Project Highlights
Tillman #1
 This well has cost over $11 Million to date.
 MPI is offering 42% of rights & title to well.
 Evaluated 3 key zones in this well - at least 2 of the 3 zones
will have high flow rates of Oil and/or Gas & high value
Condensate due to strong pressures.
 MPI seeks investment of $1,470,000 for:
Partial cost reimbursement
Evaluation & Completion
Surface Equipment
Pipeline Installation,
Gas Hookup
AND
Right of Way.
28 Feet Of Oil or
Gas & Condensate Pay
Strong Rwa
Response
19 Ft of Gas
Effect Crossover
If Gas,
Estimated
Reserves
are 2.3 BCF
Plus 115,000
BC
Strong Rwa
Response
15 Feet Of Gas &
Condensate Pay
Hourglass Shape of
Curves is a Strong
Indicator of Rich Gas
Estimated
Reserves are
1.6 BCF Plus
80,000 BC
This Map &
Land Map
indicate that a
2nd location
may be drilled
NE of the
current well.
This structure
map is
contoured on
a horizon
approximately
1200 Ft
shallower
than MPI’s
Upper Wilcox
zones of
interest.
There is strong industry interest in this area as indicated by the fact that ALL lands
bordering the Subject Lease are leased (to aggressive mid-sized oil companies)!