1.Preliminary model estimation and 2.Actual Model costing Prepared by: Assoc. Prof. Sr Dr. Mastura Jaafar PART A:Preliminary model estimation Is a cost estimation/planning for developing your model. Objective: To enable the design team to determine how much is needed for developing a model 1.Taking Off-To know the quantity of material, type of material and unit used. 2. Need to know the price of material-Where to get the price? Supplier Internet-CIDB website/JKR Contractor/consultant How to get the quantity of the materials? Model drawing and its specification-roof plan/floor plan/elevations. Information from the drawing:Type and size of material Connection Finishes-paint Examples Examples Examples Taking off sheet Waqf 4 Nos 100 Pcs Column 4” X 4” Concrete roofing tiles 20 Nos Timber 1” X 1” (300’ length) Costing estimations Material Labour Equipment Wastage Profit Basic elements Elements Element of Quantity Material Plywood, roofing material, nails, batten 1” X 2” etc Labour RM50.00/days/8 hours Wastage % according to the type of material Profit 10% from the overall model cost Equipment Saw, hammer, cutter, electric drill, (Based on actual market price) Cost Estimation Quantity of material X price (RM) =material price (M) Wastage (…..% from M)= W Labor= how many hours X how many people X rate/hour (RM) =L Equipment (buying)=E Profit (10% from {M+L+W+E} =P Total cost estimation = M+L+W+E+P To assess whether a balanced distribution of costs have been achieved amongst the various elements of the model. To provide comparison of costs of the preliminary estimation and actual costing Actual cost estimation based on weekly estimation. Students need to provide: 1. Preliminary model estimation2. Weekly model estimation-based on actual work done 3. Actual model costing=accumulative of weekly estimation with a report on costing comparison between 1 and 3. The actual model costing for the new project is ready. 1. Preliminary model estimation = RM1,500.00 2. Weekly model estimation-based on actual work done (could be different from PME either +/-) Week 1 =RM500.00 Week 2=RM1,200.00 3. Actual model costing based on work done =Week 1+Week 2=RM1,700.00 4.Cost Differences in estimation =RM 200.00 cost planning and actual PART C: ELEMENTARY ESTIMATION Objective: To propose estimation based each model elements. Task: Students need to provide estimation based on each model elements that are:1.Foundation/ground beam 2.Column 3.Floor 4.Wall 5.WallFinishes and 6.Column (The element list depending on each proposed model) 1. Preliminary model estimation = 29th Nov 2. Weekly model estimation=weekly report (together with other reports-A4)=29th Nov and 9th Dec 3. Actual model costing and Cost Differences = 9th Dec 4.Elementary estimation = 9th Dec.