DPR PREPARATION Under IWMP PLANNING Process and Resource Requirements IWMP MAIN: OBJECTIVES To restore: Ecological balance by harnessing, conserving, and developing degraded natural resources such as soil, vegetative cover and water. Vimarsh , The Consultancy Group – A Corporate Presentation . 2 IWMP - BROAD OBJECTIVE: OVERALL DEVELOPMENT OF WATERSHED COMMUNITY-NOT JUST CONFINED TO LAND DEVELOPMENT AND WATER CONSERVATION/HARVESTING BUT ALSO TO ENHANCE LIVELIHOOD OPPORTUNITIES AND PRODUCTION SYSTEMS Vimarsh , The Consultancy Group – A Corporate Presentation . 3 WHY DPR? • VERY IMPORTANT AND CRUCIAL ACTIVITY • NEEDS ASSESSMENT RELATING TO LAND AND WATER • TRAINING NEEDS ASSESSMENT OF ALL STAKEHOLDERS • TO IDENTIFY THE BENEFICIARIES AND DOCUMENT THE SAME Vimarsh , The Consultancy Group – A Corporate Presentation . 4 DPR FACILITATION • REQUIRES STRONG PRA EXERCISE • COMMUNITY BE MADE AWARE OF PROJECT BY CONDUCTING AWARENESS CAMPS IN EACH VILLAGE BEFORE STARTING WORK FOR DPR Vimarsh , The Consultancy Group – A Corporate Presentation . 5 Key Requirements of Decentralized Planning under IWMP Participatory planning be undertaken at village level by the community itself; plans to reflect local specific needs addressed by local specific actions Participation of functionaries from PIA in developing implementation plans at various levels Vimarsh , The Consultancy Group – A Corporate Presentation . 6 Key Requirements of Decentralized Planning under IWMP • Watershed Committees/Village level committees be involved in planning and their capacity to be built to plan, own, manage and be accountable Vimarsh , The Consultancy Group – A Corporate Presentation . 7 Methodology for Decentralized Planning Building Capacity of Watershed Committee/Village level committees Initiating Bottom-up Planning at Village level; Vimarsh , The Consultancy Group – A Corporate Presentation . 8 Bottom-up Planning Bottom-up planning starting at village level • Participatory Planning • Active Participation of PIA, PRIs, Watershed Committees, WDT and village level committees. • Ensure convergence – Mainly MNREGA Vimarsh , The Consultancy Group – A Corporate Presentation . 9 Bottom-up Planning (2) Bottom-up planning starting at village level – Watershed Committees/Village level committees to appraise and approve the plan – Planning Tools such as needs assessment and plan templates, appraisal criteria etc. will be used – Prioritization of needs based on available allocations, with emphasis on needs of vulnerable populations/areas Vimarsh , The Consultancy Group – A Corporate Presentation . 10 PRE DPR ACTIVITIES BEFORE COMMENCING WORK FOR DPR CAPACITY BUILDING OF VARIOUS STAKEHOLDERS FORMATION OF WCs AND VILLAGE LEVEL COMMITTES, SHGs, UGs REGISTERATION OF WCs MANDATORY TO TAKE UP ENTRY POINT ACTIVITY TO CREATE RAPPORT WITH VILLAGE COMMUNITY Vimarsh , The Consultancy Group – A Corporate Presentation . 11 SECONDARY DATA REQUIREMENTS BEFORE COMMENCING WORK FOR DPR PIA TO MAKE FOLLOWING SECONDARY DATA AVAILABLE I. CONSTITUTION OF WATERSHED COMMITTEES AND ITS REGISTERATION II. FORMATION OF VILLAGE LEVEL COMMITTEES III. CONSTITUTION OF WDT IV. FORMATION OF SELF HELP GROUPS V. COPY OF PPRs VI. CADASTRAL MAPS OF WATERSHED VILLAGES VII. TOPO SHEETS VIII. NAME OF OFFICER DESIGNATED FOR ACCOMPANYING FACILITATING AGENCY TO WATERSHED VILLAGES FOR PLANNING PROCESS Vimarsh , The Consultancy Group – A Corporate Presentation . 12 ROLE OF STAKEHOLDERS PIA, WDT, WC, VILLAGE LEVEL COMMITTEES • TO ACTIVATELY PARTICIPATE IN PLANNING PROCESS AT EACH AND EVERY STEP AND ASSIST THE FACILITATING AGENCY FOR PREPARATION OF DPR Vimarsh , The Consultancy Group – A Corporate Presentation . 13 WHAT SHOULD DPR INCLUDE? BASIC INFORMATION OF PROJECT AREA: I. DEMOGRAPHIC FEATURES II. SOCIO ECONOMIC PROFILE III.PROBLEMS REQUIRING INTERVENTION IV.EXPECTED OUTCOME AND BENEFITS V. PROPOSED INTERVENTIONSPHYSICAL AND FINANCIAL Vimarsh , The Consultancy Group – A Corporate Presentation . 14 TEAM COMPOSITION – DPR PREPARATION BY VIMARSH TECHNICAL TEAM: • TEAM LEADER • PRINCIPAL COORDINATOR • CO PRINCIPAL COORDINATOR FIELD INVESTIGATION • FIELD INVESTIGATORS-TWO MEMBERS FOR EACH SUB WATERSHED Vimarsh , The Consultancy Group – A Corporate Presentation . 15 BRIEF PROFILE OF PROJECTS SANCTIONEDIWMP Sr.No. Project No. of No. of Treatment sub villages Area in ha watershe ds Project Cost in lacs 1 Hoshiarpur I 3 11 7887 946.44 2 Hoshiarpur II 2 9 6414 769.68 3 Hoshiarpur III 2 19 5200 624.00 4 Ropar I 6 44 11720 1406.40 5 Ropar II 2 14 2400 288.00 Vimarsh , The Consultancy Group – A Corporate Presentation . 16 STATUS – DPR PREPARATION Sr.No. Project No. of sub watershe ds Status-Baseline survey 1 Hoshiarpur I 3 Baseline survey completed in two sub watersheds. Commencing Baseline survey in 3rd watershed from 10th Jan.11 –Analyzing data-assessing needs 2 Hoshiarpur II 2 Commencing from 10th Jan.11 3 Hoshiarpur III 2 Baseline survey completed in all 19 villages-Analyzing dataassessing needs 4 Ropar I 6 Baseline survey completed in five sub watersheds-Analyzing dataassessing needs 5 Ropar II 2 Baseline survey completed in all villages-Analyzing dataassessing needs Vimarsh , The Consultancy Group – A Corporate Presentatiation. 17 THANK YOU VIMARSH, THE CONSULTANCY GROUP, CORPORATE OFFICE: 445, Phase III, Gurgaon - 122002 9417382181, 9417703147 Ph:0124-4264909/08, Fax: 0124-4264907 E-mail: admin@vimarsh.in Web: www.vimarsh.in Vimarsh , The Consultancy Group – A Corporate Presentation . 18