Gear Drive Flo-tap Installation Instructions Quick Installation Guides: 00825-0400-4809 rev. EA – 485 Flanged Flo-tap 00825-0500-4809 rev. DB – 485 Threaded Flo-tap 00825-0200-4585 rev. AA – 585 Flanged Flo-tap Nomenclature Instrument Connections Lift Rings Top Plate Gear Drive Plate Gear Box Rod Protectors Full Port Isolation Valve Weld the Mounting Hardware Onto the Pipe Threaded Flo-tap Flanged Flo-tap Tack Weld the Mounting Hardware with 4 Equal Length Tacks Tack weld anywhere on the mounting hardware Then again directly across from the first tack weld Then on the other 2 sides 3 1 2 Check to See that the Mounting Hardware is Level and Square If it’s not, use a rubber mallet to lightly adjust the hardware and recheck Verify that the ODF Dimension Matches What is Listed in the QIG The ODF is the dimension from outside pipe diameter to face of flange 485 585 Verify that the ODF Dimension Matches What is Listed in the QIG The ODF is the dimension from outside pipe diameter to face of flange For Threaded Flo-tap the dimension from the pipe OD to the top of the threadolet is called LMH: 485 Sensor Size 1: 1.38-in. (35 mm) 485 Sensor Size 2: 1.56-in. (40 mm) 485 Sensor Size 3: 2.06-in. (52 mm) Complete a Continuous Weld Around the Perimeter of the Unit Attached the Full Port Valve to the Mounting Hardware Threaded Flo-tap Flanged Flo-tap First, thread the guide nipple into the mounting then thread the valve ODV The valve stem should be in-line with the pipe so it will not interfere with the insertion rods The valve must be a full port valve to allow the Annubar to pass through the valve into the pipe Verify the ODV Dimension The ODV is the dimension from the outer diameter of the pipe to the top of the valve Flo-tap / Flange Rating 485 Sensor Size 585 Sensor Size ODV Dimension 1 --- 7.51-in. (190.9 mm) 2 --- 8.17-in. (207.5 mm) ANSI 150 # 1 11 10.5-in. (266.7 mm) ANSI 300 # 1 11 11.75-in. (298.5 mm) ANSI 600# 1 11 14.06-in. (357.2 mm) ANSI 150 # 2 22 11.25-in. (285.8 mm) ANSI 300 # 2 22 13.00-in. (330.2 mm) ANSI 600# 2 22 16.38-in. (416.0 mm) ANSI 150 # 3 44 12.75-in. (323.9 mm) ANSI 300 # 3 44 16.25-in. (412.8 mm) ANSI 600# 3 44 19.50-in. (495.3 mm) Threaded Drill the Hole by Using a Hot Tap Drilling Machine Guide Ring in Rosemount Supplied Mounting Hardware Tag with correct drill hole size attached to the Annubar After the Hole is Drilled, Retract the Drill Past the Valve and Close the Valve Vent drilling machine and remove the per manufacturers and site procedures Threaded Flo-tap Flanged Flo-tap Remember that the hot tap drilling machine is under pressure and exposed to the process fluid Attach the Fully Retracted Flo-tap Assembly to the Valve Threaded Flo-tap Attach the Fully Retracted Flo-tap Assembly to the Valve Flanged Flo-tap – Use a hoist strap and crane if needed Quickly Open and Close the Valve to Pressurize the Annubar, Check for Leaks If Leaks are Present, Tighten the Packing Gland Nuts Attach Rod Protectors Caution During Insertion During insertion, the top plate can twist due to the torque of the gear drive. To keep the Annubar from twisting, hold the top plate in place during Gear Drive insertion. Plate Top Plate Shown twisted ~90° from Gear Drive Plate Top Plate and Gear Drive Plate should remain parallel during insertion If Using a Drill for Insertion, Attach the Drill to the Insertion Mechanism Do not exceed 200 RPM on the Drill Insert the Annubar Stop the drill and crank by hand once the orange stripes reach the Gear Box Plate Continue to Insert the Sensor with the Manual Crank Place a finger above the packing gland to feel for full insertion CAUTION: Be careful if doing this with steam or other harmful fluids When movement stops, the Annubar is fully inserted Turn the handle an additional ½ turn to ensure it is fully inserted Insert the Drive Lock Pin to Secure the Sensor in Place Tighten the Nuts to the Gear Box Plate and Loosen ¼ turn This gives an indication of full insertion if the Annubar is retracted at a later date. Retighten the Packing Gland Nuts