DPR PREPARATION
Under IWMP
PLANNING Process
and Resource
Requirements
IWMP MAIN:
OBJECTIVES
To restore:
Ecological
balance
by
harnessing, conserving,
and developing degraded natural
resources such as soil, vegetative
cover and water.
Vimarsh , The Consultancy Group – A Corporate Presentation .
2
IWMP - BROAD
OBJECTIVE:
OVERALL
DEVELOPMENT
OF
WATERSHED
COMMUNITY-NOT
JUST
CONFINED
TO
LAND
DEVELOPMENT
AND
WATER
CONSERVATION/HARVESTING
BUT
ALSO
TO
ENHANCE
LIVELIHOOD
OPPORTUNITIES
AND PRODUCTION SYSTEMS
Vimarsh , The Consultancy Group – A Corporate Presentation .
3
WHY DPR?
• VERY
IMPORTANT
AND
CRUCIAL ACTIVITY
• NEEDS ASSESSMENT RELATING
TO LAND AND WATER
• TRAINING NEEDS ASSESSMENT
OF ALL STAKEHOLDERS
• TO
IDENTIFY
THE
BENEFICIARIES
AND
DOCUMENT THE SAME
Vimarsh , The Consultancy Group – A Corporate Presentation .
4
DPR FACILITATION
• REQUIRES STRONG PRA
EXERCISE
• COMMUNITY BE MADE AWARE
OF PROJECT BY CONDUCTING
AWARENESS CAMPS IN EACH
VILLAGE BEFORE STARTING
WORK FOR DPR
Vimarsh , The Consultancy Group – A Corporate Presentation .
5
Key Requirements of
Decentralized Planning
under IWMP
 Participatory planning be undertaken at
village level by the community itself;
plans to reflect local specific needs
addressed by local specific actions
 Participation of functionaries from PIA
in developing implementation plans at
various levels
Vimarsh , The Consultancy Group – A Corporate Presentation .
6
Key Requirements of
Decentralized Planning
under IWMP
• Watershed Committees/Village
level committees be involved in
planning and their capacity to be
built to plan, own, manage and be
accountable
Vimarsh , The Consultancy Group – A Corporate Presentation .
7
Methodology for
Decentralized Planning
 Building Capacity of
Watershed
Committee/Village level
committees
 Initiating Bottom-up
Planning at Village level;
Vimarsh , The Consultancy Group – A Corporate Presentation .
8
Bottom-up Planning
Bottom-up planning starting at village level
• Participatory Planning
• Active Participation of PIA,
PRIs, Watershed
Committees, WDT and village
level committees.
• Ensure convergence – Mainly
MNREGA
Vimarsh , The Consultancy Group – A Corporate Presentation .
9
Bottom-up Planning (2)
Bottom-up planning starting at village level
– Watershed Committees/Village level
committees to appraise and approve the plan
– Planning Tools such as needs assessment and
plan templates, appraisal criteria etc. will be
used
– Prioritization of needs based on available
allocations, with emphasis on needs of
vulnerable populations/areas
Vimarsh , The Consultancy Group – A Corporate Presentation .
10
PRE DPR ACTIVITIES
BEFORE COMMENCING
WORK FOR DPR
 CAPACITY BUILDING OF VARIOUS
STAKEHOLDERS
 FORMATION OF WCs AND VILLAGE LEVEL
COMMITTES, SHGs, UGs
 REGISTERATION OF WCs MANDATORY
 TO TAKE UP ENTRY POINT ACTIVITY TO
CREATE RAPPORT WITH VILLAGE
COMMUNITY
Vimarsh , The Consultancy Group – A Corporate Presentation .
11
SECONDARY DATA
REQUIREMENTS BEFORE
COMMENCING WORK FOR DPR
PIA TO MAKE FOLLOWING SECONDARY DATA
AVAILABLE
I.
CONSTITUTION OF WATERSHED COMMITTEES AND
ITS
REGISTERATION
II. FORMATION OF VILLAGE LEVEL COMMITTEES
III. CONSTITUTION OF WDT
IV. FORMATION OF SELF HELP GROUPS
V. COPY OF PPRs
VI. CADASTRAL MAPS OF WATERSHED VILLAGES
VII. TOPO SHEETS
VIII. NAME OF OFFICER DESIGNATED FOR ACCOMPANYING
FACILITATING AGENCY TO WATERSHED VILLAGES FOR
PLANNING PROCESS
Vimarsh , The Consultancy Group – A Corporate Presentation .
12
ROLE OF STAKEHOLDERS
PIA, WDT, WC, VILLAGE
LEVEL COMMITTEES
• TO ACTIVATELY PARTICIPATE IN
PLANNING PROCESS AT EACH AND
EVERY STEP AND ASSIST THE
FACILITATING AGENCY FOR
PREPARATION OF DPR
Vimarsh , The Consultancy Group – A Corporate Presentation .
13
WHAT SHOULD DPR
INCLUDE?
BASIC INFORMATION OF PROJECT AREA:
I. DEMOGRAPHIC FEATURES
II. SOCIO ECONOMIC PROFILE
III.PROBLEMS REQUIRING
INTERVENTION
IV.EXPECTED OUTCOME AND
BENEFITS
V. PROPOSED INTERVENTIONSPHYSICAL AND FINANCIAL
Vimarsh , The Consultancy Group – A Corporate Presentation .
14
TEAM COMPOSITION –
DPR PREPARATION
BY VIMARSH
TECHNICAL TEAM:
• TEAM LEADER
• PRINCIPAL COORDINATOR
• CO PRINCIPAL COORDINATOR
FIELD INVESTIGATION
• FIELD INVESTIGATORS-TWO
MEMBERS FOR EACH SUB
WATERSHED
Vimarsh , The Consultancy Group – A Corporate Presentation .
15
BRIEF PROFILE OF
PROJECTS SANCTIONEDIWMP
Sr.No.
Project
No. of
No. of
Treatment
sub
villages Area in ha
watershe
ds
Project
Cost in
lacs
1
Hoshiarpur I
3
11
7887
946.44
2
Hoshiarpur II
2
9
6414
769.68
3
Hoshiarpur III
2
19
5200
624.00
4
Ropar I
6
44
11720
1406.40
5
Ropar II
2
14
2400
288.00
Vimarsh , The Consultancy Group – A Corporate Presentation .
16
STATUS – DPR
PREPARATION
Sr.No. Project
No. of sub
watershe
ds
Status-Baseline survey
1
Hoshiarpur I
3
Baseline survey completed in two sub
watersheds. Commencing Baseline
survey in 3rd watershed from 10th
Jan.11 –Analyzing data-assessing needs
2
Hoshiarpur II
2
Commencing from 10th Jan.11
3
Hoshiarpur III
2
Baseline survey completed in all 19
villages-Analyzing dataassessing needs
4
Ropar I
6
Baseline survey completed in five
sub watersheds-Analyzing dataassessing needs
5
Ropar II
2
Baseline survey completed in all
villages-Analyzing dataassessing needs
Vimarsh , The Consultancy Group – A Corporate Presentatiation.
17
THANK YOU
VIMARSH, THE CONSULTANCY GROUP,
CORPORATE OFFICE:
445, Phase III, Gurgaon - 122002
9417382181, 9417703147
Ph:0124-4264909/08, Fax: 0124-4264907
E-mail: admin@vimarsh.in
Web: www.vimarsh.in
Vimarsh , The Consultancy Group – A Corporate Presentation .
18