ABU DHABI NATIONAL OIL COMPANY (ADNOC) EPC FOR DALMA GAS DEVELOPMENT PROJECT CONTRACT AGREEMENT NO: 6000001102 (A) PROJECT NO: P4331432 DOCUMENT TITLE: METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING Rev Page DOCUMENT NO:- VF0133-CF0001-28-MES-0001 B01 1 of 16 ABU DHABI NATIONAL OIL COMPANY (ADNOC) EPC FOR DALMA GAS DEVELOPMENT PROJECT CONTRACT AGREEMENT NO: 6000001102 (A) PROJECT NO: - P4331432 MES METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING PACKAGE-A (OFFSHORE FACILITIES) This document is developed from FEED document number: NA CONTRACTOR DOC NO:- 8405-112A-X007-005 B01 19-Sept-23 IFA ISSUED FOR APPROVAL ST KB RM A01 24-May-23 ICR ISSUED FOR COMPANY REVIEW ST KB RM Rev Date (DD/MM/YY YY) Status Status Description Prepared Reviewed Approved This Document is intended for use by ADNOC and its nominated Consultants, Contractors, Manufacturers and Suppliers. Page 1 of 16 Uncontrolled When Printed ABU DHABI NATIONAL OIL COMPANY (ADNOC) EPC FOR DALMA GAS DEVELOPMENT PROJECT CONTRACT AGREEMENT NO: 6000001102 (A) PROJECT NO: P4331432 DOCUMENT TITLE: METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING Rev Page DOCUMENT NO:- VF0133-CF0001-28-MES-0001 B01 2 of 16 SUMMARY OF DOCUMENT REVISIONS Rev. Date No. Revised Section Revised A01 24/05/2023 N/A B01 19/09/2023 * Revision Description Issued For Company Review Issued for Approval *. Revision changes are Highlighted in Blue Italic SUMMARY OF HOLDS Hold No. Section / Page Hold Description This document is produced in compliance to FEED Documents and further amendment made as per RFT, Tender clarification and Tender Bulletins. Page 2 of 16 Uncontrolled When Printed PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 Contents 1. INTRODUCTION................................................................................................................ 4 1.1 PROJECT BACKGROUND .................................................................................... 4 1.2 PROJECT OVERVIEW........................................................................................... 4 1.3 BRIEF PROJECT FACILITIES ............................................................................... 4 2. PURPOSE ......................................................................................................................... 6 3. ABBREVIATIONS .............................................................................................................. 6 4. DEFINITIONS .................................................................................................................... 7 5. PROJECTS CODES AND STANDARDS ........................................................................... 8 6. REFERENCE DOCUMENTS ............................................................................................. 8 6.1 INTERNATIONAL CODES AND STANDARDS ................................................................. 8 6.2 ADNOC-COMPANY CODES AND STANDARDS .............................................................. 9 6.3 PROJECT DOCUMENTATION ........................................................................................ 10 7. ORDER OF PRECEDENCE............................................................................................. 12 8. RESPONCIBILITIES ........................................................................................................ 12 9. PROCEDURE .................................................................................................................. 12 10 ATTACHMENT................................................................................................................. 