• Gap Analysis work in ETSI has deferred to post Okinawa.
• A new EG will be formed which will consolidate input from all WGs
and create a single report to be shared externally.
• TC is requested to look into NFVs requirements and see how
TOSCA can support them and how.
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 9
Current NFV
MANO
Architecture
Architecture
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 10
Timeline
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 11
NOIP (NFV OpenSource)
NFV Open Source project is proposed to be governed by Linux Foundation
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 12
Membership
HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Public
Page 13
Download