Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010 Background background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion WC /WDM Strategy – CCT commitment to implementation • CCT 1st metro in SA to develop and implement • CCT only metro in SA with fully dedicated team for WDM – 10 year plan (2006-2016) – 5 specific goals – Wants to save 90 million m3/a by 2016/17 – Critical component of WC Water Supply Scheme – DWA wants to know Way Forward Background background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward CCT made an undertaking (pg 68 of Strategy document) “CCT will commit over the next five years to implementing and monitoring a comprehensive WC/WDM strategy. In such a time no decision should be taken regarding any further water augmentation scheme in order to verify the full potential of WC/WDM. After five years the full impact and potential of the WC/WDM must be clearly demonstrated by CCT and reevaluated. All assumptions made in the current analysis on the role of WC/WDM will be tested and adequately researched.” This report reflects the pro-active approach of CCT in monitoring and re-evaluating the strategy after 3 years of implementation Background background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion 5 Strategy Goals Action Plan Implement ation Goal Target A NRW<15% by 2010 Quantitative B Wastage < 2% of demand Quantitative E Demand growth < 1% Quantitative C Ongoing effective management systems and implementation of IWRP D Adoption of strategy as key deliverable for CCT Qualitative Qualitative Way Forward Progress Summary background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward Why measure progress? • Need to measure impact on WDM • DWA – if only achieving 50% success then will need new augmentation by 2015 • If not achieving need to understand why not • Need to know if re-alignment of Strategy is needed Progress Summary background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward What has been done? o Pressure management successful in 13 settlements including pressure reduction devices for 49 schools o1693 consumer meters audited o1775 meters fitted with automated meter reading devices o20 574 consumer meters replaced o17 998 consumer meters re-located & fixed o70 652 water connection leaks fixed oAdded 95 more treated effluent users which accounts for 80.5Ml/d of treated effluent use. Progress Summary background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion What has been done? (cont) – More than 50 000 households visited with Integrated Leaks Repair Project – 341 Caretakers trained to date – 41 Schools visited and leaks repaired – 160 Hlonipha Amanzi workshops with 14 813 participants – Water By-laws awareness campaigning – 5 workshops, 12 shopping mall promotions, Industry and commerce interventions Way Forward Budget & Expenditure Progress Summary background 160,000 Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion WC/WDM Strategy - Budget, Budget Revisions & Actual Expenditure 140,000 120,000 (R000's) 100,000 80,000 60,000 40,000 20,000 0 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/2017 Original Budget in Strategy Amended Budget Actual Expenditure Way Forward Budget & Expenditure Progress Summary background Budget & Expenditure Savings Realised Demand Projections Targets Achieved Way Forward Conclusion WC/WDM 10 Year Strategy Cumulative Budget and Expenditure 800,000 700,000 500,000 400,000 300,000 200,000 Amended Budget Original Budget Actual Expenditure 2016/2017 2015/16 2014/15 2013/14 2012/13 2011/12 2010/11 2009/10 0 2008/9 100,000 2007/8 R (000's) 600,000 Budget & Expenditure Progress Summary background Budget & Expenditure Savings Realised Demand Projections Targets Achieved Way Forward Conclusion 60 140000 50 120000 80000 30 60000 20 40000 10 20000 Expected Savings (Ml/d) Original Budget 2016/2017 2015/16 2014/15 2013/14 2012/13 2011/12 2010/11 2009/10 0 2008/9 0 Amended Budget R 000's 100000 40 2007/8 Ml/day WC/WDM Strategy Budget and Anticipated Water Savings To answer the question one needs to do an assessment of water savings and growth projections Savings Realised background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward Impact of the Strategy depends on: 1. The actual savings realised through the Strategy Including abating demand growth 2. Unconstrained growth in water demand What demand would have been if we have done Savings Realised background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Way Forward Conclusion Expected vs. Reported Savings Expected Savings (Ml/d) Reported Savings (cumulative) 2016/2017 2015/16 2014/15 2013/14 2012/13 2011/12 2010/11 2009/10 2008/9 350 300 250 200 150 100 50 0 2007/8 Ml/day (cumulative) Conservative Assessment (only savings from Goal A and E) 2029/2030 2027/2028 Conclusion 2025/2026 2023/2024 600 2021/2022 Targets Achieved 2019/2020 2017/2018 2015/2016 Demand Projections 2013/2014 200 2011/2012 2009/2010 2007/2008 2005/2006 Savings Realised 2003/2004 2001/2002 700 1999/2000 Budget & Expenditure 1997/1998 1995/1996 1993/1994 1991/1992 Progress Summary 1989/1990 300 1987/1988 400 1985/1986 background 1983/1984 1981/1982 1979/1980 1977/1978 Mm3/a Demand Projections Way Forward 900 Water Demand Projection versus Actual Demand 800 "Do nothing" scenario HWR 500 Actual Demand LWR 100 0 Demand Projections background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward WC/WDM Strategy Table 10-6 Impact of WC/WDM No WC/WDM Sustaining efficiency from restrictions 10 yr WC/WDM Strategy Year new supply augmentation will be needed LWR HWR 2016 2008 2020 2013 2051 2026 Demand Projections