Uploaded by abbasisudheer22

CV JAMIL

advertisement
ENGR. JAMIL AHMED
Cell +966583072094 E-mail: engrjamilme72@yahoo.com
Iqama: Transferable with KSA valid driving license
Career Summary
•
As Professional Mechanical Engineer, I have served in KSA for 15 years of construction experience in various
infrastructure works with diverse types of mega projects such as Pumping station, Power & Water transmission
line system, water storage tanks, wastewater treatment plants (STP), Potable line & drainage distribution lines,
irrigation lines, Sea water Desalination plant process & power plant, High rise building, heat & ventilation
Airconditioning work (HVAC), Firefighting pipeline work, & infrastructure projects PMC/CM work in Saudi
Arabia.
Project’s summary
• Site Field Mechanical Engineer in Mining & Metals Gold Project as PMC role in Bechtel engineering
company Saudi Arabia
• I worked as a Site Mechanical Engineer in Desalination plant in Jeddah western region area in Jizan with
SWCC with capacity 850000m3/day at Furazan Island with Dar Engineering Company
• I have worked as Site Mechanical Engineer in al Khatib & Alemi Saudi Consolidated Engineering Company,
Saudi Arabia for SWCC Strategic reservoirs projects in Makkah
• I have Worked as Site Mechanical Engineer in NKY Consultant Architecture Contracting Company in King
Abdullah Project –KAP2 (Ministry of Interior – Military & forces Project) for high rise buildings in Riyadh &
Al Baha areas
• I have Worked as a Site Mechanical Engineer for 380KV/132KV substation work in Saudi service
Electromechanical works Company (SSEM), Saudi Arabia (Al-Rashid Group) all over K.S.A
• I Have Worked as Mech Engineer in Aramco Projects in Saudi Arabia in Abdul Ali construction Company
Dammam, Abqaiq, Al Shuaiba
• I have worked as Mechanical Engineer with SIEMENS (Pakistan) Engineering Company ltd, at Bhat Gas
Filed Project Sindh, Pakistan
Career Path
•
Ambitious, motivated Mechanical Engineer/ Inspection Engineer Searching for a middle level position in a leading,
national / multinational engineering company.
•
Expertise: Pumping installation Piping Fabrication, Steel Structure Steel, Planning, Execution, Tank’s fabrication,
Maintenance, Project Management, HVAC, irrigation network firefighting, water supply and drainage network
design and supervision Rotary & static equipment installation, Health and Safety Champion in each project,
•
Bechtel Saudi Arabian Company K.S.A
•
Customer: MA’ADEN GOLD AND BASE METALS (MA’ADEN)- PMC Project Mansoura Massa rah
Gold Project
01/01/2021 continue.
•
As Field Mechanical Engineer, my core responsibilities to Coordinate and supervise the work of all Mechanical
related activities and operations
•
Receive / action Request(s) for Information (RFIs) that apply to mechanical works
•
RFIs requiring design feedback will be directed to the Designer for response. Review responses for adequacy
•
Take the role of Preparation of Concept Design and undertake technical reviews of complete Mechanical systems
for water transmission and distribution system including reservoirs, pumps and pumping stations, piping, valves,
chemical dosing system, surge protection system, compressed air system, fire water system, irrigation system and
HVAC system
•
I Check the Mechanical Engineering support to operational and construction sites/projects
•
Develop complete scope of Mechanical works, prepare specifications, and quantify related requirement
•
Participate in the procurement of Mechanical devices, equipment, and accessories Rotatory & Static
•
Implementing the latest applicable design and engineering Codes & Standards for all Assets of Project
•
I Manage, inspect, test, commission and documenting the construction of Mechanical equipment’s systems
•
To Participate in the innovation and implementation of new technologies particularly in relation to water networks
& distribution network
•
As field Mechanical engineer Maintaining and improving Health and Safety practice at site construction work
•
As engineer I Able to prepare a complete scope of Mechanical works including detailed design narrative of the
works, design drawings, as-builts, specifications and related quantities documents & make a report
•
Evaluate technical proposals from bidders for related design services or construction works
•
Planning and scheduling of Mechanical engineering design and design reviews for operational, construction and
commissioning activities
•
Supervise, inspect, identify, and resolve any related non-conformity in Mechanical engineering design, construction
and commissioning activities coming at site or changes in design
•
Review the engineering support during construction performed by contractors including reviewing technical
submittals and shop drawings, responding to contractor queries, evaluating change requests, resolving field issues
•
Ability to utilize the BIM Technology and models in design, construction, and commissioning of the related works
•
During the site visit Monitoring and safeguarding site Health and Safety performance procedures at site working
area
•
Assisting in the operation and optimization of the water supply network at site to the rout wise condition
•
As field Engineer, I Review the Contractor’s Mechanical change order proposals during the construction changes.
