SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, chemical injection systems. 26 standards in revision or newly created, 4 published and one SR3 to submit Completion Equipment Documents – • • • • • • • • • • 14A – SCSSVs - recently published 14B – SSSV installation – ballot complete in resolution – publish Q2 2015 14L – SR3 submitted for next revision – HPHT requirements + updating 11D1 – Packers and Bridge Plugs – projected to publish in Q1 2015 19A – Completion Accessories – adopt-back of ISO 14998 – initial ballot in Q2 2015 19S – Sand Screens – adopt-back of ISO 17824 – initial ballot in Q3 2015 19L – Liner Hangers – in process – potential publication in 2016 19 TT1 – Downhole Well Test Tools – 95% complete – ballot in Q1 2015 19 OH – Openhole Isolation Equipment – New- two mtgs 19 CI – Chemical Injection Valves – New- three mtgs SC19 report to SC18 January 2015 Gas Lift Equipment Documents – • • • • • • • • • • • • Gas-Lift Handbook – replaces 7+ RPs – plan to publish in Mid 2016 19 G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope 19 G2 – Flow control devices – Ballot underway, 19 G3 – Run/pull/KOT/latches for SPM flow controllers, published 19 G4 – Practices used with SPM equipment, published 19 G5 – Operations Maintenance of GL - SR3 was approved, work progressing 19 G6 – Design of installations using IPO valves – 97% complete – initial ballot Q3 2014 19 G10 - Design and Operation of Intermittent Gas-lift – Review 90% complete, ballot by Q2 2015 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot, resolving comments 19G12 – Gas-lift Automation – 30% Complete 19 G13– HP Gas-lift – 20% on hold 19 G14 – Liquid unloading of gas wells –05% SC19 report to SC18 January 2015 Perforating Documents – • • • • • • • • 19B – Perforators – Revising by section 19B1 – Evaluation in Concrete Targets – Ready for ballot 19B2 – Evaluation under stress – Released 19B3 – Evaluation at temperature – In Process 19B4 – Evaluation of Flow Performance – Revision complete 19B5 – Debris Evaluation – Draft complete 19B6 -- Gun Swell – Ready to publish RP67 – Explosive Safety – revising entire document (just beginning, divided in 11 Task Groups) SC approved SR3 for 14L Locks and Landing Nipples to be presented to CSOEM for approval after SC 19 review and editing