PROJECT:
GREEN TECHNOLOGY ROADMAP
REPORTING PERIOD: 1/8/2013 – 31/8/2013
Project Brief/Summary
Project Fund: RM 3,755,167
 Project goal is to ensure realization of national green
technology policy aspiration and translation of green
technology policy objectives and strategic thrusts into
implementable actions
Duration: 1/6/2013 – 1/4/2014
Baseline study for 9 key sectors namely Energy,
Building, Transport, Manufacturing, ICT, Water, Waste
Management, Agriculture and Forestry
Expected Outcomes
Status

On-going
Objectives
To propose appropriate policy measures for Green
Economy
To establish holistic and detailed GTMP framework
based on six (6) key enablers viz. human capital,
financial incentives, infrastructure, regulatory
framework, innovation, and branding.
To establish national Key Performance Indicator (KPI)
targets, prioritized strategies, comprehensive action
plans and specify implementing agencies and timeline
for the key sectors
Copyright Reserved GreenTech Malaysia

Key Performance
Indicators and
Targets for Green
Technology Policy
Implementation
Short Term,
Medium, Term
and Long Term
Timelines for GT
programmes
1
PROJECT:
GREEN TECHNOLOGY ROADMAP
REPORTING PERIOD: 1/8/2013 – 31/8/2013
Activities Completed (During reporting period)
Draft report on project scoping workshop conducted
on 29 July 2013 was prepared
Addendum to contract for Baseline study on GT
related Regulatory Framework was completely signed
by both parties
Arrangement for half day workshop “Designing of
Green Growth Model for Malaysia” was undertaken
 Proposal for study mission to United States and
Europe on September and November was drafted
Preliminary arrangement for conducting Ambassadors
High Level Roundtable Dialogue with Minister was
undertaken. First meeting with EUMCCI was held on 15
August 2013
 Proposal on study of impact of Green Incentives (1st
and 2nd version) was reviewed by Technical Committee
and revised by PwC
Proposed scope of work for techno-economic
assessments was discussed with MIER on 20 August
2013
Activities Planned (For next reporting period)
Submission of Project Inception Report
Internal Stakeholders Engagement Workshop –
preliminary discussion on strategies and detail
action plans
Finalization of appointment of PwC for study of
impact of Green Incentives
Contract preparation for study of impact of
Green Incentives
 Finalization of scope of work with MIER
 Proposal submission from ISIS
 Appointment of Technical Experts and Editor
 Submission of draft report by LESTARI
% completed: 9 %
% funds utilised: 4.45% (RM 167,236 spent out of RM
3,755,167)
Copyright Reserved GreenTech Malaysia
2
PROJECT:
GREEN TECHNOLOGY ROADMAP
REPORTING PERIOD: 1/8/2013 – 31/8/2013
Impacts of the Project
Detail project plans and components were planned
which inculcated key enabling factors (Institutional
Framework, Financing, R&D and Awareness)
Challenges
Actions
After the completion of
Green Technology
Roadmap baseline study for
the six sectors in 2011, there
are latest development of
programmes and initiatives
driven by Government and
Private sectors. Those
developments could have
influenced the set of
strategies and key focus
areas that were determined
earlier in the baseline study.
Thus, some targets may not
be relevance anymore and
need to be reviewed.
Internal stakeholders
engagement
workshop need to be
conducted to assess
latest development
and initiatives as well
as the impacts from
those initiatives. Gaps
on the current
Initiatives and future
action items need
to be discussed prior to
engagement sessions with
external stakeholders.