Title Page
Project Name

Location
Prepared by

Conducted on
Commissioning Checklist
HVAC System
Installation
Cabinet and General Installation
Permanent labels affixed, including for fans
Pass
Fail
N/A
Casing condition good: no dents, leaks, door gaskets installed
Pass
Fail
N/A
Access doors close tightly - no leaks
Pass
Fail
N/A
Boot between duct and unit tight and in good condition
Pass
Fail
N/A
Vibration isolation equipment installed & released from shipping locks
Pass
Fail
N/A
Maintenance access acceptable for unit and components
Pass
Fail
N/A
Sound attenuation installed
Pass
Fail
N/A
Thermal insulation properly installed and according to specification
Pass
Fail
N/A
Instrumentation installed according to specification (thermometers, pressure gages,
flow meters, etc.)
Pass
Fail
N/A
Clean up of equipment completed per contract documents
Pass
Fail
N/A
Filters installed and replacement type and efficiency permanently affixed
Pass
Fail
N/A
Piping and Coils
No leaking apparent around refrigerant fittings
Pass
Fail
N/A
All coils are clean and fins are in good condition
Pass
Fail
N/A
All condensate drain pans clean and slope to drain per spec
Pass
Fail
N/A
OSAT, MAT, SAT, RAT sensors properly located and secure (related OSAT sensor shielded)
Pass
Fail
N/A
Sensors calibrated
Pass
Fail
N/A
If split system, refrigerant piping in good condition and suction insulated
Pass
Fail
N/A
P/T plugs and isolation valves installed per drawings
Pass
Fail
N/A
Fans and Dampers
Supply fan and motor alignment appear correct
Pass
Fail
N/A
Supply fan belt tension & condition good
Pass
Fail
N/A
Supply fan protective shrouds for belts in place and secure
Pass
Fail
N/A
Supply fan area clean
Pass
Fail
N/A
Supply fan and motor properly lubricated
Pass
Fail
N/A
Return/exhaust fan and motor aligned
Pass
Fail
N/A
Return/exhaust fan belt tension & condition good
Pass
Fail
N/A
Return/exhaust fan protective shrouds for belts in place and secure
Pass
Fail
N/A
Return/exhaust fan area clean
Pass
Fail
N/A
Return/exhaust fan and motor lube lines installed and lubed
Pass
Fail
N/A
Filters installed and replacement type and efficiency permanently affixed--construction
filters removed
Pass
Fail
N/A
Filter pressure differential measuring device installed and functional (magnahelic,
inclined manometer, etc.)
Pass
Fail
N/A
All dampers close tightly
Pass
Fail
N/A
All damper linkages have minimum play
Pass
Fail
N/A
Motors: premium efficiency verified, if specified?
Pass
Fail
N/A
Compressor and Condenser
Refrigerant sight glass clear of bubbles (if OSAT > 70F)
Pass
Fail
N/A
Moisture indicator shows no moisture
Pass
Fail
N/A
Correct oil level (check site glass during operation)
Pass
Fail
N/A
Compressors and piping were leak tested, as required
Pass
Fail
N/A
Crankcase heater on when unit is off
Pass
Fail
N/A
Condenser coils clean and in good condition (air cooled)
Pass
Fail
N/A
Adequate clearance for airflow around condenser
Pass
Fail
N/A
Ducts (preliminary check)
Pass
Fail
N/A
Duct joint sealant properly installed
Pass
Fail
N/A
No apparent severe duct restrictions
Pass
Fail
N/A
Turning vanes in square elbows as per drawings
Pass
Fail
N/A
OSA intakes located away from pollutant sources & exhaust outlets
Pass
Fail
N/A
Pressure leakage tests completed
Pass
Fail
N/A
Branch duct control dampers operable
Pass
Fail
N/A
Balancing dampers installed as per drawings and TAB’s site visit
Pass
Fail
N/A
Electrical and Controls
Power disconnects in place and labeled
Pass
Fail
N/A
All electric connections tight
Pass
Fail
N/A
Proper grounding installed for components and unit
Pass
Fail
N/A
Safeties in place and operable
Pass
Fail
N/A
Current overload heaters installed and correct size
Pass
Fail
N/A
Auxiliary heaters installed
Pass
Fail
N/A
Sensors calibrated
Pass
Fail
N/A
All building control system interlocks hooked up with packaged controls and functional
Pass
Fail
N/A
Enthalpy control and sensor properly installed (if applicable)
Pass
Fail
N/A
Related thermostats are installed
Pass
Fail
N/A
Related building automation system points are installed
Pass
Fail
N/A
All control devices and wiring complete
Pass
Fail
N/A
Testing, Adjusting and Balancing (TAB)
Installation of system and balancing devices will allow balancing to be done per
specified NEBB or AABC procedures & contract docs
Pass
Fail
N/A
Safeties installed and safe operating ranges are established
Pass
Fail
N/A
If unit is started and will be running during construction: have quality filters on RA grills,
etc. to minimize dirt in the ductwork and coils and in any finished areas. Verify moisture
migration is not a problem due to improper pressures between spaces.
