February 29, 2012 Tracy Hansen Bryon Lawrence April 2002 Overview • • • 2 Project Overview Prototype Work Next Steps and Future work April 2002 Contributors 3 Leigh Cheatwood Harris Paula McCaslin Yu-ru Chen Charlie Paxton Gina Chien Bunny Pfau David Etim Evan Polster John Ferree Nico Preston Tom Filiaggi Jim Ramer Chris Golden Mike Romberg Herb Grote Bob Rood Eve Gruntfest Kevin Scharfenberg Tracy Hansen Steve Schotz Xiangbao Jing Logan Smith Bryon Lawrence Jennifer Spinney Tom LeFebvre Jennifer Valdez Mark Mathewson Joe Wakefield Greg Machala Susan Williams April 2002 Collaborations NWS National Centers NCEP Development Team AWIPS II Extended AWIPS II Collaboration Data Delivery Thin Client Verification NWS Partners OHD, NWS Hydrologists Workshop participants BOU Office NWSWarn NSSL PHI Central Weather Bureau,Taiwan RTS Raytheon Technical Services MDL Meteorological Development Lab NSSL National Severe Storms Lab 4 Iris / iNWS COMET RENCI SSWIM Social Science Woven Into Meteorology University of Wisconsin Iterative Feedback Process “Build a little / Test a little” Prototype Demo Sessions Feedback User 55 Incorporated into next iteration Social Science Partner Research Social Science Woven into Meteorology (SSWIM) SSWIM brought on board 2009 Preliminary Results from Current Research shared at AMS 2011 Jen Spinney, Researcher carrying out social science component of project 6 Today, provide a brief overview of the social science component and share several practical applications for the Hazard Services prototype design. Funding and Resources • National Weather Service – OS&T (Office of Science and Technology) • GSD DDF (Global Systems Division Discretionary Director) and Base Funds CWB (Central Weather Bureau) Taiwan COMET – University of Southern Florida Southern Region – NWSWarn MDL personnel • • • • 7 Hazard Services Project Portal : integratedhazards.noaa.gov 8 Purpose -- Integrate Hazard Tools Phase 1 WARNGEN (< 1 hour) GHG (Hours-Days) Hazard Services RiverPro (Days) 99 Purpose -- Integrate Hazard Tools Phase 2 WARNGEN (< 1 hour) GHG (Hours-Days) Hazard Services RiverPro (Days) NMAP (National) 10 10 Purpose -- Two-way Communication Phase 3 AWIPS II CAVE -Forecasters Hazards National “Cloud” Impacts 11 11 Web -- Partners: EM's, Broadcasters Spotters, Publics Project History • 2004 OSIP Project / Next Generation Warning Tool team – Telecons for Concept and Requirements discussions 2008 Workshop Norman OK, 130 attendees http://www.weather.gov/warningworkshop – 50% NWS / 50% partners (FEMA, EM’s, etc.) 2009 Integrated Hazard Information Services Workshop hosted by GSD, 70 attendees http://fxa.noaa.gov/NGWT/NGWT_Workshop.html • – Forecasters / partners / developers / social scientists – Initial User Interface designed for prototyping 2010 Prototyping – Web-based short-fused tornado warning 12 – Established basic user interface through rapid forecaster feedback – Looking ahead to two-way communication Project History • • 13 2011 Prototype work – AWIPS II CAVE Prototypes – short-fused, longfused, hydro – Utilization of PGEN drawing tools – GIS data – hospitals, Iris spotter reports, Census – Design and partial development for “Live Data” – Web-based prototype (prior to May) – Attended IWT Workshop – Hydro/Partners 2011 Workshops – Attended IWT Workshop – Hydro/Partners – Hazard Services Workshop II (Sept) – Engaged user community and began defining IOC requirements Short-fused Tornado Warning 22 Short-fused Tornado Warning 23 Long-fused Winter Storm Warning 24 Long-fused Winter Storm Warning 25 Integrated Hazard Information Services Moving from Product-Centric to Information-Centric Hazard Information Still need to store both legacy VTEC (Valid Time Event Code) product-centric information along with “atomic” information-centric information. April 2002 Hazard Services – Data Storage National Distributed Database Hazard Creation: Atomic Hazard Information Grids, Polygons, Points, Paths (Drawn or Calculated) -> VTEC Information Product Generation 27 April 2002 Information Centric Product Centric SBN Next Steps and Future Work 28 Summary of Prototyping Work – Prototyping has • “Touched on” ~60% of requirements • Provided a good launching point for gathering functional requirements and IOC design • Yet only covers ~20% of the functionality 29 Future Work -- Integrated GSD / RTS team for Phase 1 production development -- Goals: OSIP Gate 3 and IOC -- Development Tasks – – – 30 Data Transformation Framework for algorithms such as Recommenders and Text Products Database Solution – working with Iris team on storage formats, security, authentication User Interface and Forecast Process – common GUI for efficient and accurate hazard generation Hazard Services across perspectives A possible step toward integrating AWIPS Applications • Common Data Access • Common Tools – iTools, Recommenders, Text Products • Collaboration • Real-time • Data Sharing • National Data “Cloud”