OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014 PRESENTATION OVERVIEW i. Proposed $600 Million near-term investment in Tumbler Ridge / Chetwynd region ii. Who Is EDF EN Canada? iii. Overview Sundance Wind Project iv. Environmental Assessment Activities v. Visual Simulation for Sundance Project EDF EN: A LEADER IN RENEWABLE ENERGY An expertise in multiple segments An international footprint 18 countries ~ 3,050 employees + Biomass Biogas + Sea Energy + Concentrated Solar Power WIND ENERGY SOLAR ENERGY onshore & offshore pv Other North America Europe Africa / Middle-East / India A leading position in its business Integrated skills Present on all the renewable value chain Generation activity 6,611 MW gross installed Among the top 10 global players 1,986 MW gross under construction* 11,1 TWh of green electricity generated in 2013 Development Construction Generation Operations & Maintenance Complementary activities 2,310 MW developed, built and sold 9,039 MW in operation and maintenance* Key figures at 31 December 2013 MW gross : capacity of power plants in which EDF EN is shareholder * For own account and for third party | | EDF EN CANADA MORE THAN $3 BILLION INVESTED – WITH ANOTHER POSSIBLE $1.8 BILLION FOR BC PEACE 1,304 MW – Wind PPA • 774 MW Under Construction • 530 MW Complete & Operating Operations and Maintenance in Canada: 864MW – Wind 300MW – Solar MW 720 MW of Wind in BC South Peace Region in permitting or shovel ready More than $3 Billion Investment in Canada 400 MW 70 MW 27 MW 250 MW 300 MW 1003 MW 88 MW 189.5 MW Wind, Under Development 72 MW EDF EN Canada contracted Avro Wind Energy to help develop wind projects in BC Peace River Region. Avro has carried interest in the projects. Wind, Under PPA/Construction 23 MW Solar, In Operation O&M, Under Contract OVERVIEW – SUNDANCE WIND PROJECT Generation capacity up to 250 MW Potential investment of more than $600 Million Jobs: Approximately 250 during construction Approximately 10 – 15 during operations Build and Permitting Schedule: Build early as 2016 subject to Power Purchase Agreement with BC Hydro. EA Certificate expected in 2015 First open house – June 2013 Supportive engagement with Treaty 8 First Nations Project located on Crown land, approximately 20km north of Tumbler Ridge. Near D-CAT transmission, proposed Site C dam, and ramping gas electrical load ON-GOING & UPCOMING ENVIRONMENTAL ASSESSMENT ACTIVITIES EDF EN Canada and Avro are working closely with First Nations, stakeholders, and local government to ensure EA studies are comprehensive, transparent and sensitive to local and regional concerns On-going Activities • First Nations, Public & Stakeholder Consultation • BC Environmental Assessment process – submission for Application review expected in early 2015 • Analysis of local features Some Upcoming Activities • Fall Bat surveys • Reporting on results of field studies, including Archaeological Resources, Furbearers, Ungulates (including Caribou), Bears, Fish and Fish Habitat, Vegetation and Ecosystems, Amphibians and Reptiles, Bats, Birds, Terrestrial Invertebrates, Community Infrastructure, Visual Resources, Land and Land Use, Communication Systems, Human Health, Terrain Stability, and Hydrology VISUAL SIMULATIONS – SUNDANCE MOOSE LAKE I October 1 2013 VISUAL SIMULATIONS – SUNDANCE HWY 52 I October 1 2013 VISUAL SIMULATIONS – SUNDANCE GWILLIM LAKE I October 1 2013 HOW CAN YOU HELP – AND BENEFIT? Help us deliver message to BC Government and BC Hydro: Tumbler Ridge and Chetwynd are endowed with “world class” wind energy resource. Let BC Government and BC Hydro know the world’s leading renewable power developers, owners and operators (like EDF EN Canada) are here already: Making regional investments near Tumbler Ridge and Chetwynd; and Developing low cost power with social license for the benefit of all British Columbians Three Peace Region EDF EN Canada wind projects can build as early as 2016. Potential for near term $1.8 Billion regional investment. Opportunities for local construction contracts and long term careers in operations and maintenance. QUESTIONS? David Warner EDF EN Canada Inc. 416.216.5883 David.Warner@EDF-EN.ca www.edf-en.ca www.sundancewindproject.ca Ron Percival Avro Wind Energy 250.285.2304 RPercival@avrowindenery.com