Eng.Omar Abdo

advertisement

ITS IN EGYPT

DREAM TO BECOME TRUE

Omar Mahmoud Abdo

ICT Consultant

Ministry Of Transport

 Noise

 Emissions

 Congestion

 Crashes

 Vibration

 Energy consumption

• Construct new roads

• Increase existing infrastructure capacity

– Uses intelligent transportation systems (ITS)

• Reduce Traffic

– Travel demand management

– Alternative transportation

Construction Is

Part of the

Solution

Increase Existing

Infrastructure Capacity

• An alternative to expensive new highway construction is the implementation of strategies that promote more efficient utilization of transportation infrastructures.

• These strategies are known as the Intelligent Transportation

Systems (ITS), which aims to reduce travel time, ease delay and congestion, improve safety, and reduce pollutant emissions

Remaining Effective Capacity

Special events and disasters further restrict capacity

Weather: fog, rain can all restrict capacity

Work zones: major cost is delay imparted to the traveler

Incidents: more delay is caused by incidents than by recurring peak period congestion.

Incidents can comprise 50% of peak period congestion.

1 min delay in clearance = 4 to 5 min of traffic backup.

ITS

Remaining Effective Capacity

 Intelligent Transport Systems (ITS) involve the collection and processing of data: o to provide information.

o to advise or control the actions of:

• Travellers.

• Drivers.

• fleet operators.

• network managers.

o using computers with multi-media communications and other technology.

o No longer able to keep building new roads to accommodate predicted demand o Need new ways to improve capacity o Need to ‘lock in’ capacity provided by new / improved road schemes o Drivers want more information and more reliable journeys

 10% of delays result from road works, 25% from incidents o ITS can advise of congestion and help manage road works and incidents o Safety improvements result

• ITS is a tool to implement transport (and other) policy

– Not an end in itself

– Not a cure-all solution

• ITS can be beneficial

– On its own

– Supporting other measures

• Flexibility to respond to changing priorities

• Analyzing

- sensing & analyzing environment

- detecting changes, perceiving problems

• Making decisions

- acting rationally, choosing options to solve problems

• Learning

- using experience to make improvements: identifying new problems & decision making

• Better management / more efficient operation

• Sharing data – collect once, use many times.

• Standardising equipment and protocols – using the best IT can offer.

• Reducing cost / achieving operational targets

• Dealing with information overload - highlighting what is important.

• Presentation in a digestible format and there when you need it.

• Coordinating effort – knowing what is happening and who is dealing with it.

قرش رطانقلا عطاقت

لينلا

برغ رطانقلا عطاقت

لينلا

جرفلا ضور عطاقت

عطاقت

ةيروصنملا

بينملا عطاقت

د ارتسوتولأا عطاقت

عطاقت

ةسسؤم

ةاكزلا

عطاقت

بتسكياهلا

عطاقت NB

عطاقت NA

سيوسلا عطاقت

 110 Km length.

 33% of traffic volume (Heavy Trucks).

 Higher rates of fatalities compared to similar size roads .

 Daily Traffic volume is 140,000 vehicles

 22 legal exits and entries in every direction and a lot of illegal exits and entries.

 Average Speed is 10 Km/Hour (The Road

Design Speed is 90 Km/Hour)

 143 Bridges

 487,000 tons of emissions

Both directions

Displaced concrete barrier

1. Incident detection and rapid response

• Coordination of emergency services

• Rapid removal of debris

• Temporary lane control and traffic management

• Real-time traffic information and VMS

2. Enforcement activities

• Overloaded trucks

• Speed limit violations

• Left lane truck violations

3. Access control

• traffic and pedestrians, microbuses

• The aim is to improve traffic flow and Improve Road Safety.

• The aim is to deliver a system that can be expanded on for all Egypt

• It will deliver the foundations on which the System will grow

• It will dictate Standards and Interfaces to allow peripheral equipment to be specified outside this contract and connect with the ‘System’.

• Such Standards can be used by All Parties involved in ITS in Egypt.

• It will deliver a managed solution that maintains the investment value whilst allowing the growth of an indigenous knowledge base.

• It will provide a visible solution to the motorists and support the security needs of the community whilst enhancing the driving experience on the

CRR.

