ENGR. JAMIL AHMED Cell +966583072094 E-mail: engrjamilme72@yahoo.com Iqama: Transferable with KSA valid driving license Career Summary • As Professional Mechanical Engineer, I have served in KSA for 15 years of construction experience in various infrastructure works with diverse types of mega projects such as Pumping station, Power & Water transmission line system, water storage tanks, wastewater treatment plants (STP), Potable line & drainage distribution lines, irrigation lines, Sea water Desalination plant process & power plant, High rise building, heat & ventilation Airconditioning work (HVAC), Firefighting pipeline work, & infrastructure projects PMC/CM work in Saudi Arabia. Project’s summary • Site Field Mechanical Engineer in Mining & Metals Gold Project as PMC role in Bechtel engineering company Saudi Arabia • I worked as a Site Mechanical Engineer in Desalination plant in Jeddah western region area in Jizan with SWCC with capacity 850000m3/day at Furazan Island with Dar Engineering Company • I have worked as Site Mechanical Engineer in al Khatib & Alemi Saudi Consolidated Engineering Company, Saudi Arabia for SWCC Strategic reservoirs projects in Makkah • I have Worked as Site Mechanical Engineer in NKY Consultant Architecture Contracting Company in King Abdullah Project –KAP2 (Ministry of Interior – Military & forces Project) for high rise buildings in Riyadh & Al Baha areas • I have Worked as a Site Mechanical Engineer for 380KV/132KV substation work in Saudi service Electromechanical works Company (SSEM), Saudi Arabia (Al-Rashid Group) all over K.S.A • I Have Worked as Mech Engineer in Aramco Projects in Saudi Arabia in Abdul Ali construction Company Dammam, Abqaiq, Al Shuaiba • I have worked as Mechanical Engineer with SIEMENS (Pakistan) Engineering Company ltd, at Bhat Gas Filed Project Sindh, Pakistan Career Path • Ambitious, motivated Mechanical Engineer/ Inspection Engineer Searching for a middle level position in a leading, national / multinational engineering company. • Expertise: Pumping installation Piping Fabrication, Steel Structure Steel, Planning, Execution, Tank’s fabrication, Maintenance, Project Management, HVAC, irrigation network firefighting, water supply and drainage network design and supervision Rotary & static equipment installation, Health and Safety Champion in each project, • Bechtel Saudi Arabian Company K.S.A • Customer: MA’ADEN GOLD AND BASE METALS (MA’ADEN)- PMC Project Mansoura Massa rah Gold Project 01/01/2021 continue. • As Field Mechanical Engineer, my core responsibilities to Coordinate and supervise the work of all Mechanical related activities and operations • Receive / action Request(s) for Information (RFIs) that apply to mechanical works • RFIs requiring design feedback will be directed to the Designer for response. Review responses for adequacy • Take the role of Preparation of Concept Design and undertake technical reviews of complete Mechanical systems for water transmission and distribution system including reservoirs, pumps and pumping stations, piping, valves, chemical dosing system, surge protection system, compressed air system, fire water system, irrigation system and HVAC system • I Check the Mechanical Engineering support to operational and construction sites/projects • Develop complete scope of Mechanical works, prepare specifications, and quantify related requirement • Participate in the procurement of Mechanical devices, equipment, and accessories Rotatory & Static • Implementing the latest applicable design and engineering Codes & Standards for all Assets of Project • I Manage, inspect, test, commission and documenting the construction of Mechanical equipment’s systems • To Participate in the innovation and implementation of new technologies particularly in relation to water networks & distribution network • As field Mechanical engineer Maintaining and improving Health and Safety practice at site construction work • As engineer I Able to prepare a complete scope of Mechanical works including detailed design narrative of the works, design drawings, as-builts, specifications and related quantities documents & make a report • Evaluate technical proposals from bidders for related design services or construction works • Planning and scheduling of Mechanical engineering design and design reviews for operational, construction and commissioning activities • Supervise, inspect, identify, and resolve any related non-conformity in Mechanical