•
I am Prepared report weekly, monthly, progressively recommendations for Resident Engineer for review.
•
I Prepare recommendations for claims approval or rejection. for review and approval of mechanical submittals,
including plumbing pumps and piping systems (drain waste & vent, domestic water), fire protection (pumps, piping,
sprinkler heads), HVAC systems (VAV boxes, ductwork, process piping, chiller systems, controls, building
management system)
•
Monitor’s construction contractor mechanical installation and testing activities, including piping, leak tests,
ductwork & insulation, pumps, building management system, HVAC controls, domestic water systems, foundation
de-watering system, etc.
•
Ensuring the correct installation of piping, pipe supports valves and other in-line equipment in accordance with
the drawings, specifications, and standards.
•
During the construction to manage the leakage, sewage water, how to reduce non-renewable water, water
conservation,
•
Ensuring the maintenance of the necessary cleanliness of piping systems and the use of dry air purges were
necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area huge
quantity in Processing plant following work to be follow-up.
•
Reviewing and checking designs, drawings, and data by other engineers or by suppliers
•
Preparation or review of engineering studies and reports
•
Preparation or review of material quantity estimates
•
Uses engineering computer aided design/computer aided engineering (CAD/CAE) tools
•
Prepares letters for replies to vendor correspondence.
•
Monitors project controls within discipline.
•
Reviews design documents of equipment manufacturers or subcontractors of a moderate degree of complexity and
prepares comments and recommendations.
•
To Assists in preparation of forecasts, quantity take-offs and change orders
•
I Participates in a work environment that is based upon openness, trust, communication, teamwork, empowerment,
innovation, and satisfaction
DAR Engineering Company K.S.A
•
As Site Mechanical Engineer Company (SWCC/ Jeddah) Saudi Arabia -(1/1/20- 1/1/21)
•
Previous working in Satellite Desalination plant West Coast of Jizan Furazan Island & Qunfudah site
230000M3/day with SWCC Project working on Intake tower off shore grp pipe line, Gravity filter, Back wash tank,
Air scour blower, Ro Pass-1, RO pass-11, Permeate water tank , lime stone filter, product water tank, permeate
water co2 storage tank & dosing system, CIP system, chemical dosing system, Neutralization system, sludge settling
system, Firefighting tank and Disinfection & PH correction system which includes Pumps ( Back wash pump, RO
pass pump Low pressure & High pressure pump, product water pump, CO2 pump, flushing pump, potable pump,
service & intake pump worked at checked flow & steel structure supporting & pipe line lying work construction of
tank capacity of 1700000m3 for water storage & work on transmission line from Desalination plant existing tank
SWCC plant purpose pipe Día (600mm to 1200mm). Review, all pipe Día HDPE, GIS, SS, GRP, PVC, UPVE ETC
approve and process all mechanical technical submittals on shore & offshore work in Farzan Island & Qunfudah
in Jizan.
•
Lead and Provide e technical support for implementation of the SWRO desalination projects, Working as the
consultant on Owners Engineering mission with specific focus on the site construction supervision of the SWRO
desalination Project
•
Review the EPC Contractor / OEM s site construction programmed of the SWRO plant and comments on the
practically of implementation.
Review the method statement of the SWRO Process related equipment and verify its compliance with reference to
the project specification, applicable codes and standards and good industry practice
carry out site inspections for the SWRO process equipment as per the ITPs method state montane advice
Observation, Non- Conformity, and punch Points
Verify whether adequate supervision from the OEMs is available for all major and critical equipment of the SWRO
process.