16 DOCUMENT CLASS - 1 Printed Page 3 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 1. INTRODUCTION 1.1 PROJECT BACKGROUND ADNOC has initiated development of new gas reserves, namely Dalma Gas Development (DGD) project in Northwest offshore region of Abu Dhabi. DGD Project is an integral part of the overall efforts to develop these untapped hydrocarbon reserves, with priority given to produce 340 MMscfd of raw gas from Satah, Hair Dalma and Bu Haseer fields by 2024. The overall DGD project development shall comprise of offshore facilities (PKG-A) and onshore facilities on Arzanah Island (PKG-B) to export gas to Habshan and export condensate to Zirku Island. The DGD project has now moved into EPC stage 1.2 PROJECT OVERVIEW The overall DGD Project development shall comprise of the following works: • Installation of Unmanned Wellhead Platform topsides in Satah, Bu Hasser and Hair Dalma fields. • Full Well Stream transfer to Arzanah Island • Processing facilities and power generation at Arzanah island. • Gas Export via tie-in to the 42” gas export pipeline to Habshan. • Condensate Export to Zirku Island. • Subsea pipelines, umbilical, composite cable and FO cables. • Infrastructure and Enabling facilities at Arzanah Island. 1.3 BRIEF PROJECT FACILITIES 1.3.1 Offshore Facilities – Package A The scope of work under offshore facilities (PKG-A) comprises of: • Three new unmanned Wellhead Platforms in Satah (ST WHP-10), Bu Haseer (BH-03) and Hair Dalma (HD T-4) fields along with necessary modifications on Jackets. Jacket design and installation for these three WHPs are by OTHERS. • Removal of existing topside and replacing it with new topsides for Hair Dalma HD-03 Wellhead. • New gas producer subsea pipelines including associated risers and other appurtenances. o o o o • Hair Dalma (HD T-4) Platforms to Arzanah Island. Satah (ST WHP-10) Platform to Arzanah Island. Bu Haseer (BH-03) Platform to Arzanah Island. New subsea umbilical including associated J-tubes and shore approach: o o o o DOCUMENT CLASS - 1 Printed Hair Dalma HD-03 platform to Hair Dalma (HD T-4) platform. Arzanah Island to Satah (WHP-10) Platform. Arzanah Island to Bu haseer (BH-03) Platform. Arzanah Island to Hair Dalma (HD T-4) Platform. Hair Dalma (HD T-4) platform to Hair Dalma HD-03 platform. Page 4 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 DOCUMENT CLASS - 1 Printed • New gas export subsea pipeline from Arzanah Island to existing IGD-E tower (KP38) including associated riser, pig receiver, and tie-in to existing 42” IGD-E pipeline along with modifications to existing topsides on the IGD-E tower (KP-38). • New subsea composite cable from Arzanah Island to IGD-E tower (KP-38) including associated J-tube and shore approach. • New condensate export subsea pipeline from Arzanah Island to Zirku Island, Tiein to Zirku Island Facilities, shore approaches, shore pull-in and piggybacked Fibre Optic Cables. • Interface with COMPANY novate LLI i.e.Umbilicals and associated TUTU Panels. Page 5 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 2. PURPOSE NPCC (Here after CONTRACTOR) has awarded the scope of Piping Pre-fabrication of EPC for DALMA GAS DEVELOPMENT PROJECT to Emarat Aloula Industies (Here after EAI). This Method statement provides guidelines for Inconel 625 Buttering on Inconel 625-Cladded CS/LTCS Pipes during piping fabrication works carried out by Emarat Aloula Industries (EAI) in accordance with the quality and contractual requirements of the project. It set out minimum quality control activities to be executed during execution of the activities at EAI Mussafah yard. This procedure describes the step by step activities performed during the execution of Weldolet fitting on cladded pipes during piping prefabrication. . 3. ABBREVIATIONS ADMA-OPCO Abu Dhabi Marine Operating Comapany ADNOC Abudhabi National Oil Company AFC Approved for Construction BP British Petroleum DGD Dalma Gas Development CA Corrective Action CAR Corrective Action Request CONT Contractor CPY Company DC Document Controller EDMS Electronic Data Management System EPC Engineering, Procurement and Construction EAI Emarat Aloula Industries (Sub-Contrcator) FEED Front End Engineering Design IRN Inspection Release Note ITP Inspection and Test Plan KPI Key Performance Indicator KOM Kick Off Meeting MRV Material Receive Voucher MOM Minutes of Meeting MTC Material Test Certifcate MTR Material Treaceabilty Report MTO Material Take Off PO Purchase Order DOCUMENT CLASS - 1 Printed Page 6 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 PQR Procedure Qualification Recore QA/QC Quality Assurance/Quality Control QCI Quality Control Inspector QHSE Quality, Health, Safety & Environment QI Quality Incharge PO Purchase Order PQP Project Quality Plan RFI Request for Inspection SOW Scope Of