Simpson Project

advertisement
Monoco Petroleum, Inc.
Houston, Texas USA
Texas Gulf Coast Petroleum Project
{
Development Drilling to
Produce 2 - 3½ Million Barrels
of Oil & Natural Gas/Condensate
In a Nine (9) Square Mile
Proven Producing Area
Monoco Petroleum, Inc.
{
There are 3-4
Fault Blocks in
the Project
Area Zones of
Interest. The
area could
accommodate
> 20 wells.
This Image is of
Just a Portion of a
Wellbore that
Shows
NUMEROUS
Zones of Interest,
Typical of the
Project Area.
The Insert Box
shows our
calculations of the
resource that
could be
produced from
this 16 ft zone:
252,135 Bbls Oil.
The 2 Red zones are
believed to Contain
Gas/Condensate.
Well 1
TOTAL Additional
Estimated Reserves
Prospective Zone:
Estimated Producible
Reserves
5196-5200
Prospective Zone:
Estimated Producible
Reserves
Prospective Zone:
Estimated Producible
Reserves
Prospective Zone:
Estimated Producible
Reserves
Well 2
Well 3
Well 4
463 MBO
(from 4 zones)
62 Ft. NEP in 9
11 Prospective
12 zones possible
zones from 10,145Zones totalling 73 ft
from 5400' - 11,050'
505
NEP
(See
Below)
Well 5
Well 6
11,250 - 11,600
468 MBO (from
Thin Pays in 7 inch
4 zones)
pipe Best to drill
But there are 12
updip from this
Zones Total
well.
6,179-90
ф = 28-30% 4612-25 Sw 52%
Sw = 32-35% 13 ft. possibly tite
per 40 ac
A few shallower 2'
100 MBO + .3
zones
BCF Cshd Gas
5393-5405 oil 6 ft
5490-96 Poss 6'
5950-58 Poss 8'
10,0081-4
NEP 3 ft.
5867-71
10,420 - 50
Sw46%
NEP 15 ft.
10,224-31
NEP 7 ft.
10,170-80
130 MBO
10,272-351
3 sds NEP 24 ft.
6187-92
10,690 - 701
NEP 7 ft.
10,290-97
NEP 7 ft.
10,226-33
79,140 MBO
per 40 ac.
10,442-50
10,571-80
6467-71
10,788 - 800
NEP 12 ft.
Sw 56% (U)
46% (L)
10,720-36
NEP 13 ft.
10,360-70
130 MBO
per 40 ac.
11,257-61
10,469-80
ф = 28%
Sw = 32%
123,746 BO per
40 ac
11,408-17
10,580-90
10,850-60
130 MBO in ea.
Zone
11,537-44
10,946-58 (per
40 ac):
160,000 BC 3.2
BCF
11,592-99
77 ft.
75 ft.
Prospective Zone:
Estimated Producible
Reserves
10,243-65
Prospective Zone:
Estimated Producible
Reserves
10,410-90
(4 sds w/ 15' NEP),
etc.
Prospective Zone:
Estimated Producible
Reserves
(see log)
12,080 - 120
Drill updip,
10,862-70 (NEP 8')
looking for
10,980-90 (NEP 10')
4 sands to
coalesce.
11,210-20
NEP 10 ft.
12,152-60
8 ft.
11,440-50
NEP 8 ft.
Sw 42%
Total NEP
78 ft.
Additional Logs
FDC-CNL (only
cxovers 500 ft in
zones of interest)
88 ft.
48 ft.
FDCCNL (Only
covers 3,000 ft in
zones of interest)
Portion of a
Spreadsheet
Showing
Various
Evaluated
Prospective
Zones
Evaluated in
6 of 19 wells
in the Area of
Interest.
Download