Bin Umar Development Project - FEED SCOPE – Overall Scheme
1st
Existing BU DGS
Dry/Wet Tie-ins
2st
LP Gas Booster
Water Intake, lifting
and pumping
CPF
C3/C4 Storage,
Blending, and
LPG Storage
300 MMSCFD
and Pumping
Export 120 km
Pipelines
(300 MMSCFD)
LPG, C5+ Storage
Pump and Terminal
(300 MMSCFD)
4st
4th and 3rd gas
RW
HP/MP/LIQ. 5km
Pipelines
Raw water /
Treated Water
6 km Pipelines
3st
TV
Utilities (Air, Fire &
Service water) Flare
Compressor (3x50%)
MP
HP
LIQ.
OHTL
150 MMSCFD Phase One Train 1 Low H2S Gas
Sales Gas
LPG
C5+
Utilities (Air, N2,
Power
150 MMSCFD Phase Two
Train 2 Sour Gas
(Outside Scope but FEED
shall consider Plot,
Equipment location, and
SIMOPS requirements )
Fire & Service
water, Treated
water, Flares)
20”x20Km
14”x45Km
Power (Fuel)
Loading
Utilities (Air, N2, Fire & Service water, Flares)
Item
1
2
Facility
Location
Streams
P1 Cap.
River Intake,
pumping and
pipeline to CPF
Shaat Al
Arab River
Brackish
Water
25 m3/hr
Gas gathering and
compression Station
Bin Omer
Degassing
Station
LP Gas
Gathering Pipelines
HP Gas
MP Gas
Liquids
3
4
Gas Processing Plant
Export Pipelines
Sales Gas
LPG
LPG
C5+
Treated
Water
5
6
LPG and C5+ Storage
and Terminal
Umm Qasar
LPG
C5+