engineering design, construction and commissioning activities coming at site or changes in design • Review the engineering support during construction performed by contractors including reviewing technical submittals and shop drawings, responding to contractor queries, evaluating change requests, resolving field issues • Ability to utilize the BIM Technology and models in design, construction, and commissioning of the related works • During the site visit Monitoring and safeguarding site Health and Safety performance procedures at site working area • Assisting in the operation and optimization of the water supply network at site to the rout wise condition • As field Engineer, I Review the Contractor’s Mechanical change order proposals during the construction changes. • I am Prepared report weekly, monthly, progressively recommendations for Resident Engineer for review. • I Prepare recommendations for claims approval or rejection. for review and approval of mechanical submittals, including plumbing pumps and piping systems (drain waste & vent, domestic water), fire protection (pumps, piping, sprinkler heads), HVAC systems (VAV boxes, ductwork, process piping, chiller systems, controls, building management system) • Monitor’s construction contractor mechanical installation and testing activities, including piping, leak tests, ductwork & insulation, pumps, building management system, HVAC controls, domestic water systems, foundation de-watering system, etc. • Ensuring the correct installation of piping, pipe supports valves and other in-line equipment in accordance with the drawings, specifications, and standards. • During the construction to manage the leakage, sewage water, how to reduce non-renewable water, water conservation, • Ensuring the maintenance of the necessary cleanliness of piping systems and the use of dry air purges were necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area huge quantity in Processing plant following work to be follow-up. • Reviewing and checking designs, drawings, and data by other engineers or by suppliers • Preparation or review of engineering studies and reports • Preparation or review of material quantity estimates • Uses engineering computer aided design/computer aided engineering (CAD/CAE) tools • Prepares letters for replies to vendor correspondence. • Monitors project controls within discipline. • Reviews design documents of equipment manufacturers or subcontractors of a moderate degree of complexity and prepares comments and recommendations. • To Assists in preparation of forecasts, quantity take-offs and change orders • I Participates in a work environment that is based upon openness, trust, communication, teamwork, empowerment, innovation, and satisfaction DAR Engineering Company K.S.A • As Site Mechanical Engineer Company (SWCC/ Jeddah) Saudi Arabia -(1/1/20- 1/1/21) • Previous working in Satellite Desalination plant West Coast of Jizan Furazan Island & Qunfudah site 230000M3/day with SWCC Project working on Intake tower off shore grp pipe line, Gravity filter, Back wash tank, Air scour blower, Ro Pass-1, RO pass-11, Permeate water tank , lime stone filter, product water tank, permeate water co2 storage tank & dosing system, CIP system, chemical dosing system, Neutralization system, sludge settling system, Firefighting tank and Disinfection & PH correction system which includes Pumps ( Back wash pump, RO pass pump Low pressure & High pressure pump, product water pump, CO2 pump, flushing pump, potable pump, service & intake pump worked at checked flow & steel structure supporting & pipe line lying work construction of tank capacity of 1700000m3 for water storage & work on transmission line from Desalination plant existing tank SWCC plant purpose pipe Día (600mm to 1200mm). Review, all pipe Día HDPE, GIS, SS, GRP, PVC, UPVE ETC approve and process all mechanical technical submittals on shore & offshore work in Farzan Island & Qunfudah in Jizan. • Lead and Provide e technical support for implementation of the SWRO desalination projects, Working as the consultant on Owners Engineering mission with specific focus on the site construction supervision of the SWRO desalination Project • Review the EPC Contractor / OEM s site construction programmed of the SWRO plant and comments on the practically of implementation. Review the method statement of the SWRO Process related equipment and verify its compliance with reference to the project specification, applicable