Characteristics of public quick chargers to support EV users December 8 , 2010 TEPCO Takafumi Anegawa 1. Why public chargers are necessary? 2. How much kW is optimal output power? 3. Does quick charger degrade battery? 4. Is there negative impact on power grid? 1. How can we deploy quick chargers? EV drivers can not use full battery capacity 25 Typical distribution of daily driving range Comfort Discomfort Fearfulness % of drivers 20 15 Driving range Driving range 10 5 Driving range 0 <10 <20 <30 <40 <50 <60 <70 <80 <90 <100 <110 <120 <130 <140 <150 Driving Range (km) Driver knew that EV could but didn’t use it (October 2007) 15km March 2008 8km Drive mileage was 203km before quick charger installation. Driver understood EV performance but they were reluctant to use it. Quick charger removed range anxiety (July 2008) 15km 8km Drive mileage was drastically increase to 1472km after quick charger installation. Why public chargers are necessary? • Daily base driving distance is less than 100km in most cases then current EV can cover it easily. • However, drivers are uncomfortable if remaining driving range become less than 50km. • Public quick chargers relieve drivers’ range anxiety, and drivers use quick chargers only few times. 1. Why public chargers are necessary? 2. How much kW is optimal output power? 1. Does quick charger degrade battery? 2. Is there negative impact on power grid? 1. How can we deploy quick chargers? Public charging stations in California - 129 in San Francisco and Bay Area - 186 in Los Angels County - Inductive and conductive are mixed - Output power is around 5kW - Charging time is around 2hrs for 70km - Price is about $3,000 without installation cost. - Private charger design is same of public one. Inductive 700km Conductive Optimal output of public charger 200 Cost is high. Charging time isn’t so short. 90 Waiting time is too long. 80 180 160 70 140 60 120 50 100 40 80 Optimal power 30 60 20 40 10 20 0 0 0 20 40 60 80 100 Charger Output Power (kW) 120 140 160 Charger cost (k$) Charging time for 80km range (min) 100 Specification of developed quick charger Specifications -Type: Switching type constant current power supply - Input: 3-phase 400V - Output power: 50kW (10~100kW) - Maximum DC output Voltage: 500V - Output current: 125A (20~200A) Target charging time 5 minutes for 40km driving range 10 minutes for 60km driving range Unit price €20,000~30,000 Installation cost ~€20,000 Cost for one user €250 = €50,000 ÷ 200 users How much kW is optimal power? • Waiting time should be less than 15min. • Additional driving range is 30km~60km which is equivalent of 5~8kWh. • 50kW power can meet 10~15min recharging time. • Less than 20kW is too slow. • More than 80kW is too costly and charging time doesn’t become so short. 1. Why public chargers are necessary? 2. How much kW is optimal output power? 1. Does quick charger degrade battery? 2. Is there negative impact on power grid? 1. How can we deploy quick chargers? Optimal charging speed is different in each batteries • Battery degradation is caused by over voltage and high temperature. • Limit voltage and temperature depend on battery characteristics. • On-board battery management system is watching the voltage and the temperature in real time. BMS: Battery Management System Observing parameters • Battery total voltage • Cell voltage • Battery temperature • Input Current etc. Charging process is controlled by EV in CHAdeMO Problems: • Battery improvement is so fast that it’s difficult to catch up every batteries’ data. • Standardization to meet lowest speed battery disturbs battery improvement. How CHAdeMO charger works: • EV computer unit decides charging speed based on BMS observation. • Charging current signal is sent to charger using CAN bus. • Charger supplies DC current following the request from EV. signal Current Communication Protocol Connector Does quick charger degrade battery? • CHAdeMO quick charger can change charging speed to meet each batteries characteristics and condition. • There is no negative impact on battery system by quick charging if charging speed is well controlled. • Advanced battery which can absorb higher current can get higher power. 1. Why public chargers are necessary? 2. How much kW is optimal output power? 1. Does quick charger degrade battery? 2. Is there negative impact on power grid? 1. How can we deploy quick chargers? Location of quick chargers on power grid Ultra High Voltage Substation >270 kV High Voltage Low Voltage Substation 66kV Power Station 6.6kV 66kV 5000kVA Trans 200kVA Trans Trans 3φ200V Mall Office Building 50kVA Trans 1φ200V Commercial Area Condo Residential Area × Normal charging 50kVA Quick Charger Slow AC for private and quick DC for public Fast Charging Speed EV users share quick chargers. Necessary number is ~100s Private/Office Location All EVs need their own outlets Charging speed is most important. Public Necessary number is ~100,000s Low unit cost is most important. Slow × People cannot wait for hours. 1. Why public chargers are necessary? 2. How much kW is optimal output power? 1. Does quick charger degrade battery? 2. Is there negative impact on power grid? 3. How can we deploy quick chargers? Quick charger location in Japan For public use For private use Greater Tokyo Area 25km 50km ~300 chargers are in service Locations are on Google Map Search keyword is “CHAdeMo” TEPCO branch office 64 quick chargers are installed. 310 EVs are already deployed. It will be 100 by the end of 2010. 210 EVs will be deployed in 2010. Kanagawa prefecture office Operation started on June 2008 Office Building Operation started on September 2008 Operation started on April 2009 Operation started on September 2009 Metropolitan highway parking area Operation started on October 2008 Tokyo University of Marine Science and Technology Operation started on March 2009 Gas station Operation started on Operation started on March 2009 July 2009 Shopping mall Operation started on September 2008 Convenience store Operation started on December 2009 Mitsubishi Motors & Nissan Headquarter Operation started on Operation started on June 2009 August 2009 CHAdeMO Association Activities: 1.Establish technical specification of DC fast charger 2.Deploy DC fast chargers by sharing installation and operation experience among the members. 30 Thank you Why don’t you have a cup of tea?