Verify whether the interface construction with the Client interfaces other sub – contractor interfaces is constructed
in accordance with the drawings and method statements
Verify the mechanical completion of the SWRO Plant
Review the EPC Contractor / OEM documentation on the pre-commissioning, commissioning plants, Procedures,
start-up and acceptance tests performance test and reliability test procedures
Witness the pre-commissioning, commissioning, start-up, and acceptance test for the SWRP Process equipment.
Witness the performance test of the SWRO Plant, verify whether the performance guarantees as per the EPC
contractor are met
Witness the reliability run test of the SWRO Plant and advice any major issues noticed in operation of the SWRO
key process equipment & chemicals (Ferric Chloride, SBS, Coagulant, Caustics soda, Antiscalant, sodium
hypochlorite, polyelectrolyte, CO2, chlorine di oxide, HCL, Naocl2 ) to use all chemicals to brings better quality
of treatment water & equipment safer position manner maintained the water quality process checked SDI & the
water quality every day to improve continuity of water supply, increasing environmental compliance.
Support the OE Construction Manager to verify the functional guarantees and completion of the SWRO plant are
met.
Review the punch list of the SWRO equipment.
Review the as- built documentation for the SWRO equipment.
•
•
•
•
•
•
•
•
•
•
•
•
Khatib & Alemi Saudi Consolidated Engineering Company K.S.A
As Site Mechanical Engineer (SWCC Reservoirs Phase-11 Makkah-Taif Project)
•
•
•
•
•
•
•
•
•
Saudi Arabia- (03/03/2019 – 1/01/20)
Review material acquisitions
RFIs, submittals, and ensure contract performance measures are met per the position discipline.
Raising NCR for maintain Quality.
Evaluate the project construction to ensure compliance with standards for mechanical systems Installation of plant
piping and design review according to ASTM, ASME, API 650, 620 ,510, 570, AWS D 1.1, NFPA, AWWA
standard’s
To check the material (Supplied) incoming of the tanks in the light of the packing list and drawing & to report to
my chief about any missed items or incorrect material such as: check the shell course sheets; its thickness; its
quantities; its dimension
Implementation & development of Commissioning plans & procedures
Assists in engineering design drawings reviews
Interacts with contractors, interprets design and specifications
Deals with clients, tries to resolve problems within the scope of the design
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Conducts site observation surveys and prepares field reports on the status of projects and completion of projects with
respect to compliance to the plans and specifications
Prepares punch list reports and determines corrective measures for on-site problems
Prepares general condition survey reports
Familiarizes oneself with codes, local project regulations, construction practices and the latest equipment functional
concepts
Familiarizes oneself and obeys all the projects safety requirements including specific on-site regulations
Communicates all projects safety concerns to employees involved projects
Performs routine calculations
Applies and reinforces education programs
Participates in professional trade associations and societies
Acts as project coordinator with other field engineers, coordinating printing, presentation, and administration
procedures
Reviews shop drawings and submittals
Develops MEP test procedures
Develops MEP operating procedures
Responds to RFI's when requested by PM Team
Monitor’s performance of contractors
Performs various administrative duties
Performs other duties as assigned
NKY CONSULTANT ARCHETICTES & ENGINEERING COMPANY LIMITED
SITE MECHANICAL ENGINEER AL BAHA (11/01/2016- 03/03/2019)
(HOUSING EMERGENCY FORCES BUILDINGS TRAINING PROJECT MINSITRY OF INTERIOR)
My duties included:
•
The successful execution of the overall high-rise building
•
Fuel filling stations petrol/Diesel stations Ventilation, potable, Nonportable, Sport complex, Petrol pumps,
Irrigation Plantation system piping, Spuming pool Administration blocks, Training classes, shopping malls,
Central kitchen, laundry rooms, Security force main offices, HAVC duct
•
Firefighting pipe line, exhaust fan, sewage treatment plant, sewage pipe line, manhole chambers installation
scope including supports, painting, testing and insulation for allocated areas of the site in accordance with the
project schedule, cost and other KPIs
• Ensuring the correct installation of piping, pipe supports valves and other in-line equipment in accordance with
the drawings, specifications, and standards
• Manage leakage, sewage water, how to reduce non-renewable water, water conservation,
• Ensuring the maintenance of the necessary cleanliness of piping systems and the use of dry air purges were
necessary bubbler, water network distribution at all areas of buildings & water utilities in consumption’s area
huge quantity
• Ensure that painting is applied correctly to surfaces that have been correctly prepared. Ensure that adequate QC
checks are made to ensure the correct coat dry film thickness and adhesion
• Ensure adequate safety distances during pneumatic testing
• Organized disciplined, able to perform under pressure and manage multiple priorities and parallel tasks Saudi
Arabia working experience
• Make all installations checks prior to pre-commissioning activities
• Make pre and post commissioning checks for all mechanical installations
• Completing check lists provided by immediate supervisor
• Preparing site reports (related to progress of testing and commissioning activities)
• Understand the requirement for performance testing of systems/equipment and ensure that the performances are
matching project documents
• Understand testing and commissioning method statements.
