College Construction Program and the Outlook for the Future Rochester Construction Financial Management Association February 17, 2011 Outline The College and Organization Agencies and Funding Program and Projects State Considerations Sustainability/“Green” Master Plan and Outlook The College at Brockport Founded in 1835 (celebrating 175 years) 16 Miles West of Rochester 7,119 Undergraduate and 1,371 Graduate Students 1,377 Faculty and Staff 23 Intercollegiate Sports Team The College at Brockport Statistics: Acres ………………….. 476 Buildings …………........ 76 Square Feet …………… 2.6M+ Annual Utilities ……….. $6M+ Annual Construction …. $45M Organization Assist VP Facilities and Planning Director of Facilities Services Director of Utilities Energy Director of Facilities Maintenance Director of Facilities Planning 4 Capital Project Coordinators 1 Project Manager (Small Projects) 1 Associate Director of Facilities and Planning Contracting Agencies State University Construction Fund (SUCF) Dormitory Authority of the State of New York (DASNY) Office of General Services (OGS) New York Power Authority (NYPA) Department of Transportation (DOT) The College of Brockport (Locally Let) Funding Programs Strategic Initiatives (Bonded Line Item) – $15M/Year Five Year Capital Program (Bonded by State University Construction Fund [SUCF]) – $19M/Year MR&R (Minor Rehab & Repair, Bonded By SUCF) – $400K/Year DIFR Capital (Dorm Authority – DASNY Bonds) – $15M/Year DIFR (Campus Dormitory Funding) – $350K/Year Campus State $ (Alterations, Parking, EH&S, Priority Needs, Department) – $100K/Year Other (NYPA, Advancement, Auxiliary Services, Grants) – $2M/Year Capital Programs Five Year Academic, 2008-13 $99.6M – Annual Bonded Allocations “Critical Maintenance” only, Not-Programmatic Execution Challenges: Annual Funds but Fungible, Dominoes & Swing Dormitory Capital Approximately $15M Annually Bonds paid from Dorm Rent; Cash Flow Management Summer Focus; Limited Down Time PROJECTS UNDER CONSTRUCTION CONTRACTOR $K ACADEMIC: Roofing projects phase 1 (five campus bldgs + MetroCenter) construction in progress or contracts let, multiple roofing contractors $ 4,000 Smith Hall swing space construction at Lathrop, Dailey, Hartwell construction in progress (JOC) $ 1,000 Smith Hall (Chemistry, Physics, Computer) abatement and renovations LeChase low bidder $ 12,000 Site infrastructure improvements - repair/replace underground high voltage cables, replace high voltage electric gear East Coast Electric $ 4,000 ADA compliance and upgrades to nine elevators Schindler Elevator $ 1,500 Special Event Recreation Center - Phase 1 LeChase Construction Special Event Recreation Center - Phase 2 Holdsworth Klimowski Construction Redevelop 161 Chestnut St. for new REOC Building Christa Construction Minor rehab and repair small capital projects $0.5M annual multiple contractors $ 25,000 $ 5,000 $ 12,000 $ 500 DORMS: MacVicar renovation LeChase Construction $ 12,000 High Rise window replacements Flower City Glass $ 3,400 Multiple $ 4,800 NYPA IV: 15 measures PROJECTS UNDER DESIGN DESIGNER $K ACADEMIC: Tuttle North and South exterior renovations/repairs KHH $ 8,000 Roof replacements - phase 2 (eight buildings) Bell and Spina $ 7,000 Site infrastructure improvements - repair/replace underground water, storm, sanitary, power, teldata, at east campus) LaBella Associates $ 5,000 Site infrastructure improvements - repair Allen Bldg concrete decks and structures Flynn-Battaglia $ 1,600 New 50,000+/- s.f. academic building [strategic initiative project] SWBR $ 15,000 DORMS: High Rise bathroom renovations Trautman Associates $7,000 McFarlane and McLean roof replacements TBD $800 High Rise plaza improvements Wendel $800 NYPA V: 11 measures PRES Energy $5,700 PROJECTS AT PRE-DESIGN STATUS $K ACADEMIC: Tuttle North mechanical/electrical interior infrastructure Tuttle North critical maintenance - pool stabilization Tuttle North & South interior reconstructions, areas D & G RFQ phase RFQ phase Project request phase Renovate Lathrop/Neff: haz mat, interior rehab, life