Study visit in Northern Sweden and Western Finland 24-­‐25 November 2014 Kurt Stenvall kurt.stenvall@jeppokraC.fi www.jeppobiogas.fi Shareholders Jeppo Biogas Ab • • • • • • • • Jeppo Kra3 Andelslag Snellman Ab Nyko Frys Ab Jeppo PotaCs Ab Torp Frys Ab Norcar-­‐BSB Ab Finespo Ab Fresh Servant Ab 35 % 22,5 % 10 % 10 % 10 % 5 % 5 % 2,5 % Jeppo Biogas: Process Pipe gas Boiler / CHP Pig sludge TS 4 % Pig sludge TS 4 % Green TS 20 % Other TS 20 % Reception / pre-treatment Flare Biogas Pre-treatment MultiMix Digesters Hygienisation Biogas upgrading Vehicle CNG Biogas compression Tank CNG Solids separation Humic material Concetrate Storage Liquid fertilizer Waste material © 2014 Jarno Laitinen | Vaasa Energy Week 18.3.2014 – Biogas, a bridge between agriculture and industry | Slide 3 Layout Planerade råvarufrakConer Cll rötningen Planned input feedstock Svinsväm Nötkreatursslam Pälsdjursgödsel Förbehandlingsslam från pot.förädling Skalrester från potatisförädling Hårslam från läderindustrin Livsmedelsindustrislam Livsmedelsavfall Mag- och tarminnehåll Slam från reningsverk Slam från fettavskrapning Gräs och halm SAMMANLAGT Antal ton/ år Kapacity t/a 47 500 9 000 8 000 4 000 3 000 2 500 96 53 7 744 140 3 500 4 000 89 533 Pig slurry Cow slurry Fur animal manure Potato waste sludge Potato peel waste Hair sludge fr. leatherind. Bakery waste sludge Bakery waste solid Stomach- and gut cont. Sewage sludge fr. foodind. Flotation fat Grass and straw Pipelines Pipelines for slurry from 4 piggeries • Slurry transported by pipeline appr. 50 000 m3/v. • Pipelines 12 km Ø Ø Ø Ø Ø Jeppo PotaCs-­‐Biogas 3,1 km Lantgris-­‐Biogas 4 km Bäriholm-­‐Biogas 0,7 km Blåmans-­‐Biogas 1,7 km Karlsborgs Gård-­‐Biogas 1,8 km • Gas pipeline 2x160 mm for lokal industry 4 km Recieving pit for dry substrates Energy efficient heat recovery Scancool Oy heatpumps 2x350 kW heat power HygienisaCon 3x10 m3 Hot water accumulators 3x10 m3 GasproducCon and -­‐consumpCon Energy producCon • 3,5...4 MNm3 raw biogas appr. 70 % methane+30 % carbondioxide • Energy Energy sales • KWH Mirka 5...10 GWh/year • Oy Snellman Ab 10 GWh/year appr. 20...25 GWh/year • Traffic fuels 1...5 GWh/vuosi ( 5 GWh compares to 590 000 gasoline litre ekvivalents or about 400 cars yearly • Heat power consumpCon) appr. 2,5 MW • Plant heat demand produced by heatpumps 2x350 kW. • Heat recovery opCmised. • 800 kW gas/oil burner for peak/reserve 4 km gas pipeline PEH 2x160 mm Upgrading unit and compressor 400/260 Nm3/h 250 bar Reciewing-­‐/processhall and upgrading Digesters, upgrading unit and compressor unit Transpordacility for biomethane 5045 Nm3/container 250 bar Gascontainers for CBG-­‐transport to customer in Pietarsaari Dispenser for CBG What is in sight for the near future ? Raw material for digestate o More slurry from piggery o Manure from fur animal o More greenmasses from non-­‐ food agriculture o More slaughtery waste More rawmaterials-­‐>one or two more digesters-­‐>more digestate as ferCliser need to be transported o Need to concentrate the ferCliser due to longer transports. o In the best of worlds even a small income from the ferCliser (in the future). More feedstock-­‐>more gas • A few more fuel staCons in the near region • More heat for the industry, • New customers • LBG for longer transports or for export Major co-­‐operators during construcCon and building • Biogas plant o Weltec Biopower Gmbh: designing, delivery and assembly of biogasmachinery o Doranova Oy: planning, design and project coordinaCon, some machinery deliveries o Local construcCng companys: recieving-­‐ and processbuilding, digesterbases, slurry-­‐ and digestate tanks, all other construcCon works o VenClaCon, water, heat and electrical/ automaCon by local entrepreneurs. o Ground-­‐ and excavaCon works by lokal entrepreneurs o GS-­‐Consul<ng: project coordinaCon o Marinex Ab: lay-­‐out, design and controller Upgradingunit from Malmberg Water Ab Compressor from Fornovo Gas S.r.l Gascontainers from Luxfer Gas Cylinders Boiler from Robert Bosch Gmbh Dispenser from NPS Service Ab HÖYRYTYS OY coordinator of items above Main automaCon designed by Insta Automa<on Oy • Pipelines delivered by UPONOR OY, excavaCon works by lokal entrepreneurs. • Pumping staCons at piggeries delivered by Grundfos Oy • Heatpumps and heaCng from Scancool Oy • • • • • • •