codes and standards and good industry practice carry out site inspections for the SWRO process equipment as per the ITPs method state montane advice Observation, Non- Conformity, and punch Points Verify whether adequate supervision from the OEMs is available for all major and critical equipment of the SWRO process. Verify whether the interface construction with the Client interfaces other sub – contractor interfaces is constructed in accordance with the drawings and method statements Verify the mechanical completion of the SWRO Plant Review the EPC Contractor / OEM documentation on the pre-commissioning, commissioning plants, Procedures, start-up and acceptance tests performance test and reliability test procedures Witness the pre-commissioning, commissioning, start-up, and acceptance test for the SWRP Process equipment. Witness the performance test of the SWRO Plant, verify whether the performance guarantees as per the EPC contractor are met Witness the reliability run test of the SWRO Plant and advice any major issues noticed in operation of the SWRO key process equipment & chemicals (Ferric Chloride, SBS, Coagulant, Caustics soda, Antiscalant, sodium hypochlorite, polyelectrolyte, CO2, chlorine di oxide, HCL, Naocl2 ) to use all chemicals to brings better quality of treatment water & equipment safer position manner maintained the water quality process checked SDI & the water quality every day to improve continuity of water supply, increasing environmental compliance. Support the OE Construction Manager to verify the functional guarantees and completion of the SWRO plant are met. Review the punch list of the SWRO equipment. Review the as- built documentation for the SWRO equipment. • • • • • • • • • • • • Khatib & Alemi Saudi Consolidated Engineering Company K.S.A As Site Mechanical Engineer (SWCC Reservoirs Phase-11 Makkah-Taif Project) • • • • • • • • • Saudi Arabia- (03/03/2019 – 1/01/20) Review material acquisitions RFIs, submittals, and ensure contract performance measures are met per the position discipline. Raising NCR for maintain Quality. Evaluate the project construction to ensure compliance with standards for mechanical systems Installation of plant piping and design review according to ASTM, ASME, API 650, 620 ,510, 570, AWS D 1.1, NFPA, AWWA standard’s To check the material (Supplied) incoming of the tanks in the light of the packing list and drawing & to report to my chief about any missed items or incorrect material such as: check the shell course sheets; its thickness; its quantities; its dimension Implementation & development of Commissioning plans & procedures Assists in engineering design drawings reviews Interacts with contractors, interprets design and specifications Deals with clients, tries to resolve problems within the scope of the design • • • • • • • • • • • • • • • • • Conducts site observation surveys and prepares field reports on the status of projects and completion of projects with respect to compliance to the plans and specifications Prepares punch list reports and determines corrective measures for on-site problems Prepares general condition survey reports Familiarizes oneself with codes, local project regulations, construction practices and the latest equipment functional concepts Familiarizes oneself and obeys all the projects safety requirements including specific on-site regulations Communicates all projects safety concerns to employees involved projects Performs routine calculations Applies and reinforces education programs Participates in professional trade associations and societies Acts as project coordinator with other field engineers, coordinating printing, presentation, and administration procedures Reviews shop drawings and submittals Develops MEP test procedures Develops MEP operating procedures Responds to RFI's when requested by PM Team Monitor’s performance of contractors Performs various administrative duties Performs other duties as assigned NKY CONSULTANT ARCHETICTES & ENGINEERING COMPANY LIMITED SITE MECHANICAL ENGINEER AL BAHA (11/01/2016- 03/03/2019) (HOUSING EMERGENCY FORCES BUILDINGS TRAINING PROJECT MINSITRY OF INTERIOR) My duties included: • The successful execution of the overall high-rise building • Fuel filling stations petrol/Diesel stations Ventilation, potable, Nonportable, Sport complex, Petrol pumps, Irrigation Plantation system piping, Spuming pool Administration blocks, Training classes, shopping malls, Central