What happens? 2013.02.07 Unexpected noisy alarm due to fan fail QuickTime™ and a H.264 decompressor are needed to see this picture. Broken fuse parts 2013.03.20 Noisy alarm is still there due to fan fail QuickTime™ and a H.264 decompressor are needed to see this picture. NIM modules can not be put into the 1st and 12th slots. QuickTime™ and a H.264 decompressor are needed to see this picture. 2013.03.21 It will start building the floor and then room. 내부용 항목 no ’13. 1Q 2 1 License 계약 체결 2 100 x 100 제작 및 QC 검증 3 2Q 4 5 3Q 6 7 8 ‘14.1Q 4Q 9 10 11 12 1 2 2Q 3 4 5 3Q 6 7 8 4Q 9 10 11 12 - GEM Foil 제작환경 구축(System/Utility 재구축) - 원재료 확보(FCCL 및 chemical for kapton etch) - 시제품 제작 - 한국 CMS(시립대) QC 검증 with 100x100 시제품 - 100x100 시제품 CERN QC 검증 3 100 x 100 제품 양산 및 300 x 300 R&D Production start: 2013. 9월 - 100x100 양산 (한국 CMS/CERN 요청물량) - 300x300 시제품 제작 - 한국CMS/CERN 300x300 시제품 QC 검증 4 300 x 300 양산 및 500 x 500 R&D Production start: 2014. 11월 - 300x300 양산 (한국 CMS/CERN 요청물량) - 500x500 시제품 제작 - 한국CMS/CERN 500x500 시제품 QC 검증 외부용 항목 no ’13. 1Q 2 1 License Agreement 2 100 x 100 Fabrication and QC Validation 3 2Q 4 5 3Q 6 7 8 ‘14.1Q 4Q 9 10 11 12 1 2 2Q 3 4 5 3Q 6 7 8 4Q 9 10 11 12 - Rebuild equipments/utility for GEM Foil - Prepare raw materials(FCCL, mixed chemical) - develop the prototype - QC validate the prototype @KOREA - QC validate the prototype @CERN 3 100 x 100 Routine and standard production , 300 x 300 R&D Production start: Oct. 2013 - 100 x 100 routine & standard production - develop the prototype of 300 x 300 - QC validate the prototype @KOREA/CERN 4 300 x 300 Routine and standard production , 500 x 500 R&D - 300 x 300 routine & standard production - develop the prototype of 500 x 500 - QC validate the prototype @KOREA/CERN Production start: March. 2014 내부용 Picture of GEM (Mecharonics)