• Understand the test and commissioning plans
• Insist for testing calibration of testing and commissioning equipment
• To handle and understand the testing and commissioning equipment
• Should know how to take readings from measuring instruments
• Should have knowledge to understand performance requirements of systems/equipment from Project Documents
and ask for clarifications
• Coordinating with Contractors/testing and commissioning agencies
• Non compromising with the performance Develop the Preferred Supplier List for Lifts (local and international
suppliers)
Saudi Service Electromechanical Works Company
Position: Site Mechanical Engineer Saudi Arabia (23/12/2012 – 15/09/2015)
Duties and Responsibilities:
Overall years of my Experience in the Construction (execution, installation Development of Work instruction, job
descriptions, lists & relevant forms in accordance
•
Conduction of self and internal audits
•
Performing root causes analysis of Non-Conformance Report (NCR)
•
In knowledge of HVAC Equipment such as Package Unit, AHUs, Fans, Pumps, HVAC Ductwork and Pipework
Preventive Maintenance and Schedules, Daily, Monthly and Annual Checklists and Record keeping according to
ISO-9001 Requirements/ Formats
•
Planning, Scheduling and Procurement on Power Plant Workshop
•
•
•
•
•
Workout and prepare work breakdown (activity list) for new projects
Provide Technical Assistance to the construction team as needed. Review material acquisitions, RFIs, submittals,
and ensure contract performance measures are met per the position discipline. Raising NCR for maintain Quality
Evaluate the project construction to ensure compliance with standards for mechanical systems Installation of
plant piping and design review according to standard, ASTM, ASME
Working experience on Different Standard. (API 650, 620 ,510, 570 GB standard, ASME, ASTM, AWS D 1.1).
NFPA, AWWA
Supervisor, for tank erection for in al Qassim power plant & SWC water transmission distribution
To check the material (Supplied) incoming of the tanks in the light of the packing list and drawing & to report to
my chief about any missed items or incorrect material such as: check the shell course sheets; its thickness; its
quantities; its dimension
Abdul Ali Alajmi Company Saudi Arabia
Mechanical Engineer over all KSA (07/2010- 12/2012)
Duties and Responsibilities:
•
•
•
•
•
•
•
•
•
•
Understanding of Isometrics, P&IDs, General Arrangement Drawings (GAD), Isometrics marking, cutting plans,
BOQ and Welding calculations
Extraction of BOQ/Material Take Off from isometrics,
Inspection of all incoming material including pipes, fittings, consumables, and valves
Responsible for all activity’s QA/QC regarding Piping
Discussion with client regarding any piping modification
Maintain the piping fabrication & installation record
Raise the Corrective Action Request if observing any Violation of QC procedure
Inspection of the welding including Gas tungsten Arc Welding (GTAW), Shielded Metal
Discussion with client regarding any piping modification
Ensure full compliance with company safety regulations and HSE management systems
Major Jobs Executed:
•
•
•
•
•
•
Provide prompt supervision and technical Oversight during the installation of Fire water Network Line for
Refinery Up gradation project
Joint inspection of underground pipelines and preparation of Dossier to hand over the Client
Complete refurbishment of Storage tank and replacement of foam lines
Fabrication welding and installation of piping system of pumps
Re-routing of above and underground pipelines during Site clearance of Refinery Up gradation project
Construction of new storage tanks along with its associated piping
Siemens Engineering Construction Company Ltd, Karachi Pakistan
As Site Mechanical Engineer Eni Gas Filed Project Sindh Pakistan -(05/2008 – 06/2010)
•
Ensure that all insulation materials are correctly applied. To ensure that cryogenic pipe insulation is applied
with the correct vapors barriers and that cladding does not use screws which penetrate the vapors barrier
•
Ensure that testing is carried out using the correct medium i.e., pneumatic on all systems unless they contain water
or steam
•
Ensure adequate safety distances during pneumatic testing
•
Ensure that all oxygen closing welds are inspected and signed off and that records are adequately kept of these
inspections
•
Ensure all necessary QC checks are carried out and that weld quality processes are maintained. Ensure that all
documentation is compiled as construction progresses and that this is checked and complete
•
Provision of emergency overflow to off-spec ponds and construction of the off-spec storage facilities.