kitchen, laundry rooms, Security force main offices, HAVC duct • Firefighting pipe line, exhaust fan, sewage treatment plant, sewage pipe line, manhole chambers installation scope including supports, painting, testing and insulation for allocated areas of the site in accordance with the project schedule, cost and other KPIs • Ensuring the correct installation of piping, pipe supports valves and other in-line equipment in accordance with the drawings, specifications, and standards • Manage leakage, sewage water, how to reduce non-renewable water, water conservation, • Ensuring the maintenance of the necessary cleanliness of piping systems and the use of dry air purges were necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area huge quantity • Ensure that painting is applied correctly to surfaces that have been correctly prepared. Ensure that adequate QC checks are made to ensure the correct coat dry film thickness and adhesion • Ensure adequate safety distances during pneumatic testing • Organized disciplined, able to perform under pressure and manage multiple priorities and parallel tasks Saudi Arabia working experience • Make all installations checks prior to pre-commissioning activities • Make pre and post commissioning checks for all mechanical installations • Completing check lists provided by immediate supervisor • Preparing site reports (related to progress of testing and commissioning activities) • Understand the requirement for performance testing of systems/equipment and ensure that the performances are matching project documents • Understand testing and commissioning method statements. • Understand the test and commissioning plans • Insist for testing calibration of testing and commissioning equipment • To handle and understand the testing and commissioning equipment • Should know how to take readings from measuring instruments • Should have knowledge to understand performance requirements of systems/equipment from Project Documents and ask for clarifications • Coordinating with Contractors/testing and commissioning agencies • Non compromising with the performance Develop the Preferred Supplier List for Lifts (local and international suppliers) Saudi Service Electromechanical Works Company Position: Site Mechanical Engineer Saudi Arabia (23/12/2012 – 15/09/2015) Duties and Responsibilities: Overall years of my Experience in the Construction (execution, installation Development of Work instruction, job descriptions, lists & relevant forms in accordance • Conduction of self and internal audits • Performing root causes analysis of Non-Conformance Report (NCR) • In knowledge of HVAC Equipment such as Package Unit, AHUs, Fans, Pumps, HVAC Ductwork and Pipework Preventive Maintenance and Schedules, Daily, Monthly and Annual Checklists and Record keeping according to ISO-9001 Requirements/ Formats • Planning, Scheduling and Procurement on Power Plant Workshop • • • • • Workout and prepare work breakdown (activity list) for new projects Provide Technical Assistance to the construction team as needed. Review material acquisitions, RFIs, submittals, and ensure contract performance measures are met per the position discipline. Raising NCR for maintain Quality Evaluate the project construction to ensure compliance with standards for mechanical systems Installation of plant piping and design review according to standard, ASTM, ASME Working experience on Different Standard. (API 650, 620 ,510, 570 GB standard, ASME, ASTM, AWS D 1.1). NFPA, AWWA Supervisor, for tank erection for in al Qassim power plant & SWC water transmission distribution To check the material (Supplied) incoming of the tanks in the light of the packing list and drawing & to report to my chief about any missed items or incorrect material such as: check the shell course sheets; its thickness; its quantities; its dimension Abdul Ali Alajmi Company Saudi Arabia Mechanical Engineer over all KSA (07/2010- 12/2012) Duties and Responsibilities: • • • • • • • • • • Understanding of Isometrics, P&IDs, General Arrangement Drawings (GAD), Isometrics marking, cutting plans, BOQ and Welding calculations Extraction of BOQ/Material Take Off from isometrics, Inspection of all incoming material including pipes, fittings, consumables, and valves Responsible for all activity’s QA/QC regarding Piping Discussion with client regarding any piping modification Maintain the piping fabrication & installation record Raise the Corrective Action Request