Work TQ Technical Query TPI Third Party Inspector WPS Welding Procedure Specification 4. DEFINITIONS The following definitions apply to terms used within this document: Project Number P4331432 Project EPC FOR DALMA GAS DEVELOPMENT ADNOC Abudhabi National Oil Company PMT Project Management Team PMC Project Management Consultant appointed by the COMPANY to Provide Management Consultancy services for the Project. Works Any Works and services performed under the AGREEMENT, as further described in the scope of work , including the works Documentation and any other deliveriables specified in the AGREEMENT. Contractor National Pertroleum Construction Company (NPCC), appointed EPC contractor by COMPANY to perform the EPC SCOPE OF WORK for the project. Subcontractor Emarat Aloula Industires, appointed as SUBCONTRACTOR BY NPCC to perform Piping Pre-Fabrication.SUBCONTRACTOR means any person or COMPANY to whom execution of any part of the SERVICES is subcontracted by the CONTRACTOR or to whom the CONTRACTOR proposes to subcontract any part of the EPC works if awarded the EPC CONTRACT and includes the legal successors or permitted assigns os such person. Vendor Person, fims, partnerships, companies, bodies, entities or a combination thereof who are providing GOODS. SHALL The word Shall is understood to be Mandatory to comply with the DOCUMENT CLASS - 1 Printed Page 7 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 requirements SHOULD The word Should is understood to be strongly recommended to comply with the requirement. MAY Indicates a possible course of an action 5. PROJECTS CODES AND STANDARDS The CONTRACTOR Shall comply and ensure compliance from its SUBCONTRACTORS with UAE Legislation and Environmental Regulations, applicable International Laws & Regulations,ADNOC Guidelines/, ADNOC/ COMPANY-Specifications and Standards, ADNOC HSE Regulations, Standards, Code of Practice and relevant International code and Standards. Only latest version of all applicable codes, Specifications and standards shall be used by the CONTRACTOR and SUBCONTRACTORS. Where equal but conflicting requirements are identified between regulations, codes, standards, the order of precedence shall be; 1) UAE Statutory Legisalation and Regulations 2) ADNOC HSE Regulations and standards 3) Project Data Sheet 4) Project Specifications and Standards 5) Approved Amendments of ADNOC Offshore Engineering specifications, Standards, Procedures 6) ADNOC Engineering specification, Standards and Procedures 7) ADNOC Guidelines, Procedures 8) International Codes and Standards 6. REFERENCE DOCUMENTS Reference shall be made to the following documents: 6.1 INTERNATIONAL CODES AND STANDARDS S.No Document Number Document Description 1 ISO 9001: 2015 Quality Management Systems Requirements 2 ASME B31.3 :.2020 3 ASME B16.5 :2020 4 ASME B16.20 :2017 DOCUMENT CLASS - 1 Printed Process Piping Pipe Flanges and Flanged Fittings NPS 1/2” through NPS 24” Metallic Gaskets for Pipe Flanges: RingJoint, Spiral Wound, and Jacketed Page 8 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 S.No Document Number Document Description 5 ASME B36.19 :2018 Stainless Steel Pipe 6 ASME SEC II (Ed.2021 DT01.07.2021) Materials 7 ASME SEC V (Ed.2021 DT01.07.2021) Non-Destructive Examination 6.2 ADNOC-COMPANY CODES AND STANDARDS S.No Document Number Document Description 1 SP-1007 Rev.0 Quality Assurance and Quality Control Requirements for Construction Works 2 SP-1009 Rev.2 Specification for Requirements for Projects contractor Quality system 3 SP-1035 rev 1 Pre and Post Weld Heat Treatment of Ferrous Materials 4 SP-1064 rev 1 Integrity Requirement for Baseline Survey of New Equip. in projects 5 SP-1108 Rev.1 Specification for fabrication of Fixed Offshore Steel Structures 6 SP-1107 Rev. Specification for Strucutal steel Material Offshore Structures 7 SP 1131 Rev 1 Specification for Piping Classification 8 A0-ENG-S-SP-oo1 Rev.1 Specification for steel material for Offshore Structures 9 Annexure- 9E Quality Management Requirements 10 CP 108 Rev.1 SEP 2016 Minimum Recommended Spacing for Welded Connections 11 SP-1031 Rev.0 DEC 1992 Quality Control Personnel for Fabrication and Construction 12 SP-1035-Rev.1- May,2006 Pre & Post weld Heat