Rotek and Roshcon Khoro Project Sponsor Update Project Sponsor: Joe Mazibuko Project Manager: Patrick Letsatsi Capabilities Date: 12 Aug 2013 Agenda • Project Status • High Level timelines • Accomplishment • Risk and Mitigations • Next Reporting Period Project Status • RR Executive workflow - 100 % complete. At the later stage access to the Work Flow was revoked with the decision from the Project Manager. • Mancom and Board pack FRS document – 95 % completed, due to slate solution inclusion in the URS, the execution of the deliverable was stopped by the Project Manager, after being informed that the request form submitted to Khoro for Mancom and Board pack solution was rejected. • Governance Addendum Document is 95 % complete, awaiting for contents from the Mock-up page. • Intranet Mock-up page to be presented to the Client; RR Change Management (Rene Trevors and Ben Zwarts), the clients already has access to the Page, both trained as Site Owners and Champion. • SharePoint Facilitator Resource no longer needed, the activities for this Resource are mainly on Collaboration Page which only starts in November. Building High Performance Group IT High Level timelines July 13 Month Week 05 12 19 26 02 09 16 Sep 13 23 Project Documents 06 13 20 27 04 11 18 25 Fixed Activities • Intranet and Collaboration pages FRS Documents 30 Oct 13 Indicators Activities/ Deliverables Aug 13 • Project Charter • Steercom Term of Reference Doc • Capabilities Doc • Governance Addendum Doc 95 % complete Iterative Activities Focused Products: • RR Intranet Page (Product) • Site Owner Training • FRS Approved by Khoro • Functional Design Spec Doc • Build • Technical Design Spec Doc Complete • Mock-up Page (product) 95 % complete; awaiting approval • Deployment Guide • Integrated Testing Month End • Deployment Environment • UAT • Intranet Page Launch • Post Mortem End of the Week • RR Community Awareness Accomplishment • Capability Listing complete • Intranet Mock-up page complete • Functional Requirement Specification approved by Khoro • Received Intranet time lines from Khoro Project • Eskom Khoro Draft Communication Plan for RR Stream complete • Site Owners for RR Intranet page - trained • Received Mock-up page link: http://khoroqa.eskom.co.za/sites/rr/Pages/Default.aspx Building High Performance Group IT Risk Table Project Manager(s): Patrick Letsatsi Identification No. 1 Risk/Issue Incorrect AD information. Client: Joe Mazibuko Assessment Impact Impact (1-5) Minor 2 Strategy Probl t Weight (1-5) 2 Project : Khoro Mitigation HR Organizational Project to clean up Minor employees job profile is currently in place. Control Log Date Run Out Status Date (G,O,R) 01/ Oct 30/09/20 /12 13 O Owner OD & Remuneration Manager : Ntsikie Mabona Next Reporting Period • Intranet Page progress • Change Management Plan • Amended Project Charter • Intranet Page launch proposed date Building High Performance Group IT