if observing any Violation of QC procedure Inspection of the welding including Gas tungsten Arc Welding (GTAW), Shielded Metal Discussion with client regarding any piping modification Ensure full compliance with company safety regulations and HSE management systems Major Jobs Executed: • • • • • • Provide prompt supervision and technical Oversight during the installation of Fire water Network Line for Refinery Up gradation project Joint inspection of underground pipelines and preparation of Dossier to hand over the Client Complete refurbishment of Storage tank and replacement of foam lines Fabrication welding and installation of piping system of pumps Re-routing of above and underground pipelines during Site clearance of Refinery Up gradation project Construction of new storage tanks along with its associated piping Siemens Engineering Construction Company Ltd, Karachi Pakistan As Site Mechanical Engineer Eni Gas Filed Project Sindh Pakistan -(05/2008 – 06/2010) • Ensure that all insulation materials are correctly applied. To ensure that cryogenic pipe insulation is applied with the correct vapors barriers and that cladding does not use screws which penetrate the vapors barrier • Ensure that testing is carried out using the correct medium i.e., pneumatic on all systems unless they contain water or steam • Ensure adequate safety distances during pneumatic testing • Ensure that all oxygen closing welds are inspected and signed off and that records are adequately kept of these inspections • Ensure all necessary QC checks are carried out and that weld quality processes are maintained. Ensure that all documentation is compiled as construction progresses and that this is checked and complete • Provision of emergency overflow to off-spec ponds and construction of the off-spec storage facilities. • Final effluent storage, sludge treatment and intermediate storage and auxiliary systems; All buildings, tanks, civil, mechanical, and electrical works included in the FEED design • Ensuring the correct installation of piping, pipe supports valves and other in-line equipment in accordance with the drawings, specifications, and standards PAINTING & INSULATION: Painting: I have also worked as an Engineer in Painting of piping & equipment’s (Anti- Corrosive Coatings). Responsibilities: Responsible for carrying and verifying the work at various construction points Such as Ensuring of surface preparation • Surface preparation performing • Monitoring of weather conditions • Evaluation of compressor (Air cleanliness) and surface preparation equipment. • Ensuring availability of arrived painting material as per approved project specifications. • Managing witnessing & Inspection of painting mixing. • Determination of Dry Film Thickness using DFT meter before inspection Project Management Related Activities. Monitors Contractor's submittals to local authorities and ensure that they are carried out in a timely manner in accordance with the contract document. AWARDS & ACHIEVEMENTS ▪ Got three times “Performance of excellent Demonstration” letter from My Directorate. KEY SKILLS • • • • • • Analyse and communicate complex ideas clearly and concisely Self-motivated and enthusiastic with proven teamwork Excellent verbal communication and planning skills User level computer skills like Internet, Office applications Ability to work unattended in long shifts without losing concentration Well organised and able to plan and prioritise accordingly COMPUTER SKILLS • Microsoft CAM • Microsoft Office Applications • AutoCAD-2010 for Drawing EDUCATION • Bachelor of Engineering in Mechanical Engineering PROFESSIONAL CERTIFICATIONS AFFILIATED WITH PAKISTAN ENGINEERING COUNCIL May 2008 PEC REGISTERED NO ME /21189 AFFILIATED WITH SAUDI ENGINEERING COUNCIL SEC REGISTERED NO ME -127402 AFFILIATED WITH HIGHER EDUCATION COMMISSION OF PAKISTAN HEC REGISTERED NO ME- /1773/04ME72 HEALTH & SAFETY ENGINEERING COURSES UK 1 FIRE FIGHTING COURSE REGISTERD IN UK (URS) 2 IOSH Safety Management Course. 3 SCAFFOLDING SAFETY 4 CANFINED SPACE SAFETY. 5 HAZARDS COMMUNICATION, From Karachi Safety International Trends Institute. 2. 3. 4. 5. APPROVED APPROVED FROM MOI (MINISTRY OF INTERIOR) SAUDI ARABIA. APPROVED FROM SEC (SAUDI ELECTRICITY COMPANY). K.S.A ARAMCO PLANT ERRECTION SECTION ENGINEER APPROVED AS MECHANICAL ENGINEER SWCC PROJECT KSA Exceptional command over written and spoken- (English, Urdu, Sindhi, Arabic) QUALITY IS MORE IMPORTANT THAN QUANTITY