Treatments of Ferrous Materials 13 EP-GIS 18-011 24 MAY 2016 14 EP-GIS 18-012 24 May 2016 DOCUMENT CLASS - 1 Printed Specification for Welded Fabrication and Construction Specification for Procurement, Storage, and Control of Welding Consumables Page 9 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 S.No Document Number Document Description 15 EP-GIS 36-103 30 Jun 2015 Specification for Positive Materials Identification (PMI) 16 EP-GIS 42-103 31 MAR 2016 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 17 GP 18-01 27 AUG 20212 Welded Fabrication and Construction 18 GP 42-10 15 DEC 2014 Group Practice GP 42-10 Piping Systems (ASME B31.3) 6.3 PROJECT DOCUMENTATION A. Contractor Documents: S.No Document Number Document Description 1 CA0000-63-PLN-0001 Project Quality Plan 2 CA0000-63-PRO-0001 NCR Procedure 3 CA0000-63-PRO-0024 Corrective and Preventive Action Procedure 4 CA0000-63-PRO-0020 Project Quality Audit Procedure 5 CF0000-28-BOD-0001 Piping Design Basis CF0000-28-SPE-0017 Piping Specification for Fabrication, Erection and Testing 7 CF0000-28-STD-0002 Piping Construction Standards 8 CF0000-28-SPE-0020 6 9 Specification for Pressure Testing of Piping Project Welding Specification (Pressure Vessels & Piping). CA0000-63-SPE-0002 B. Sub-Contractor Documents: S.No Document Number Document Description 1 VF0133-CF0001-28-REG-0001 Supplier Data Register 2 VF0133-CF0001-28-PRO-0001 WPS Register along with WPS & PQR 1,2,3 etc 3 VF0133-CF0001-28-PRO-0002 Welder Performance Qualification (WPQ) Register as per ASME Sec IX 4 VF0133-CF0001-28-ITP-0001 ITP for Piping Fabrication,Welding & NDE 5 VF0133-CF0001-28-PRO-0003 Piping Fabrication Procedure 6 VF0133-CF0001-28-PRO-0004 Painting Procedure 7 VF0133-CF0001-28-PRO-0005 Visual Examination Procedure DOCUMENT CLASS - 1 Printed Page 10 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 S.No Document Number Document Description 8 VF0133-CF0001-28-PRO-0006 Radiographic Examination Procedure 9 VF0133-CF0001-28-PRO-0007 Magnetic Particle Examination Procedure 10 VF0133-CF0001-28-PRO-0008 Liquid Penetrant Examination Procedure 11 VF0133-CF0001-28-PRO-0009 Hardness Test Procedure 12 VF0133-CF0001-28-PRO-0010 Ferrite Testing Procedure 13 VF0133-CF0001-28-PRO-0011 Positive Material Identification Procedure 14 VF0133-CF0001-28-PRO-0012 Post Weld Heat Treatment Procedure Local 15 VF0133-CF0001-28-PRO-0013 Post Weld Heat Treatment Procedure Furnace 16 VF0133-CF0001-28-PRO-0014 Ultrasonic Testing Procededure 17 VF0133-CF0001-28-WIN-0001 NDE Personnel List with Certification 18 VF0133-CF0001-28-PRO-0015 Galvanization Procedure 19 VF0133-CF0001-28-PRO-0016 Material Control Procedure 20 VF0133-CF0001-28-PRO-0017 Welding Consumable Control Procedure 21 VF0133-CF0001-28-PRO-0018 Weld Repair Procedure 22 VF0133-CF0001-28-PVD-0001 MRB Index for Piping 23 VF0133-CF0001-28-PLN-0001 Project Quality Plan 24 VF0133-CF0001-28-PRO-0019 Baseline Survey Procedure 25 VF0133-CF0001-28-MES-0001 Method Statement for Inconel Buttering on Cladded Piping for Weldolet Fitting 26 VF0133-CF0001-28-ITP-0002 ITP for Surface Preparation & Painting Piping 27 VF0133-CF0001-28-PRO-0020 Pickling & Passivation Procedure 28 VF0133-CF0001-28-PRO-0021 RT Digitalization Procedure 29 VF0133-CF0001-28-PRO-0041 30 VF0133-CF0001-28-PRO-0042 31 VF0133-CF0001-28-PRO-0043 32 VF0133-CF0001-28-PRO-0044 DOCUMENT CLASS - 1 Printed Page 11 of 17 Welding Procedure Specification For Piping: 3100-WPS-020 Welding Procedure Specification For Piping: 3100-WPS-021 Welding Procedure Specification For Piping: 3100-WPS-022 Welding Procedure Specification For Piping: 3100-WPS-023 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 S.No Document Number Document Description 33 Welding Procedure Specification for Piping - 3100-WPS-028 VF0133-CF0001-28-PRO-0049 7. ORDER OF PRECEDENCE CONTRACTOR shall comply (and ensure compliance by all its SUBCONTRACTORs) with UAE Legislation and Environmental Regulations, ADNOC Guidelines / Codes of Practice, COMPANY Engineering Specifications, Standards and Procedures and HSE Regulations, BP Standards, Guidance and Practice Documents and all relevant International Codes and Standards. In case of conflict, among any referenced regulations, codes