ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: email Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc. Agenda General overview of VRF Technology Review of Design Considerations Benefits of VRF Variable Refrigerant Flow (VRF) Heat Pump versus Heat Pump with Heat Recovery Heat Pump Heat Pump Outdoor Unit Indoor Units Controls System Heat Pump Outdoor Unit Indoor Units Controls System Heat Pump Applications Restaurants Lobbies Others? Churches Heat Pump with Heat Recovery Simultaneous Cooling & Heating Heat Pump with Heat Recovery Simultaneous Cooling & Heating Outdoor Unit Branch Circuit Controller Indoor Units Controls System Heat Pump with Heat Recovery Simultaneous Cooling & Heating Outdoor Unit Branch Circuit Controller Indoor Units Controls System Heat Pump with Heat Recovery Applications Simultaneous Cooling & Heating Schools Assisted Living Facility Others? Offices What is the purpose of each component? Outdoor Unit • Controls compressor speed • Controls condenser fan speed • Controls pressure of refrigerant to maximize capacity and efficiency Branch Circuit (BC) Controller • Separates refrigerant into gas and liquid • Ensures units in heating receive superheated gas • Ensures units in cooling receive sub-cooled liquid Indoor Units • Sense the space temperature • Contain a Linear Expansion Valve (LEV) that automatically modulates • Allow the precise amount of refrigerant through the heat exchanger • Filter and distributes air Controls System • Integrated sequence of operation • Takes input from the user and provides feedback to the system Recall What system type requires a Branch Circuit Controller? Which system type cannot provide cooling and heating simultaneously to connected units? Is there any difference between the controls offered for Heat Pump Systems versus those offered for Heat Pump with Heat Recovery? VRF Design Considerations Equipment Layout Diversity Ventilation Heating Efficiency Equipment Layout Equipment Layout Diversity Ventilation Heating Efficiency Ceiling Space 20 Ton System 40” x 20” Rectangular Ductwork (DX System) 30” Round Round Ductwork (DX System) 3” CHWS&R, 3” HWS&R Piping (4-Pipe System) 13/8” Gas 1 1/8” Liquid Piping (VRF) Equipment Layout Diversity Ventilation Heating Efficiency Rooftop Equipment Weight 80 Ton System 12,000 10,000 8,000 Equipment Weight (lbs) 6,000 4,000 2,000 0 VAV Equipment Layout RTU w/ SS Diversity VRF Ventilation 4-Pipe Fan Coil Heating WSHP Efficiency Vertical Stack WSHPs Equipment Layout Diversity Ventilation Heating Efficiency Water-source VRF Equipment Layout Diversity Ventilation Heating Efficiency Piping Lengths • There are piping considerations for: ▫ Total System Piping Length ▫ Intermediate Lengths ▫ Elevation Differentials Equipment Layout Diversity Ventilation Heating Efficiency Condensation • Outdoor Units ▫ Consider location of unit ▫ Consider area drains and floor stands • BC Controller ▫ Drain pipe connection • Indoor Units ▫ Drain pipe connections ▫ Some styles include standard condensate lift mechanism ▫ All styles include contact for condensate alarm/safety switch Equipment Layout Diversity Ventilation Heating Efficiency Diversity Equipment Layout Diversity Ventilation Heating Efficiency Solar Diversity 5 Tons Morning 3 Tons Afternoon 3 Tons Morning 5 Tons Afternoon What is the block load? What is the sum of the zone peak loads? Equipment Layout Diversity Ventilation Heating Efficiency Occupant Diversity WORK ROOM 103 CONFERENCE 105 OPEN OFFICE 101 COFFEE 105A Equipment Layout Diversity Ventilation Heating Efficiency Occupant Diversity WORK ROOM 103 CONFERENCE 105 OPEN OFFICE 101 What is the sum of the peaks? COFFEE 105A What is the block load? Equipment Layout Diversity Ventilation Heating Efficiency Building Diversity HEATING Waste Heat What equipment is running? COOLING Equipment Layout Diversity Ventilation Heating Efficiency Designing with Diversity • Connected Capacity: ▫ Connect up to 150% of the outdoor unit capacity. • Actual Capacity: ▫ The actual system capacity is the capacity of the associated outdoor unit. • A system cannot provide more than 100% of the outdoor unit’s capacity. Equipment Layout Diversity Ventilation Contact your local representative when designing at greater than 110% connected capacity. Heating Efficiency Designing with Diversity Example: • Indoor units totaling 14 tons can be connected to a 12 ton outdoor unit ▫ Connected Capacity = 14 Tons, 117% ▫ Actual Capacity = 12 Tons, 100% • The maximum amount of cooling that can ever be provided at a single instant is 12 tons Contact your local representative when designing at greater than 110% connected capacity. Equipment Layout Diversity Ventilation Heating Efficiency Ventilation Equipment Layout Diversity Ventilation Heating Efficiency Ventilation • Duct required Outside Air (OA) directly to space or indoor unit ▫ Always calculate entering coil temperatures • Use Dedicated Outside Air System (DOAS), Energy Recovery Ventilator (ERV), or both to temper the air • Adhere to local codes in designing ventilation Equipment Layout Diversity Ventilation Heating Efficiency Heating Equipment Layout Diversity Ventilation Heating Efficiency Special Considerations for Heating • Utilize manufacturer’s design software • Minimize connected capacity for colder climates • Outside Air • Consider Building Warm-up Equipment Layout Diversity Ventilation Heating Efficiency Efficiency Equipment Layout Diversity Ventilation Heating Efficiency Efficiency • INVERTER-driven compressor matches compressor speed exactly to load • Simultaneous cooling and heating allows heat recovery between zones • All efficiency values now available via AHRI Directory ▫ http://www.ahridirectory.org Equipment Layout Diversity Ventilation Heating Efficiency Efficiency 20 Ton System System Type Roof Top Units Air-Cooled Chiller Air-source VRF Water-source VRF IEER 11.5 - 17.7 19.6 EER 9.7 10.3 10.9 10.5 IPLV - 14.2 - - SCHE - - 18.6 N/A Equipment Layout Diversity Ventilation Heating Efficiency What are the benefits of VRF? • Two-pipe System • INVERTER Technology • Multiple Indoor Units • Variable Capacity System • Zoning System • Complete Control Offering