•
Final effluent storage, sludge treatment and intermediate storage and auxiliary systems; All buildings, tanks, civil,
mechanical, and electrical works included in the FEED design
•
Ensuring the correct installation of piping, pipe supports valves and other in-line equipment in accordance with
the drawings, specifications, and standards
PAINTING & INSULATION:
Painting: I have also worked as an Engineer in Painting of piping & equipment’s (Anti- Corrosive Coatings).
Responsibilities:
Responsible for carrying and verifying the work at various construction points Such as Ensuring of surface
preparation
•
Surface preparation performing
•
Monitoring of weather conditions
•
Evaluation of compressor (Air cleanliness) and surface preparation equipment.
•
Ensuring availability of arrived painting material as per approved project specifications.
•
Managing witnessing & Inspection of painting mixing.
•
Determination of Dry Film Thickness using DFT meter before inspection
Project Management Related Activities.
Monitors Contractor's submittals to local authorities and ensure that they are carried out in a timely manner in
accordance with the contract document.
AWARDS & ACHIEVEMENTS
▪ Got three times “Performance of excellent Demonstration” letter from My Directorate.
KEY SKILLS
•
•
•
•
•
•
Analyse and communicate complex ideas clearly and concisely
Self-motivated and enthusiastic with proven teamwork
Excellent verbal communication and planning skills
User level computer skills like Internet, Office applications
Ability to work unattended in long shifts without losing concentration
Well organised and able to plan and prioritise accordingly
COMPUTER SKILLS
•
Microsoft CAM
•
Microsoft Office Applications
•
AutoCAD-2010 for Drawing
EDUCATION
•
Bachelor of Engineering in Mechanical Engineering
PROFESSIONAL CERTIFICATIONS
AFFILIATED WITH PAKISTAN ENGINEERING COUNCIL
May 2008
PEC REGISTERED NO ME /21189
AFFILIATED WITH SAUDI ENGINEERING COUNCIL
SEC REGISTERED NO ME -127402
AFFILIATED WITH HIGHER EDUCATION COMMISSION OF PAKISTAN
HEC REGISTERED NO ME- /1773/04ME72
HEALTH & SAFETY ENGINEERING COURSES UK
1 FIRE FIGHTING COURSE REGISTERD IN UK (URS)
2 IOSH Safety Management Course.
3 SCAFFOLDING SAFETY
4 CANFINED SPACE SAFETY.
5 HAZARDS COMMUNICATION,
From Karachi Safety International Trends Institute.
2.
3.
4.
5.
APPROVED
APPROVED FROM MOI (MINISTRY OF INTERIOR) SAUDI ARABIA.
APPROVED FROM SEC (SAUDI ELECTRICITY COMPANY). K.S.A
ARAMCO PLANT ERRECTION SECTION ENGINEER
APPROVED AS MECHANICAL ENGINEER SWCC PROJECT KSA
Exceptional command over written and spoken- (English, Urdu, Sindhi, Arabic)
QUALITY IS MORE IMPORTANT THAN QUANTITY
Download