• We need to know the dynamics of the network – information

• We need to know what is happening on the network – vision

• We need to identify problems on the network – smart vision

• We need to deal with transgressions – detect and enforce

• We need to influence and inform travel patterns – inform

• We need to manage highway dynamics – control

• A number of RADAR based, multi lane traffic detectors

• Mounted on poles surveying all lanes of carriageway

• Positioned mid link on all sectors of CRR , 26 July Avenue and some key internal arterials

• Providing flow volumes, classification and occupancy values

• A small number of Roadside Weather Stations

• Providing information on temperature, wind speed, precipitation, visibility and fog.

• Used to enhance Response plans in System and

Driver information via VMS and HARS.

• A number of ‘Dome’ CCTV Surveillance cameras at strategic locations

• Full Pan, Tilt, Zoom capabilities

• Comprehensive coverage of network

• All Video data routed to GDT Secure location.

• Machine Vision System uses Image processing techniques to

‘instrument’ the view .

• Gantry mounted overseeing all carriageway lanes .

• Collects information for flow, speed, occupancy and classification for evaluation and the generations of real time

Automatic Incident detection alarms.

• Provides a trigger for ANPR cameras for over speeding vehicles and for detection of Trucks using the left lane.

• Supplements other ITS sensor information.

• An ANPR Camera per lane complete with Infra Red

Illuminator to give 24/7 functionality.

• Image collection of speeding and trucks violating traffic laws.

• High quality digital image suitable for enforcement purposes Triggered by Smart camera for instant, accurate image capture.

• All images routed to secure GDT facility.

• Linked to advanced Video management,

Registration and Citation processing systems

• Some speed enforcement measures cause rapid acceleration and deceleration as drivers break in front of cameras.

• ANPR systems allow vehicles to be identified at different positions on the network.

• Average speed between two points is measured.

• Speed across the entire length of road can be enforced.

• Free Flow Weigh in Motion using embedded sensors Uses same camera infrastructure as previous function to detect overweight trucks in excess of a threshold.

• All images routed to secure GDT facility for processing

• Links to registration database and Video management suite.

• LED Matrix based Variable Message

Signs.

• Two Pictograms and Central Text

Portion –give visual and textual messages in Arabic

• Used to advise drivers of situations on highway and to implement diversionary routing away from incidents, capacity problems

• Driven by combinations of sensory inputs into ITS system

• Can be used for service information, traffic status etc in application of response plans, strategies.

• Highway Advisory Radio System

Transmits traffic information over a dedicated FM frequency

• Antenna placement on South

Eastern side of CRR will cover all project area plus arterials approaching Cairo.

• One National Frequency for all

Egypt

• Primary & Secondary ITS systems in different locations

• Robust, reliable, ‘mirrored’ systems ensuring hi levels of redundancy

• Separate Traffic and Video

Architectures

• Development of Response Plans and

Operational Protocols between MOT and GDT to ensure swift responses can be made.

• Joint staffing between MOT, GDT and

Contractor.

• Comprehensive statistical database for off line evaluation

• Asset management database

• All Video Management under GDT control

• Combined CCTV and Smart camera automatic alarms

• Alarms and statistics from Smart Cameras relayed to Traffic

ITS applications, supplementing sensor inputs.

• Very secure, robust Video management and analytic software

• Archived in a secure location.

• Links to Vehicle Registration database to facilitate issuing of fines for traffic violators; Speeding Vehicles & Trucks in wrong lanes.

• A Single Contract , let under FIDIC Yellow Book Terms &

Conditions.

• Contractor responsibility to be Design, Build, Operate and

Maintain for 5 Years.

• Contractor Services will include supply of Key Staff &

Operators whilst MOT & GDT ‘learn on the job’ with a view to self sufficiency after initial period.

• Contractor will be responsible for periodic and on going maintenance of the ‘System’.

• O&M Elements will contain some performance related criteria subject to attaining realistic KPI’s

• Contractor responsibility for Detailed Design of system to meet our needs.

• Project Management throughout Design & Build scenario

• Provision of FAT & SAT testing facilities and objectives .

• Responsible for Minor Civil works & Structures (Gantries, Poles etc) .

• All Testing & Certification of completed works Training of

Employers staff .

• All post commissioning Documentation and drawings.

• Establishment of a Local maintenance Depot facility.

ITS is Not a cure-all solution.

ITS in support of transport & economic policy goals.

Enabled by technology.

Tailored to the situation in

Egypt.

To realise full potential of the transport network.

Capture the benefits.

Leadership and organizational capability.

Organizations working together, working differently.

• Dr. Ali Selim , Consultant to the Minister

• Jim Dixon ,

• Dr. Hisham Fouad ,

42

THANK YOU