Coordination activities with other departments. engineering activities with high seismic zone (Static and Rotating Equipment’s, Reboiler lines, PSV lines, Flare lines, Pipe Rack loadings, Structure loadings, Vessel clip data , etc..) than 300 critical lines in short time. Piping engineering activities. I.e. lines connected to static and rotating equipment’s. Analysis of jacketed lines. energy obtaining from the Byproducts. The plant consist of two major sections gasification and high pressure Steam Piping, Wind and seismic analysis. Spring hanger selection and preparation of spring Interaction with departments like piping, process, civil and instrumentation for carrying out analysis. Spring hanger selection and preparation of spring log, Performed flange leakage check using