and standards and technical specifications, CONTRACTOR shall notify COMPANY of any conflict and confirm resolution of the same in accordance with the order of precedence specified below. • UAE Statutory Legislation and Regulations • ADNOC Code of Practices and new HSE Standards • Project Data Sheets • Project Specifications • ADNOC Offshore (ADMA-OPCO) Engineering Specifications, Standards, Procedures and HSE Documents • BP Engineering Technical Practices • International Codes & Standards 8. RESPONCIBILITIES Welding Supervisor Welding Supervisor is responsible with regards to above scope, to ensure proper implementation of Ovelay Buttering Procedure as prescribed in section 9. QC Inspector QC inspectors are responsible to monitor the Buttering activities and coordinate with COMPANY or CONTRACTOR for when required. 9. PROCEDURE Method statement covers fabrication and welding by buttering for the branch of set-on type weldolet on Inconel 625 Cladded Carbon steel/Low Temperature Carbonsteel Pipe, and to be strictly adhered during the whole operation. 9.1 Measuring the Weldolet Inside diameter “X”and the Maximum outside diameter “Y”from the end where to be welded to the main pipe. DOCUMENT CLASS - 1 Printed Page 12 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 9.2 Mark the center point of the Weldolet “O” and 8 No. Peripheral equidistant points “P” on the header pipe having “O” as center at a radius “OP”, OP = (Y+20)/2 9.3 Using Conical Drilling Bit of diameter (IDL + “X”-4mm), drill a hold on header pipe with “O” as center to form inside diameter of Inconel lip. DOCUMENT CLASS - 1 Printed Page 13 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 9.4 Using flat drill bit, on the main pipe drilla hole at the center point “O” with diameter “ODL” = X+14mm to form Outside Diameter of the Inconel lip. Drill bit should touch the upper part from the Inconel of the main pipe internal diameter 9.5 Using Tungsten Carbide grinding tools, grind the remaining carbonsteel from the curved top part of the inconel lip area. Note : Tools and equipment shall be dedicated to Exotic material work. 9.6 Wipe the top surface of the Inconel lip using Copper Sulphate (CuSO4) Soultion with tissue Paper. The area shall be free CS/LTCS free. If any discoloration is detected steps mentioned in 9.5 and 9.6 shall be repeated untill no discoloration is visible. 9.7 Carry out domension measurement at 8 locations of the hole eccentricity using point “P” as referance. Record the values in attachment 1. DOCUMENT CLASS - 1 Printed Page 14 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 9.8 Deposite Stinger weld passes (minimum 3Layers) on the pheriperal Carbon steel area using SMAW Process in accordance to the approved applicable WPS, the deposite weld thickness shall be such that the diameter of the weld overlay “DWOL”=IDL or X-4mm. 9.9 Carryout Centric Drilling using the Previously marked Points “P” as referance, the diameter shall be equal to “X”. Grind flush the excess deposited weld metal to make it flush with base material of the header pipe outside diameter. 9.10 Carry out final dimension measurement for the weldoverlay thickness at 8 Locations using marked point “O” as reference. Record the values in attachment 1. The minimumacceptable thickness shall be 6 mm. DOCUMENT CLASS - 1 Printed Page 15 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 9.11 Carry Out PT on the Welded Surface to confirm non existence of surface defects prior to fitup of the Weldolet. 10 ATTACHMENT Attachment 1 : Report for verification of Inconel Buttering On Cladded Piping For Weldolet Fitting DOCUMENT CLASS - 1 Printed Page 16 of 17 Uncontrolled When PROJECT NO: P4331432 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev VF0133-CF0001-28-MES0001 METHOD STATEMENT FOR INCONEL BUTTERING ON CLADDED PIPING FOR WELDOLET FITTING B01 Attachment 1 Report for verification of Inconel Buttering On Cladded Piping For Weldolet Fitting EAI Job No. Date ISO No. Rev. No Spool No. Joint No Weldolet Size Header Pipe Size (Inconel 625) (CS/LTCS+ Inconel 625) 0◦ 45◦ 90◦ 135◦ 180◦ 225◦ 270◦ 315◦ TC(mm) TCI(mm) TI (mm) (TCI-TC) X= RP= IDL= ODL= Verified By: DOCUMENT CLASS - 1 Printed Page 17 of 17 Uncontrolled When