safety, ADA, MEPFP, exterior, roof Project request phase Site infrastructure improvements - reconstruct roads and walks, drainage, pedestrian mall Project request phase Provide aluminum bleachers at Special Olympics stadium (replace wood) ADA compliance/safety at railroad overpass bridge and plaza Drake Memorial Library program study/design scoping RFQ phase Project request phase Project request phase $ 4,000 $ 500 $ 9,000 $ 9,000 $ 2,500 $ 500 $ 1,000 $ 4,000 DORMS: Harmon/Gordon renovation NYPA VI: TBD Year TBD $19,000 College/State Considerations Typically Low Bid Constricted Lay Down and Parking MWBE Constant Emphasis Pay – On Time, Secure All Wage Rate Work Commissioning Change Orders – Slower Than Desired Schedules: Summer, Interruptions, etc. Limited Sole Source Storm Water Management – Site Work Involved Energy Conservation Code and Mandates Self Permitting Sustainability/“Green” Sustainability and Green Campus Multi-faceted Programs $6M Utility Bill Silver LEED for Capital Work Required Energy Conservation; Part of Every Project Equipment Design Contractor Usage Commissioning Increased Use of NYPA NYSERDA and Utility Company Grants Energy Management Systems (Andover) Storm Water Management Plan (>1 Acre Site Work) Sustainability/“Green” Townhomes – Geothermal Thompson Dormitory – Rainwater Flushing SERC – Ice Storage Chapman (NYPA) – Solar Voltaic MacVicar Dormitory – Green Roof NYPA – Performance Contracts; 20 Year Payback Facilities Master Plan What is FaMP? FaMP or Facilities Master Plan, is a comprehensive study of our campus’ existing conditions combined with our needs and vision for the future. It will identify, prioritize and sequence future facilities design and construction projects that support the academic mission. Each FaMP will be 1/32 of a system wide effort. Once completed, the FaMPs will support future capital funding programs for both Brockport and SUNY. The FaMP will be completed in five phases: 1. 2. 3. 4. 5. Phase I – Campus Profile Phase II – Assessment of Conditions Phase III – Analysis of Space Needs Phase IV – Concept Alternatives Phase V – Final Recommendation Interviews Research Observations Alternatives Planning Principles Enhance our Learning Environment and Quality of Place Develop a comprehensive framework to ensure an enduring and vibrant future. Optimize the efficiency and utilization of the existing facilities and identify the potential for new facilities to accommodate programmatic needs. Improve the pedestrian experience with walkways that are intuitive, safe and accessible. Create places and spaces to foster campus community. Organize the campus to strengthen the academic mission. Connect the campus perimeter to enrich the academic core. Strengthen the entrances and define the campus edges. Erie Canal To Main Street Holley Street Railroad Tracks Commencement Drive New Campus Drive Draft Facilities Master Plan Early Program Elements – In Progress • SERC I & II • SMITH HALL RENOVATIONS • NEW ACADEMIC BUILDING (NAB) • TUTTLE MULTI-YEAR MASTER PLAN • SITE INFRASTRUCTURE • LOWER QUAD RESIDENCE HALLS Early Program Elements – Pending • NURSING RELOCATION • LATHROP RENOVATIONS • DRAKE LIBRARY • SCHOOL OF BUSINESS • SITE INFRASTRUCTURE • STUDENT SUCCESS CENTER • STATUS OF MORGAN • RESEARCH SPACE • RESIDENCE HALLS Funding Outlook ● Academic Capital Funds – Steady ● Strategic Initiatives – None in Queue ● Dormitory Capital Funds – Cash Flow ● Dormitory Local Funds; Small Projects – Steady ● Campus Funds – Operating Budget Severely Constrained ● Critical Maintenance (Small Projects) – Increase ● NYPA and Performance Contracts – Continue ● Mandates: Sustainability, ADA, Fire Safety, etc. – Always ● Master Plan Implementation – TBD College Outlook ● Strategic Plan Processing Nationally Recognized Quality Not Quantity Key Programs ● Facilities Master Plan Quality of Place State Support Already Started/Continued Funds ● Poised for the Future Quality Students Post State “Budget Crunch” Major Facilities Investment (new and renovation) Major Capital Campaign