2030 Smart Boards Coffs Harbour 2030 Coffs Harbour City Council 2030 Smart Boards 6+ years of getting the design right by finally closing the loop! We operate and maintain Design IPWEA Award Winning Feedback Design/Tender discussions with Andrew Sales & Andrew Gray Introduction • Product range – – • The flawed process – • The tender process An effective design – • Series 1 Series 2 (Type1, Type2, Type3) Product design The benefits – – Capital cost savings Operating cost/time savings Product Range (Pump Stations) • Series 1 (Generation 3) – 1kw to 15kw • High quality 316 S.S Cabinets • Integrated soft starters • Half I/O Enet • Integrated stand • Rear mounted CE • Generator changeover • Compact Design • Antenna mounting Product Range (Pump Stations) • Series 2 Type 1 (Generation 3) – 15 to 22kw (45kw Single pump run) • High quality 316 S.S Cabinets • All in one design • VSD design • Integrated CE board • Externally Cooled Product Range (Pump Stations) • Series 2 (Type 2) (Generation 3) – 22KW to 75KW • High quality 316 S.S Cabinets • High quality CB chassis • VSD design • Separate CT metering • Up to 630 Amps • Externally Cooled Product Range (Pump Stations) • Series 2 Type 3 (Generation 3) – 90KW to 160KW • High quality 316 S.S Cabinets • High quality MCCB Chassis • VSD design • Separate CT metering • Up to 630 Amps The Flawed Process Design Tender Tender Review Tender One off design Low Qty price 20% more Award Tender Pay 87% more Civil Contractor 20% mark up 30% mark up Elect Contractor Generation 0 switchboard Project Goals • • • Relationship to other projects Ultimate goal of project Vermin Control High-level timing goals System Backup Power Systems Cooling Control System EFFECTIVE DESIGN SAVES $ Standard Systems Lightning Protection System Future Proofing Multi Alarming System Anti Vandalism System System Compliance Vermin Control System • Stage 1 – • Vermin Control System 2 stage system Vents are Termimesh Stainless Steel 316 Mesh • Ant Proof • Will not rust • Easily cleaned Stage 2 – – Entry & Exits are cable glands only Conduit sealing systems in cable zone Keeping vermin out = Longer life Cooling Control System • • Low maintenance cooling systems Series 1 – – – – – • Cooling Control System Ceramic fans (No bearings) Very Long Fan life Thermostatic controlled (Constant Temperature) Low power consumption so run on batteries Cooling calcs have been carried out Series 2 – – – – – – Entry & Exits are cable glands only Rear external venting of VSD No heat in the box all external Thermostatic controlled fan internal & external Cooling calcs have been carried out Also have requirement for heating if required in cold environments Constant cooler temperature = Longer life Multi Alarming System • Multi Alarming System Local alarming have provided a strobe with a near vandal proof cover which we have developed in house • Local relay based control system for backup critical well and simple control system • Log Faults last 5-10 faults locally Anti Vandalism System • Anti Vandalism System Robust locking systems – – • 316 handle that takes standard padlocks 3 point locking system for door Provide specialised light cover design – Vandal proof light cover • Solid 316 stainless steel construction • Since we use standard boxes easy to replace if it gets smashed or damaged. Backup Power Systems • Backup Generator Sockets 4 Pole change over switches – – – • Backup Power Systems Designed are per regulations DS3 & DS9 Marechal inlets and lockable covers Lockable Gen-set inlet covers Backup Batteries system – – 12 /24 Volt battery backup Batteries correctly charged and discharged and floated correctly Good battery management = Longer battery life System Compliance • AS/NZS 3000:2007 – – – – – • • System Compliance Thermistor protection Full load isolation switches 4 pole Gen-set changeover switch Interlocking Door Panels Earth leakage detection G.P.O’s Local service and installation rules OH&S (Work cover safe working) – – – – – – Isolatable switch board Viewing Windows Easy to operate Standard procedures Standard training Standard manuals Future Proofing Future Proofing • MAS 711 support for ITT Flygt pumps over 70kw capacity • ITT Flygt support for the MiniCas II relays • Handheld plug in laptop with full mimics etc • Product improvement working constantly with vendors to improve the product. When you have a standard, vendors are more likely to take feedback • Main Vendors – – – B & R Cabinets Serck Controls Schneider Electrics Lightning Protection System • Stage 1 – • 3 Phase primary parallel lightning protection • Protect VSD’s etc Stage 2 – • Lightning Protection System 3 Level system 1 Phase mains to control system • Control system protection • Radio • Telemetry controller • Other control devices Stage 3 – All 4 – 20mA inputs protected – All Digital I/O via a relay Plus radio lightning protection – Effective lightning protection = Longer life Standard Systems • Standard Systems Standard Parts we have standardise on a set of parts for ease of sparing • Standard Drawings provide comprehensive easy to read drawings • Standard Boxes we use standard B&R so easy to modify and get quantity quickly also to carry out upgrades • Standard Testing is carried out on all units using a automated SCX test system • • • Standard Operating procedures Standard Manuals improve the quality of manuals Standard Training Standard systems = Save Money Generation Issues Resolved • • • • • • • DC breakers (No fuses) Front panel switch and alignment integration Correct battery charging Labels (all screwed on) Phase failure relay All in one motor control (thermal/magnetic/contactor) etc EFFECTIVE DESIGN SAVES $ • The Benefits Capital Costs – – – – – – – Electrical pump station costs decreased No tender or tender specification required No electrical design required any more for tender Much lower install costs Able to sell to developers with profit You get what you want Generation 3 board provided not a Generation 0 EFFECTIVE DESIGN SAVES $ • The Benefits Operating Costs/Time – – – – – – – Increased life = Decreased whole of life costs Reduced visit to pump stations Reduced overflows (EPA fines) Lighting Protection = Overflow reduction Spares & time to repair, quicker response times More knowledge of each site for operators Training and documentation is much better Our Unique Position • • • • • • • • • Award winning switchboards (IPWEA) We have built our systems on whole of life costs (Operating efficiencies) not built for a price. Tender= Built for a price We have already done the hard work of tendering and vendor selection. The best product for the best price. Full range covered (1.1kw to 160kw) VSD (1.1kw to 15kw) DOL / Soft starter Available of the shelf (3-6 weeks delivery) Longer Life Local Government ACT 1993 (Part 3) Clause 55 “What are the requirements for tendering?” (3) This section does not apply to the following contracts: “a contract entered into by a council with another council” We now have Generation 3 boards not Generation 0 Questions Thank You