LUNSEMFWA HYDRO POWER COMPANY LTD Presentation to the Norfund Annual Conference 28TH August 2014 Zambia is land linked to eight countries The southern African regional population is estimated to be 280 million LHPC – THE COMPANY - Incorporated in July 2001 - Commenced Operations in January 2002 - Shareholders at incorporation Eskom Enterprises Wanda Gorge Investments De Garnier Holdings : 51% : 20% : 29% - Current Shareholders AGUA IMARA Wanda Gorge Investments : 51% : 49% VISION To increase the contribution to the national installed capacity from the current 56 MW to 500 MW by the year 2020. MISSION STATEMENT To become an electricity supplier of outstanding stature, positively driving the direction of energy sector in Zambia and the region. COMPANY KEY ASSETS Mulungushi power Station (MPS) : 31.0 MW Lunsemfwa Power Station (LPS) : 25.0 MW Total Installed Capacity : 56.0 MW Single 66 kV line between MPS and LPS Two 66 kV Lines between MPS and Kabwe Mulungushi & Mita Hills Reservoirs : Total Vol. 967,000,000 m3 PRODUCTION Production at takeover Current Production : 5 MW : 56 MW Lunsemfwa and Mulungushi Power Stations Location LHPC Generation History Production Trend Since LHPC Inception in July 2001 450 Energy Production (GWh) 400 350 300 250 200 150 100 50 0 Energy GWh 2002 2003 2004 2005/06 2007 2008 2009 2010 2011 2012 2013 193.388 215.101 212.301 198.676 237.399 291.465 303.223 329.324 406.627 401.51 403.6 LHPC’s Achievements • Survived as the first IPP in Zambia. • Increased Generation from 38 MW to 56 MW in 10 years. • Strong HSE focus and no fatalities over the last 10 years. • Excellent track record: - Plant Availability - Load Factors - Forced Outages - Planned Outages : 98% : 98% : 0.5% : 1.5% LHPC’S SOCIAL ACHIEVEMENTS Moved 160 families from food insecurity to small/medium scale farmers Electrification and supply of free electricity to 2 schools Expanded school places through construction of 2x3 classroom blocks, provision of accommodation for teachers Created a total 250 construction jobs during the expansion programmes and assisted in increasing farming productivity Income improvement through sourcing of construction materials form community. Continued support to health centres through provision of medicines and diagnostic instruments and accommodation to health workers Opened up rural roads around generating plants, easing access to the market for farm produce. Stable supply has improved the electricity system reliability MULUNGUSHI POWER STATION BEFORE AFTER NEW UNIT 10.5 MW LPS Powerhouse NOW – AFTER UNIT 4 EXPANSION BEFORE EXPANSION Future Strategic Plan Actions Anchored on mature key assets CATCHMENTS VS. FLOW & HEAD MULUNGUSHI RESERVOIR MITA HILLS RESERVOIR MUCHINGA HPP GENERAL LAYOUT MUCHINGA HPP GENERAL LAYOUT MULUNGUSHI LOWER GENERAL LAYOUT A CASE FOR INVESTMENT IN ZAMBIA 25% of 13 million population connected to grid Total installed capacity 2000 MW, total potential of 6000 MW hydro potential (compared to Norway 28,000 MW) Mining industry consumes about 50% of total and increasing Mining industry represents 70% of Zambia’s exports Interconnected to SADC via SAPP A CASE FOR INVESTMENT IN ZAMBIA CONT. History of Peace and improving democratic governance. Centrally located in SADC region Abundant Resources Government Enabling Legal and Regulatory framework Electricity Sector Investment Reform Fast growing economy Young and dynamic population INTERCONNECTED ZAMBIA To Sumbuwanga ZAMBIAN POWER SYSTEM 8o KAPUTA Zambia Well Connected MPULUNGU MBALA LUNZUA KALUNGWISHI KASHIKISHI DRC Interconnection being enhanced MPOROKOSO KALUNGWISHI RIVER KASAMA MAMBILIMA MUSONDA FALLS Regional Market viability NAKONDE CHISHIMBA FALLS LUWINGU ISOKA MANSA CHINSALI MICHELO West Lunga River at Mwinilunga (1.2MW) SAMFYA MOMBUTUTA LUMWANA ANGOLA SOLWEZI LUANO KANSUSWA MPIKA LUNDAZI LUSIWASI KITWE Chavuma Falls (1.2MW) PENSULO KabompoRiver at Kabompo -Manyinga Bridge (0.10MW) Kabompo River at ChakataFalls (1.2MW) SERENJE MAPOSA Lufubu River at Kasempa Bridge (0.23MW) MFUE MKUSHI MPONGWE ZAMBEZI KAPIRI CHIPATA MSORO LUNSEMFWA KABWE KALABO LUKULU PETAUKE LUNSEMFWA LOWER / MKUSHI PROJECT LOCATION MUMBWA LUSAKA WEST KAOMA MONGU KAFUE TOWN KAFUE LOWER CHIRUNDU ITEZHI - TEZHI MAZABUKA LAKE KARIBA KARIBA SOUTH km 330 kV 220 kV 132 kV 88 kV MUZUMA SESHEKE VICTORIA FALLS 66 kV 1941 348 77 717 2791 POWER STATIONS NAMIBIA East LUANGWA KEY KARIBA NORTH (120MW) East o KAFUE GORGE SENANGA o 33.5 LEOPARDS HILL KAFUE WEST 22 AZELE KATIMA MULILO 18 BOTSWANA o PROPOSED POWER STATIONS ZIMBABWE SUBSTATIONS PROPOSED SUBSTATIONS DIESEL STATIONS PROPOSED LINES 330 kV 220 kV 132 kV 88 kV 66 kV IMPORTANCE OF CLEAN ENERGY FOR ZAMBIA • CURRENT SITUATION •Resource Rich •Abundant Mineral Resources (Copper, Manganese, Colbalt ,etc) •Water Resources (40% of SADC water) •Fertile Land •Young population •High poverty levels •High unemployment •Un exploited resource & potential •Main reasons •Lack of financial resources to turn resources into wealth •Severe energy shortage rendering the majority of population into development spectators IMPORTANCE OF CLEAN ENERGY FOR ZAMBIA • DESIRABLE SITUATION •Provision of financial resources for clean energy development •With available energy provide financial resource for sustainable natural resource development leading to economic development At Bell Point 20 June 2012 Tusen Takk !