New Plant Configuration Management Development and Implementation Process John Maciejewski INPO New Plant Configuration Management Development and Implementation Process Issued AP-932 “New Plant Configuration Management Development and Implementation Process” in November 2009 as Preliminary Process document that provides flexibility in how to implement New Plant Configuration Management Development and Implementation Process Plan to issue AP-932 as final in 2010 Plan to expand AP-932 to cover CM during operation considering : The 3-D model Computer technology AP-929 New Plant Configuration Management Development and Implementation Process Reasons for development: INPO AP-929 developed based on modifications/changes to an existing plant Extensive use of computer technology for new plant deployment Benchmarking international projects revealed significant use of computer technology in providing CM Recommendations from several CNO’s Use by other industries of relational databases to control information New Plant Configuration Management Development and Implementation Process Document sections: Configuration management program attributes Process description is for new plant deployment (not operation) Includes incorporating information needed for operation and a description of linking information using relational databases New Plant Configuration Management Development and Implementation Process Concepts CM development starts early in the design phase Design is essentially complete prior to construction Computer technology is used extensively in design ( 3-D model, data bases) Computer technology supports development of a detailed design that can be built. The plant is built as designed. Changes are only made because of errors in design. New Plant Configuration Management Development and Implementation Process CM attributes for pre-commercial operation A listing of CM attributes for design and construction that will enable establishment of effective CM New Plant Configuration Management Development and Implementation Process Process elements: Determine CM scope and information Establish an electronic platform and standard format Electronically link related information Enter information into the computer Produce information for construction Build the plant per the design (correct errors only) Turnover the computer databases and physical plant to COL holder New Plant Configuration Management Development and Implementation Process Using the component designator as the common relationship Using a common electronic platform/framework, design information can be linked electronically to the related components and other related information using the component designator. For example the component designator (e. g., MOV-XX) is the common relationship for relating information. Design information and information based on design information should be linked. New Plant Configuration Management Development and Implementation Process SUMMARY INPO issued AP-932 “New Plant Configuration Management Development and Implementation Process” in November 2009 Concepts are based on CM lessons learned and recent benchmarking Incorporates computer technology as a tool for CM Plan to issue AP-932 final in 2010 Plan to expand AP-932 to cover CM during operation