Bin Umar Development Project - FEED SCOPE – Overall Scheme 1st Existing BU DGS Dry/Wet Tie-ins 2st LP Gas Booster Water Intake, lifting and pumping CPF C3/C4 Storage, Blending, and LPG Storage 300 MMSCFD and Pumping Export 120 km Pipelines (300 MMSCFD) LPG, C5+ Storage Pump and Terminal (300 MMSCFD) 4st 4th and 3rd gas RW HP/MP/LIQ. 5km Pipelines Raw water / Treated Water 6 km Pipelines 3st TV Utilities (Air, Fire & Service water) Flare Compressor (3x50%) MP HP LIQ. OHTL 150 MMSCFD Phase One Train 1 Low H2S Gas Sales Gas LPG C5+ Utilities (Air, N2, Power 150 MMSCFD Phase Two Train 2 Sour Gas (Outside Scope but FEED shall consider Plot, Equipment location, and SIMOPS requirements ) Fire & Service water, Treated water, Flares) 20”x20Km 14”x45Km Power (Fuel) Loading Utilities (Air, N2, Fire & Service water, Flares) Item 1 2 Facility Location Streams P1 Cap. River Intake, pumping and pipeline to CPF Shaat Al Arab River Brackish Water 25 m3/hr Gas gathering and compression Station Bin Omer Degassing Station LP Gas Gathering Pipelines HP Gas MP Gas Liquids 3 4 Gas Processing Plant Export Pipelines Sales Gas LPG LPG C5+ Treated Water 5 6 LPG and C5+ Storage and Terminal Umm Qasar LPG C5+