background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward Reported Demand Growth Rate on Bulk Water Treated 5.0% 4.5% 4.0% 3.5% 3.0% average annual growth in demand 2.5% 2.0% 1.5% 1.0% 2006/2007 2007/2008 2008/2009 2009/2010 Demand Projections Progress Summary background Budget & Expenditure Savings Realised Demand Projections Targets Achieved Way Forward Conclusion Demand Projection without WDM measures 360 350 no WDM Strategy implementation 4.75% growth p.a. HWR Mm3/a 340 330 320 310 300 Actual LWR 290 280 2006/2007 2007/2008 2008/2009 2009/2010 Achievement of Targets background Progress Summary Action Plan Implementation Goal Budget & Expenditure Savings Realised Demand Projections Targets Achieved Target A NRW<15% by 2010 B Wastage < 2% of demand E Demand growth < 1% C Ongoing effective management systems and implementation of IWRP D Adoption of strategy as key deliverable for CCT Conclusion Way Forward Actual (2008/9) 25.37% Cannot measure Average annual demand growth for v 3 yrs is 2.98% For 2009/10 – 1.65% Qualitative Qualitative Achievement of Targets: Goal A-NRW Progress Summary background Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward % of bulk water treated 30% 25% 20% 15% 10% 5% 0% 2006/7 2007/8 Bulk NRW Reticulation NRW 2008/9 Overall NRW 2009/10 Achievement of Targets: Goal A-NRW background Progress Summary Year Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Bulk NRW Reticulation NRW Overall NRW As % of bulk water treated 2006/7 3.59% 15.77% 19.36% 2007/8 7.58% 12.64% 20.22% 2008/9 6.89% 16.42% 23.30% 2009/10 8.19% 17.17% 25.37% Way Forward Authorised Consumption 717.25 Ml/d Water Losses 189.78 Ml/d System Volume Input 907.02 Ml/d IWA Balance 2009/10: Units Ml/day Billed Authorised Consumption 676.92Ml/d Unbilled Authorised Consumption 40.33Ml/d Apparent Losses 83.84 Ml/d Billed Metered 676.92 Ml/d Billed Unmetered 0 Ml/d Potential Revenue Water 552.02 Recovered Revenue Non-Payment Unbilled metered 7.98 Ml/d Unbilled unmetered 32.44Ml/d Unauthorised consumption 9.59 Ml/d Customer Meter Inaccuracies 74.25 Ml/d Leakage on mains Real Losses 105.94 Ml/d Free Basic Water Leakage on storage tanks Leakage on service conn. Non-Revenue Water 230.1 Ml/d Achievement of Targets: Goal A-NRW background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward 100 90 80 70 60 50 40 30 20 10 0 Expected Savings 2016/2017 2015/2016 2014/15 2013/14 2012/13 2011/12 2010/11 2009/10 2008/9 CCT Reported Savings Achieved 2007/08 Ml/day Expected and Reported Savings - Goal A Achievement of Targets: Goal B-Wastage background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Reducing wastage to less than 2% of demand No data to measure savings… Way Forward Achievement of Targets: Goal E-Reducing Growth Rate Progress Summary background Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Expected and Reported Savings - Goal E 70 60 40 Expected Savings 30 20 Reported Savings Achieved 10 2016/2017 2015/2016 2014/15 2013/14 2012/13 2011/12 2010/11 2009/10 2008/9 0 2007/08 Ml/day 50 Way Forward Achievement of Targets: Goals C & D background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward Qualitative targets requiring a qualitative assessment Achievement of Targets background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward Most significant findings: • Population growth rate used might be too low (1.61% (CCT) vs. 3.49% (StatsSA) • Use of uniform cost for unit leakage can be improved Achievement of Targets Progress Summary Ml/day background Budget & Expenditure Savings Realised Demand Projections Targets Achieved 950 900 850 800 750 700 650 600 550 500 2006/7 Conclusion Way Forward water billed Bulk Water Treated water supplied to reticulation Discharge to Sewer System 2007/8 2008/9 2009/10 Conclusion background • • • • Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward CCT has done what the Strategy said and more in the past three years and needs to continue with similar monitoring and evaluation processes. As expected significant savings have realised and projects and actions re WC/WDM need to continue with even more resources committed. Concern identified– demand growth still higher than expected 2 questions that need answers: Conclusion background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion “Yes”, on the savings that have been verified and “possibly” on savings yet to be verified Way Forward Conclusion background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward “YES” if the strategy is realigned and even more support is given to achieve this Way Forward – 5 Steps background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion • STEP 1: Accuracy of bulk meters needs to be verified and confidence intervals given • STEP 2: Report NRW according to IWA Water Balance. Improve accuracy of estimated components of the IWA water balance • STEP 3: Understand why the growth rate in potable water demand so much higher than expected. Define (and quantify if possible) parameters influencing demand growth. Way Forward Way Forward – 5 Steps background Progress Summary Budget & Expenditure Savings Realised Demand Projections Targets Achieved Conclusion Way Forward • STEP 4: Revise projected growth demand and realign strategy targeted savings. Involves extensive resource planning . Do cost-benefit model that answers augmentation planning objectives optimising cost-benefit options. Revise the current method of unit demand reduction for unit cost. • STEP 5: Establish annual independent monitoring and assessment of strategy target achievements, and align it with the DWA toolkit THANK YOU! ANY QUESTIONS?