Technical Specification Sheet: Banana Biomass Processing Line
Client Name: Balachandra Mohan. J / Kavin Engineering and Services Private Limited.,
Coimbatore.
Date: 08.05.2025
Contact Info: Balachandramohan.j@kavinengg.co.in /8072440915
Project Title:
Integrated Banana Biomass Processing Line – Peeler, Chopper, Shredder & Dewatering Unit
System Requirements
1. Peeler Unit (Outer Sheath Removal)
•
•
•
•
•
•
Input Material: Whole banana pseudostems
Function: Remove outer layers or sheath for smoother processing
Capacity: 400–800 kg/hour
Blade Type: Adjustable rotating or abrasive peeling drums
Material of Construction: SS-304
Output: Cleaned pseudostem for chopping
1. Chopper Unit (Primary Cutting)
•
Input Material: Whole banana pseudostems (1–1.5 m length)
•
Capacity: 500–1000 kg/hour
•
Cut Size Output: 50–100 mm segments
•
Blade Type: High-carbon steel or SS-304 rotating blades
•
Motor Rating: 3 HP minimum
•
Discharge: Conveyor or gravity-fed to shredder
2. Shredder Unit (Fine Particle Reduction)
•
Input Material: Chopped pseudostem segments
•
Output Size: <20 mm fiber length
•
Rotor Type: Hammer mill / Blade rotor
•
Screen Size: 8–10 mm perforated screen
•
Material of Construction: SS-304 (contact parts)
•
Motor Rating: 5–7.5 HP
•
Automation Grade: Semi-automatic or automatic
3. Dewatering Unit (Sap Extraction)
• Type Preferred: Screw Press / Hydraulic Press
• Input: Shredded banana biomass
•
•
•
•
•
•
•
•
Moisture Removal Efficiency: Minimum 80–95%
Output:
- Liquid: Banana pseudostem sap
- Solid: Semi-dry fibrous cake
Material of Construction: SS-304 for contact areas
Capacity: 400–800 kg/hour
Motor/Power Rating: As per system design
Pseudostem Sap Liquid to be extracted: 1000 litres/day
Additional Requirements
•
•
•
•
•
Continuous operation preferred (batch acceptable if cost-effective)
Electricals: 3-phase 440V, 50 Hz
Safety features: Emergency stop, interlocks
Option for PLC panel (optional)
Spare blades and screens (include 1 set each)
Request
1. Technical quotation with product specifications and drawing
2. Delivery timeline
3. Warranty & service terms
4. Optional automation or integration suggestions