Pass
Fail
N/A
Operation
Supply fan rotation correct
Pass
Fail
N/A
Return / exhaust fan rotation correct
Pass
Fail
N/A
No unusual noise or vibration in supply and exhaust fans
Pass
Fail
N/A
Condenser fan rotation correct (air cooled)
Pass
Fail
N/A
Condenser fan acceptable noise and vibration (air cooled)
Pass
Fail
N/A
Measure line to line voltage imbalance for 1/3 of the compressors: Compressor 1 Phase:
(%Imbalance = 100 x (avg. - lowest) / avg.) Record all three-phase voltages. Imbalance
less than 2%?
Yes
No
N/A
Compressor 2 Phase: (%Imbalance = 100 x (avg. - lowest) / avg.) Record all three-phase
voltages. Imbalance less than 2%?
Yes
No
N/A
Record full load running amps for each compressor. Running less than max?
Yes
No
N/A
Record full load running amps for each condenser fan. Running less than max?
Yes
No
N/A
Fans > 5 hp Phase Checks: (% imbalance = 100 x (avg. - lowest) / avg.) Imbalance less
than 2%?
Yes
No
N/A
Inlet vanes aligned in housing, actuator spanned, modulate smoothly and proportional
to input signal and EMS readout.
Pass
Fail
N/A
All dampers (OSA, RA, EA, etc.) stroke fully without binding and spans calibrated and BAS
reading site verified
Pass
Fail
N/A
Valves stroke fully and easily and spanning is calibrated
Pass
Fail
N/A
Valves verified to not be leaking through coils when closed at normal operating pressure
Pass
Fail
N/A
The HOA switch properly activates and deactivates the unit
Pass
Fail
N/A
Safeties installed and safe operating ranges for this equipment provided to the
commissioning agent
Pass
Fail
N/A
Specified sequences of operation and operating schedules have been implemented with
all variations documented
Pass
Fail
N/A
Specified point-to-point checks have been completed and documentation record
submitted for this system
Pass
Pumping System
Installation
Fail
N/A
General Installation
Label permanently affixed
Pass
Fail
N/A
Pumps installed in place and properly grouted, bases filled
Pass
Fail
N/A
Vibration isolation devices installed and functional
Pass
Fail
N/A
Factory alignment checked and appears correct
Pass
Fail
N/A
Field alignment, if required, completed
Pass
Fail
N/A
Seismic anchoring installed
Pass
Fail
N/A
Temperature and pressure gauges and sensors installed
Pass
Fail
N/A
Pump and motor lubricated
Pass
Fail
N/A
Pipe fittings completed and piping properly supported
Pass
Fail
N/A
No leaks in pipe fittings and accessories at pump
Pass
Fail
N/A
Piping and pump properly insulated
Pass
Fail
N/A
Strainers in place and cleaned out
Pass
Fail
N/A
Piping system properly flushed
Pass
Fail
N/A
Valves properly tagged
Pass
Fail
N/A
Electrical and Controls
Disconnect switches in place and labeled
Pass
Fail
N/A
Electrical connections tight
Pass
Fail
N/A
Proper grounding installed for components and unit
Pass
Fail
N/A
Motor overloads calibrated
Pass
Fail
N/A
Control system interlocks hooked up and functional
Pass
Fail
N/A
Control devices, tubing and wiring complete
Pass
Fail
N/A
VFD
VFD powered up and wired to controlled equipment
Pass
Fail
N/A
VFD interlocked to control system
Pass
Fail
N/A
Pressure or other controlling sensor properly located and per drawings and calibrated
Pass
Fail
N/A
Controller location not subject to excessive temperatures
Pass
Fail
N/A
Controller location not subject to excessive moisture or dirt
Pass
Fail
N/A
Controller size matches motor size
Pass
Fail
N/A
Internal settings designating the application are correct
Pass
Fail
N/A
Input of motor FLA represents 105% to 115% of motor FLA rating
Pass
Fail
N/A
Appropriate Volts vs Hz curve is being used; energy saver on?
Pass
Fail
N/A
Accel and decel times are around 10-50 seconds, except for special applications.
