Group Members: Justin Fleischmann, Christian Pitts, Kathy Thompson February 23rd, 2012 1 Objectives Problem Statement Motivation Background Information Statement of Work Preliminary Data Final Data (Survey) Final Data (Design) Justified Budget 3 4 5 6 8 10 12 17 19 2 • Help improve recreational and intramural facilities at the University of Pittsburgh – Gather input/suggestion from current students • Help modernize Trees Hall – Gather input/suggestion from current students • Propose a new floor design for the large gym at Trees Hall – Target seating and item storage 3 • Pitt’s Recreational Facilities: – Some are outdated – Lacking facilities possessed by other comparable universities • Within Trees Hall (Large Gym): – No storage space for personal belongings – Broken bleachers • No seating for people watching game • No seating for people waiting to play 4 • Facility Improvement – Offer input on improvement of facilities – Affecting their own university experience – Offering direct input of their ideas • Prospective Students – Better facilities – University offers more • Maintenance of Trees Hall – – – – Main gym is outdated Bleachers useless and broken Possible additions / improvements More efficient floor plan 5 Current Recreational Facilities at Pitt • Baierl Fitness Center in Petersen Events Center – Weight Room/Fitness Center – Four Racquetball Courts – Two Squash Courts • Cost Sports Center – Indoor Field – Outdoor Turf Mini Fields • Fitzgerald Field House – Indoor Track – 2 Squash Courts Baierl Fitness Center • Campus Dorms – Small Fitness Centers 6 • Trees Hall (Most important to the project) – – – – Weight Room and Fitness Center Olympic-sized Pool and Recreational Pool Racquetball Courts Large Sports Gym • Basketball/Volleyball Courts • Rock-Climbing Wall • Golf Practice Area • Bellefield Hall – Weight Room – Sports Gym – Indoor Pool Trees Hall 7 • Initial Tasks – First Client Meeting – Research – Proposal • Survey (Online Software) – Questions • Compile • Present • Apply Feedback – Distribution • Advertising • Collecting / Applying Results 8 • Large Gym Design – Collection of Data • Dimensions • Building Codes – Floor Plan Design • Consult student input – Numerical Survey Results – Student Comments Dance Class in Trees Gym • Most efficient floor plan 9 • Penn State University, University Park – Several Gyms, Fields, Courts, and an ice rink • Ohio Wesleyan University – Most popular – Indoor Tennis and basketball courts – Outdoor soccer fields, Campus Gym also popular • Ithaca College – Similar to Pitt’s facilities – Most popular is main fitness center • Penn State University, the Behrend College – Limited Weightlifting facilities – Many indoor options – basketball, soccer, etc. 10 • Denison University – Main fitness center is, again, very popular – Desire for an ice rink • Michigan State University – Similar facilities to Penn State – Indoor Basketball courts are very heavily used • University of Maryland, College Park – Only one outdoor soccer field – Seven Total Basketball Courts (4 indoor, 3 out) • St. Mary’s College of Maryland – Many fitness centers and outdoor fields – Three multi-purpose courts 11 • Baierl Weight Room most widely-used • Dorm Fitness Centers also frequently used • Trees Hall used 3rd most often for basketball, racquetball, and the weight room • Bellefield used infrequently 12 • Trees needs improvement more than other facilities • Baierl needs very few modifications • Cost received many “Needs no Improvements” votes, but still received an average score 13 • Weight Room, Basketball Courts, and Racquetball Courts need improvement at Trees • Outdoor Fields at Cost received positive reviews • Facilities in Baierl need almost no improvements 14 • Weight Room and Sports Gym At Bellefield are outdated • Indoor Track could use improvement, but the FH is not widely used • Leisure Pool and Weight Rooms would be most beneficial, according to students 15 16 Golf Practice Area/Rock Wall 17 • Additions – Cubbyholes for storage – 3-tiered retractable bleachers • Complies with building safety codes 18 Item Cost Quantity Total Jolly Ranchers candy bag $2.99 2 $5.98 SELECT SurveyMonkey account $24/month 1 month $24.00 GRAND TOTAL: $29.98 upgrade • All further supplies had no cost • No budget for facility improvements – Unsure which changes will be made – Costs of different improvements will vary 19