What happens?
2013.02.07
Unexpected noisy alarm due to fan fail
QuickTime™ and a
H.264 decompressor
are needed to see this picture.
Broken fuse parts
2013.03.20
Noisy alarm is still there due to fan fail
QuickTime™ and a
H.264 decompressor
are needed to see this picture.
NIM modules can not be put into the 1st and
12th slots.
QuickTime™ and a
H.264 decompressor
are needed to see this picture.
2013.03.21
It will start building the floor and then
room.
내부용
항목
no
’13.
1Q
2
1
License 계약 체결
2
100 x 100 제작 및 QC 검증
3
2Q
4
5
3Q
6
7
8
‘14.1Q
4Q
9
10 11 12
1
2
2Q
3
4
5
3Q
6
7
8
4Q
9
10 11 12
- GEM Foil 제작환경 구축(System/Utility 재구축)
- 원재료 확보(FCCL 및 chemical for kapton etch)
- 시제품 제작
- 한국 CMS(시립대) QC 검증 with 100x100 시제품
- 100x100 시제품 CERN QC 검증
3
100 x 100 제품 양산 및 300 x 300 R&D
Production start: 2013. 9월
- 100x100 양산 (한국 CMS/CERN 요청물량)
- 300x300 시제품 제작
- 한국CMS/CERN 300x300 시제품 QC 검증
4
300 x 300 양산 및 500 x 500 R&D
Production start: 2014. 11월
- 300x300 양산 (한국 CMS/CERN 요청물량)
- 500x500 시제품 제작
- 한국CMS/CERN 500x500 시제품 QC 검증
외부용
항목
no
’13.
1Q
2
1
License Agreement
2
100 x 100 Fabrication and QC Validation
3
2Q
4
5
3Q
6
7
8
‘14.1Q
4Q
9
10 11 12
1
2
2Q
3
4
5
3Q
6
7
8
4Q
9
10 11 12
- Rebuild equipments/utility for GEM Foil
- Prepare raw materials(FCCL, mixed chemical)
- develop the prototype
- QC validate the prototype @KOREA
- QC validate the prototype @CERN
3
100 x 100 Routine and standard production , 300 x 300 R&D
Production start: Oct. 2013
- 100 x 100 routine & standard production
- develop the prototype of 300 x 300
- QC validate the prototype @KOREA/CERN
4
300 x 300 Routine and standard production , 500 x 500 R&D
- 300 x 300 routine & standard production
- develop the prototype of 500 x 500
- QC validate the prototype @KOREA/CERN
Production start: March. 2014