Pass
Fail
N/A
Upper frequency limit set at 100%, unless explained otherwise
Pass
Fail
N/A
Unit is programmed with written programming record available
Pass
Fail
N/A
VFD kW demand at panel matches BAS readout
Pass
Fail
N/A
Testing, Adjusting and Balancing (TAB)
Installation of system and balancing devices will allow balancing to be done per
specified NEBB or AABC procedures & contract docs
Pass
Fail
N/A
Operation
The HOA switch properly activates and deactivates the unit under manual and
automatic control.
Pass
Fail
N/A
Pump rotation verified correct
Pass
Fail
N/A
No unusual noise or vibration
Pass
Fail
N/A
No leaking apparent around fittings
Pass
Fail
N/A
Measure line to line voltage phase imbalance for each pump: (%lmbalance = 100 x (avg.
- lowest) / avg.) Record imbalance of each pump. Imbalance less than 2%?
Yes
No
N/A
Record full load running amps for each pump. FL amps x factor (Max amps). Running
less than max?
Yes
No
N/A
Specified sequences of operation and operating schedules have been implemented with
variations documented
Pass
Fail
N/A
Specified point-to-point checks have been completed and documentation record
submitted for this system
Pass
Fail
N/A
Piping System
Installation
Piping
Pipe fittings complete and pipes properly supported allowing for thermal expansion and
contraction and building expansion joints.
Pass
Fail
N/A
Pipe joints properly installed
Pass
Fail
N/A
Required seismic anchoring installed
Pass
Fail
N/A
Pipes properly labeled
Pass
Fail
N/A
Pipes properly insulated
Pass
Fail
N/A
Piping properly sloped
Pass
Fail
N/A
Proper construction isolation
Pass
Fail
N/A
Strainers in place and clean
Pass
Fail
N/A
Isolation valves and balancing valves installed
Pass
Fail
N/A
Test ports (P/T) installed near all control sensors and as per spec
Pass
Fail
N/A
Piping system properly flushed and cleaned and temporary piping removed
Pass
Fail
N/A
10% of strainers and Owner-selected low-point drains opened and witnessed by Owner
to be clean.
Pass
Fail
N/A
Piping hydrostatic pressure test completed according to contract documents
Pass
Fail
N/A
No leaking apparent around fittings
Pass
Fail
N/A
ASME pressure vessel data sheet or certification tag posted and inspection complete for
each expansion tank and storage tank
Pass
Fail
N/A
Expansion tanks verified to not be air bound and system completely full of water. System
purged of air.
Pass
Fail
N/A
Air vents and bleeds at high points of systems functional
Pass
Fail
N/A
Water hammer arrestors installed and tested
Pass
Fail
N/A
Backflow preventer proper location
Pass
Fail
N/A
Adequate depth of bury for service piping
Pass
Fail
N/A
Cross connection protection
Pass
Fail
N/A
Valves
Valve tags permanently affixed
Pass
Fail
N/A
Valves installed in proper direction
Pass
Fail
N/A
Pressure reducing valves set at proper pressure
Pass
Fail
N/A
Fail
N/A
No leaks
Pass
Flexible connections at equipment installed
Pass
Fail
N/A
Dielectric fittings for dissimilar metals installed
Pass
Fail
N/A
Vibration Isolation installed
Pass
Fail
N/A
Fire-rated pipe penetrations installed properly
Pass
Fail
N/A
Valves that require a positive shut-off are verified to not be leaking when closed at
normal operating pressure.
Pass
Fail
N/A
Sensors and Gages
Temperature, pressure and flow gages and sensors installed.
Pass
Fail
N/A
Testing, Adjusting and Balancing (TAB)
Installation of system and balancing devices allowed balancing to be completed
following specified NEBB or AABC procedures and contract documents
Pass
Fail
N/A
Lighting System and Controls
Installation
Lighting Fixtures and Switches
Light switches are located per plans
Pass
Fail
N/A
Light switches are labeled with proper ID to match drawings or field changes
Pass
Fail
N/A
Light switch is controlling the fixtures in the area indicated on design drawings
Pass
Fail
N/A
Fixtures are properly supported for seismic zone
Pass
Fail
N/A
Verify proper lamp type is installed in each fixture to match fixture schedule and
specifications
Pass
Fail
N/A
Lighting Controls
Lighting control is installed per manufacturer recommendations
Pass
Fail
N/A
Lighting control is calibrated per manufacturer checklist
Pass
Fail
N/A
Completion
Additional Comments
Inspector Name & Signature

Installer Name & Signature

Contractor Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's
solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should
independently determine whether the template is suitable for your circumstances.
Download